Difference between revisions of "EGI-InSPIRE:Sweden-QR3"

From EGIWiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Template:Op menubar}}
+
{{Template:EGI-Inspire menubar}}
 +
 
 
{{Template:Inspire_reports_menubar}}
 
{{Template:Inspire_reports_menubar}}
 
{{TOC_right}}
 
{{TOC_right}}
[[Category:NGI QR Reports]]
 
  
 
{| border="1" cellspacing="0" cellpadding="2"
 
{| border="1" cellspacing="0" cellpadding="2"

Latest revision as of 18:40, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
3 NGI_SE Sweden Mats Nylén


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
20110119 Stockholm SweGrid All hands meeting 15

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
20101109 Copenhagen NDGF Strategy Workshop 2
20101202 Copenhagen NDGF All Hands meeting 11
20101217 München EGI-Inspire PMB 1
20110124-25 Amsterdam OMB meeting 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=153
20110125 Amsterdam OTAG 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=245


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

During the third quarter, grid operations has progressed smoothly. The availability for the Swedish Tier2 (SE-SNIC-T2) has been well over 95%.

Various persons within Sweden continue to contribute towards in task-forces etc.

During the end of the quarter major upgrades of the Swedish tape storage commenced. This will be completed during the next quarter.

The NDGF transition into a new organization started from Januari 1st, and will continue throughout 2011. This is a major revision of the NDGF organization, even so, the strong collaboration among the Nardic countries will continue.

2.2. Main Achievements

During the third quarter monitoring switched to Nagios.

A major update of the accounting system (SGAS) was performed as a part of the NDGF RT project.

As planned a one-day meeting with all the sites were held on Januari 19 2011.

2.3. Issues and mitigation

Interoperability between the ARC middleware and the operational and monitoring tools remains a major issue. The Information systems of ARC does not really work that well when reported through BDII.

Issue Description Mitigation Description