Difference between revisions of "EGI-InSPIRE:Sa1 2013-04-02"

From EGIWiki
Jump to: navigation, search
(Documentation)
 
(11 intermediate revisions by 8 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
+
{{Template:EGI-Inspire menubar}}
 +
 
 
{{Template:Inspire_reports_menubar}}
 
{{Template:Inspire_reports_menubar}}
 
{{TOC_right}}  
 
{{TOC_right}}  
[[Category:SA1 weekly report]]
+
 
 
=Progress of SA1 issues=  
 
=Progress of SA1 issues=  
 
<!-- T. Ferrari -->
 
<!-- T. Ferrari -->
Line 15: Line 16:
  
 
MEETINGS
 
MEETINGS
 +
* Federated cloud task force
  
 
ACTIVITIES
 
ACTIVITIES
 +
* Contacted Rob Quick for a presentation about OSG Champions activity (CF2013)
 +
* ops VO management
  
 
=SA1.2 Security=  
 
=SA1.2 Security=  
 
<!-- D. Kelsey -->
 
<!-- D. Kelsey -->
 +
* Not much because of Easter
 +
* Central Emergency User Suspension
 +
* Preparing for the EGI CF in Manchester
 +
* One new vulnerability reported
 +
* EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension
  
 
= SA1.3 Staged rollout =
 
= SA1.3 Staged rollout =
 
<!-- J. Pina -->
 
<!-- J. Pina -->
 +
 +
* creation of the release for the last EMI-1 products [http://www.eu-emi.eu/emi-1-kebnekaise-updates/-/asset_publisher/Ir6q/content/update-24-28-03-2013-v-1-14-2-2 update 24]
 +
 +
* Creation of the last EMI-2 [http://www.eu-emi.eu/emi-2-matterhorn/updates/-/asset_publisher/9AgN/content/update-10-02-04-2013-v-2-6-2-1 update 10]
 +
** Ready for production:
 +
*** EMI: WMS 3.4.1, Cream-1.14.3
 +
*** IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
 +
 +
* Continuing of the activities regarding the UMD-3 [http://www.eu-emi.eu/releases/emi-3-montebianco/products EMI-3]  topics :
 +
** Continuing of the UMD-3 staged rollout activities:
 +
*** SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).
  
 
=SA1.3 Integration=
 
=SA1.3 Integration=
Line 37: Line 57:
 
=SA1.6 Helpdesk=  
 
=SA1.6 Helpdesk=  
 
<!-- G. Grein -->
 
<!-- G. Grein -->
 +
* Ticket monitoring
 +
* Preparing GGUS April release
 +
* Weekly phone conference for discussing open requests (shopping list) on GGUS
 +
* Preparing relevant meetings at EGI CF in Manchester
  
 
=SA1.7 Support=
 
=SA1.7 Support=
 
<!--  Trompert -->
 
<!--  Trompert -->
 +
* followup of new sites with new EMI-1 alarms for software retirement
 +
* follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
 +
* preparation ROD meeting next week at the CF
  
 
== Software Support ==
 
== Software Support ==
 
<!-- A Krenek -->
 
<!-- A Krenek -->
 +
Contribution to D5.9 provided. Otherwise nothing special to report
  
 +
{| class="wikitable"
 +
|-
 +
! DMSU tickets flow Mar 24-31
 +
|-
 +
| assigned
 +
| 15
 +
|-
 +
| back to tpm
 +
| 0
 +
|-
 +
| reassigned to 3rd level
 +
| 14
 +
|-
 +
| solved
 +
| 4
 +
|}
 +
 +
{| class="wikitable"
 +
|-
 +
! open DMSU tickets status
 +
|-
 +
| assigned
 +
| 2
 +
|-
 +
| in progress
 +
| 3
 +
|-
 +
| waiting for reply
 +
| 1
 +
|-
 +
| on hold
 +
| 1
 +
|}
  
 
== Network Support  ==
 
== Network Support  ==
Line 49: Line 110:
  
 
=SA1.8 Availability and core services=
 
=SA1.8 Availability and core services=
<!--C. Kanellopoulos-->
+
<!--P. Korosoglou-->
 +
Nothing new to report
 +
 
 
== Documentation ==
 
== Documentation ==
 
<!-- M. Krakowian -->
 
<!-- M. Krakowian -->

Latest revision as of 17:23, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.

SA1.1 Activity Management

MEETINGS

  • Federated cloud task force

ACTIVITIES

  • Contacted Rob Quick for a presentation about OSG Champions activity (CF2013)
  • ops VO management

SA1.2 Security

  • Not much because of Easter
  • Central Emergency User Suspension
  • Preparing for the EGI CF in Manchester
  • One new vulnerability reported
  • EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension

SA1.3 Staged rollout

  • creation of the release for the last EMI-1 products update 24
  • Creation of the last EMI-2 update 10
    • Ready for production:
      • EMI: WMS 3.4.1, Cream-1.14.3
      • IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
  • Continuing of the activities regarding the UMD-3 EMI-3 topics :
    • Continuing of the UMD-3 staged rollout activities:
      • SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).

SA1.3 Integration

SA1.4 Central tools

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • Preparing GGUS April release
  • Weekly phone conference for discussing open requests (shopping list) on GGUS
  • Preparing relevant meetings at EGI CF in Manchester

SA1.7 Support

  • followup of new sites with new EMI-1 alarms for software retirement
  • follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
  • preparation ROD meeting next week at the CF

Software Support

Contribution to D5.9 provided. Otherwise nothing special to report

DMSU tickets flow Mar 24-31
assigned 15
back to tpm 0
reassigned to 3rd level 14
solved 4
open DMSU tickets status
assigned 2
in progress 3
waiting for reply 1
on hold 1

Network Support

SA1.8 Availability and core services

Nothing new to report

Documentation

Nothing new to report

Meetings