Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets. | * Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets. | ||
* The new ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012. | |||
* ... | * ... | ||
Line 54: | Line 56: | ||
= 4. Plans for the next period = | = 4. Plans for the next period = | ||
<!-- provide your text below --> | <!-- provide your text below --> | ||
* ... | |||
* Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page |
Revision as of 14:44, 30 April 2012
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
2. Main Achievements
- Continue publishing of A/R league tables - OPS
- Continue publishing of A/R reports for NGI Core services (top-BDII)
- The RC OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_Centre_OLA:_Release_Notes#Resource_Centre_OLA_v._1.1 | Changes ]] were approved at OMB (2012-02-28)
- The RP OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_infrastructure_Provider_OLA:_Release_Notes#Release_notes_v._1.1 | Changes ]] were approved at OMB (2012-02-28)
- The 1st draft of EGI.eu OLA has been written.
- Assessment of the EGI.eu central tools service level targets.
The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
The OMB agreed to the proposed service level targets.
- The new ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
- ...
EGI Catch-All Core Service
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
4. Plans for the next period
- ...
- Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page