Difference between revisions of "EGI-InSPIRE:SA1.8-QR4"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
= 2. Main Achievements = | = 2. Main Achievements = | ||
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[https://rt.egi.eu/rt/Ticket/Display.html?id=1084] was crated to JRA1. | Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[https://rt.egi.eu/rt/Ticket/Display.html?id=1084] was crated to JRA1. | ||
An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [https://rt.egi.eu/rt/Ticket/Display.html?id=1526]. | An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [https://rt.egi.eu/rt/Ticket/Display.html?id=1526]. | ||
Revision as of 10:00, 27 April 2011
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|
2. Main Achievements
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[1] was crated to JRA1.
An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [2].
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|
4. Plans for the next period
Continue work on the EGI-NGI and Core Services OLA.
Start enforcing of increased Availability/Reliability thresholds from May 2011 (PY2) onwards.
5. Number of sites suspended
Month | Suspended sites |
---|---|
January 2011 | 2 |
February 2011 | 0 |
March 2011 | 0 |