Difference between revisions of "EGI-InSPIRE:SA1.7-QR12"
(14 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
= 1. Task Meetings = <!-- | = 1. Task Meetings = <!-- | ||
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | ||
Line 15: | Line 15: | ||
! style="width: 50%" | Outcome | ! style="width: 50%" | Outcome | ||
|- | |- | ||
| ... | |23-4-2013 | ||
| .... | |https://indico.egi.eu/indico/conferenceDisplay.py?confId=1537 | ||
| ... | |Arc probes revisited update | ||
| ... | |https://indico.egi.eu/indico/conferenceDisplay.py?confId=1537 | ||
|- | |||
| 10-4-2013 | |||
| https://indico.egi.eu/indico/conferenceDisplay.py?confId=1655 | |||
| COD F2F | |||
| https://indico.egi.eu/indico/getFile.py/access?resId=minutes&materialId=minutes&confId=1655 | |||
|- | |||
|10-4-2013 | |||
|https://indico.egi.eu/indico/contributionDisplay.py?sessionId=20&contribId=21&confId=1222 | |||
|ROD workshop at EGI CF 13 | |||
|https://indico.egi.eu/indico/contributionDisplay.py?sessionId=20&contribId=21&confId=1222 | |||
|- | |- | ||
|13-3-2013 | |||
|https://indico.egi.eu/indico/conferenceDisplay.py?confId=1353 | |||
|glite EMI probe review | |||
|https://indico.egi.eu/indico/getFile.py/access?resId=0&materialId=minutes&confId=1353 | |||
|- | |||
|27-2-2013 | |||
|https://indico.egi.eu/indico/conferenceDisplay.py?confId=1341 | |||
|Arc probe review | |||
|https://indico.egi.eu/indico/getFile.py/access?resId=minutes&materialId=minutes&confId=1341 | |||
|- | |||
|4-2-2013 | |||
|https://indico.egi.eu/indico/conferenceDisplay.py?confId=1327 | |||
|SAM/Nagios probe WG kick off | |||
|https://indico.egi.eu/indico/getFile.py/access?resId=0&materialId=minutes&confId=1327 | |||
|} | |} | ||
Line 29: | Line 53: | ||
'''Followup upgrades of unsupported software''' | '''Followup upgrades of unsupported software''' | ||
There were quite a large number of sites that were still running EMI-1 software that is no longer supported. Last quarter a campaign was started to make these sites upgrade their services that run this software. This campaign was continued this quarter. COD has requested RODs to issued GGUS tickets to these sites and is following this up. | There were quite a large number of sites that were still running EMI-1 software that is no longer supported. Last quarter a campaign was started to make these sites upgrade their services that run this software. This campaign was continued this quarter. COD has requested RODs to issued GGUS tickets to these sites and is following this up. | ||
'''ROD performance index''' | '''ROD performance index''' | ||
Line 55: | Line 76: | ||
At the EGI CF we have organized a ROD teams session. | At the EGI CF we have organized a ROD teams session. | ||
'''Nagios Probe working group''' | |||
This quarter a nagios probe working group has been setup having the following tasks: | |||
* revise probes before they are integrated into SAM framework | |||
* evaluate probe- and monitoring-related improvements | |||
COD is leading this activity. The WG met 4 times covering issues of ARC and gLite probes. | |||
= 3. Issues and Mitigation = <!-- fill the table below | = 3. Issues and Mitigation = <!-- fill the table below | ||
Line 64: | Line 92: | ||
! scope="col" | Mitigation Description | ! scope="col" | Mitigation Description | ||
|- | |- | ||
| | | Grid Oversight: None | ||
| None | |||
| | | | ||
|- | |- | ||
Line 76: | Line 105: | ||
We are busy developing a procedure to incorporate test resources into the EGI infrastructure, review the certification procedures and to identify possible changes to the operational tools. This discussion is now finished and we will make further progress on this. | We are busy developing a procedure to incorporate test resources into the EGI infrastructure, review the certification procedures and to identify possible changes to the operational tools. This discussion is now finished and we will make further progress on this. | ||
'''Further plans''' | |||
We will continue the activities that we already doing. Further we are going to proceed with carrying out the plan outlined in https://indico.egi.eu/indico/getFile.py/access?contribId=4&resId=0&materialId=slides&confId=1100 and startup the plans described in https://documents.egi.eu/public/ShowDocument?docid=1529. More specific, the next quarter we will stop the followup of the top-BDII and RPI follow-up as a part of these plans. |
Latest revision as of 19:11, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
2. Main Achievements
Grid Oversight
Followup upgrades of unsupported software
There were quite a large number of sites that were still running EMI-1 software that is no longer supported. Last quarter a campaign was started to make these sites upgrade their services that run this software. This campaign was continued this quarter. COD has requested RODs to issued GGUS tickets to these sites and is following this up.
ROD performance index
For background information on this, have a look at SA1.7-QR6, section RP OLA and ROD metrics. Since October 2011 we have been asking all NGIs above 10 items in the COD dashboard duting one month about the explanation through GGUS, what was the reason of such result and how do you plan to improve the situation. Currently we are continuing to collect and investigate these metrics and also to correlate this with other metrics and see if we can draw some conclusions from them.
Availability followup
See SA1.7-QR6 for more background information. COD has issued GGUS tickets to sites that are below 70% availability for more than three consecutive months that are eligible for suspension.
Unknown Followup
See SA1.7-QR6 and SA1.7-QR6 for more background information. In Q11 we have continued this activity. In addition, we have started discussions with the SAM nagios team to have a nagios probe that will raise alarms on the operations dashboard when the unknown percentage is higher than a certain threshold. These discussions are nearly completed.
Followup NGI Core Services availability
We have issued GGUS tickets to NGIs that do not meet the 99% availability requirement. In februari 2012 we have started up this activity. At first we have only submitted GGUS tickets to NGIs informing the of their low top-level BDII availability. This activity has been continued in this quarter.
ROD teams slot at EGI CF 13
At the EGI CF we have organized a ROD teams session.
Nagios Probe working group
This quarter a nagios probe working group has been setup having the following tasks:
* revise probes before they are integrated into SAM framework * evaluate probe- and monitoring-related improvements
COD is leading this activity. The WG met 4 times covering issues of ARC and gLite probes.
3. Issues and Mitigation
Issue Description | Mitigation Description | |
---|---|---|
Grid Oversight: None | None | |
4. Plans for the next period
Grid Oversight
Review of certification procedures etc
We are busy developing a procedure to incorporate test resources into the EGI infrastructure, review the certification procedures and to identify possible changes to the operational tools. This discussion is now finished and we will make further progress on this.
Further plans
We will continue the activities that we already doing. Further we are going to proceed with carrying out the plan outlined in https://indico.egi.eu/indico/getFile.py/access?contribId=4&resId=0&materialId=slides&confId=1100 and startup the plans described in https://documents.egi.eu/public/ShowDocument?docid=1529. More specific, the next quarter we will stop the followup of the top-BDII and RPI follow-up as a part of these plans.