(Under Construction)
 
(Under Construction)  
 
= 1. Task Meetings <!--
= 1. Task Meetings <!--
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes.  
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes.  
OMB meeting will be reported under task TSA1.1 only. Monday Operations meetings need to be reported under task TSA1.3 only. Training events will be recorded in the training event registry and need not be mentioned here.
OMB meeting will be reported under task TSA1.1 only. Monday Operations meetings need to be reported under task TSA1.3 only. Training events will be recorded in the training event registry and need not be mentioned here.
--> =
--> =


There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs.  
There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs.  


= 2. Main Achievements  =
= 2. Main Achievements  =
'''Repository'''  
'''Repository'''  
<div>New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database . </div>
<div>New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database . </div> <div>Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.</div><div>Bug-fixing</div><div>Support of sites having problems publishing</div><div>Optimisation of infrastructure</div>  
<div>Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.</div>
'''Portal''': <!--
'''Portal''': <!--
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
-->No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues:  
--><strike>''No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues:''</strike>


- #GGUS 70193 - The accounting portal with metrics does not work with firefox4
<br>
- #GGUS 69846 - EGI accounting pages show wrong values
- #GGUS 62380 - HOW-TO of Foreign USER COMPUTATION
- #GGUS 68953 - GGUS-FAQ about Responsible Units
- #GGUS 69070 - [2] EGI Accounting portal - VO member view option
- #GGUS 58980 - Wrong Italian Tier2 federations definition on accounting portal
- #GGUS 67374 - The accounting information for prod.vo.eu-eela.eu disappeared from the VO Manager view


= 3. Issues and Mitigation = <!-- fill the table below -->
= 3. Issues and Mitigation = <!-- fill the table below -->  


{| border="1" cellspacing="0" cellpadding="2"
{| cellspacing="0" cellpadding="2" border="1"
|-
|-
! scope="col" | Issue Description  
! scope="col" | Issue Description  
! scope="col" | Mitigation Description
! scope="col" | Mitigation Description
|-
|-
| xxxxxxx CESGA&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  
| Redevelopment of infrastructure taking longer than planned &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  
| yyy
| Employing contractor to backfill other duties
|-
|-
| Accounting Portal roadmap delay
| Large flow of jobs from sites catching up and republishing, sometime in error,overloaded the service, which resulted in lots of sites failing to publish for a few days..&nbsp; <br>
| Will be complete very early in Q5.
| Regular optimisation of the consumer database has greatly increased the capacity of the consumer.
|-
|-
| <span>The broker had some issues during March which only affected a small percentage of sites. </span>
| <span>
| <font color="#1f497d" size="3" face="Calibri">This was solved in less than a week and there was no loss of data.</font>
 
 
 
</span>
| <font size="3" face="Calibri" color="#1f497d"><br></font>
|}
|}


Line 47: Line 48:
<!-- provide your text below -->1.&nbsp;(A) New Central Infrastructure in Production at RAL.  
<!-- provide your text below -->1.&nbsp;(A) New Central Infrastructure in Production at RAL.  


2. (A) Central Server ready to receive records from new clients.
2. (A) Central Server ready to receive records from new clients.
 
3. (A) All external services ready to start publishing by new method.  


3. (A) All external services ready to start publishing by new method.
4. (A) Workshop at TF

Revision as of 09:42, 8 August 2011


(Under Construction)

1. Task Meetings

There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs.

2. Main Achievements

Repository

New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database .
Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.
Bug-fixing
Support of sites having problems publishing
Optimisation of infrastructure

Portal: No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues:


3. Issues and Mitigation

Issue Description Mitigation Description
Redevelopment of infrastructure taking longer than planned                         Employing contractor to backfill other duties
Large flow of jobs from sites catching up and republishing, sometime in error,overloaded the service, which resulted in lots of sites failing to publish for a few days.. 
Regular optimisation of the consumer database has greatly increased the capacity of the consumer.




4. Plans for the next period

APEL=A, Portal=P

1. (A) New Central Infrastructure in Production at RAL.

2. (A) Central Server ready to receive records from new clients.

3. (A) All external services ready to start publishing by new method.

4. (A) Workshop at TF