= 1. Task Meetings <!-- | = 1. Task Meetings <!-- | ||
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | ||
OMB meeting will be reported under task TSA1.1 only. Monday Operations meetings need to be reported under task TSA1.3 only. Training events will be recorded in the training event registry and need not be mentioned here. | OMB meeting will be reported under task TSA1.1 only. Monday Operations meetings need to be reported under task TSA1.3 only. Training events will be recorded in the training event registry and need not be mentioned here. | ||
--> = | --> = | ||
There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs. | There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs. | ||
= 2. Main Achievements = | = 2. Main Achievements = | ||
'''Repository''' | '''Repository''' | ||
<div>New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database . </div> | <div>New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database . </div> <div>Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.</div><div>Bug-fixing</div><div>Support of sites having problems publishing</div><div>Optimisation of infrastructure</div> | ||
<div>Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.</div> | |||
'''Portal''': <!-- | '''Portal''': <!-- | ||
Note. This is a detailed account of progress over the previous quarter of activities within the task. | Note. This is a detailed account of progress over the previous quarter of activities within the task. | ||
-->No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues: | --><strike>''No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues:''</strike> | ||
<br> | |||
= 3. Issues and Mitigation = <!-- fill the table below --> | = 3. Issues and Mitigation = <!-- fill the table below --> | ||
{| | {| cellspacing="0" cellpadding="2" border="1" | ||
|- | |- | ||
! scope="col" | Issue Description | ! scope="col" | Issue Description | ||
! scope="col" | Mitigation Description | ! scope="col" | Mitigation Description | ||
|- | |- | ||
| | | Redevelopment of infrastructure taking longer than planned | ||
| | | Employing contractor to backfill other duties | ||
|- | |- | ||
| | | Large flow of jobs from sites catching up and republishing, sometime in error,overloaded the service, which resulted in lots of sites failing to publish for a few days.. <br> | ||
| | | Regular optimisation of the consumer database has greatly increased the capacity of the consumer. | ||
|- | |- | ||
| <span> | | <span> | ||
| <font | |||
</span> | |||
| <font size="3" face="Calibri" color="#1f497d"><br></font> | |||
|} | |} | ||
Line 47: | Line 48: | ||
<!-- provide your text below -->1. (A) New Central Infrastructure in Production at RAL. | <!-- provide your text below -->1. (A) New Central Infrastructure in Production at RAL. | ||
2. (A) Central Server ready to receive records from new clients. | 2. (A) Central Server ready to receive records from new clients. | ||
3. (A) All external services ready to start publishing by new method. | |||
4. (A) Workshop at TF |
Revision as of 09:42, 8 August 2011
(Under Construction)
1. Task Meetings
There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs.
2. Main Achievements
Repository
New ActiveMQ STOMP consumer in pre-production for external testing. Involving all the accounting systems who publish directly into the APEL database .
Engaged with IGE and Unicore through the interoperation task to discuss integrating accounting they collect with the central repository.
Bug-fixing
Support of sites having problems publishing
Optimisation of infrastructure
Portal: No new releases of the accounting portal during this quarter. The service ran smoothly. We were working in the following issues:
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Redevelopment of infrastructure taking longer than planned | Employing contractor to backfill other duties |
Large flow of jobs from sites catching up and republishing, sometime in error,overloaded the service, which resulted in lots of sites failing to publish for a few days.. |
Regular optimisation of the consumer database has greatly increased the capacity of the consumer. |
|
4. Plans for the next period
APEL=A, Portal=P
1. (A) New Central Infrastructure in Production at RAL.
2. (A) Central Server ready to receive records from new clients.
3. (A) All external services ready to start publishing by new method.
4. (A) Workshop at TF