Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.3-QR6"

From EGIWiki
Jump to navigation Jump to search
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}


= 1. Task Meetings  =
= 1. Task Meetings  =


{| cellspacing="0" cellpadding="5" border="1" align="center"
{| cellspacing="0" cellpadding="5" border="1" align="center" style="width: 1157px; height: 1255px;"
|-
|-
! style="width: 25%;" | Date (dd/mm/yyyy)  
! style="width: 10%;" | Date (dd/mm/yyyy)  
! style="width: 25%;" | Url Indico Agenda  
! style="width: 25%;" | Url Indico Agenda  
! style="width: 10%;" | Title  
! style="width: 10%;" | Title  
! style="width: 10%;" | Outcome
! style="width: 30%;" | Outcome
|-
|-
| 01/08/2011  
| 01/08/2011  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=555  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=555  
| Grid Operations Meeting  
| Grid Operations Meeting  
|  
| 10 participants. EMI&nbsp;updates and future releases status, UMD&nbsp;releases and SW&nbsp;provisioning status. Several operational issues<br>  
10 participants
 
EMI&nbsp;updates and future releases status<br>
 
UMD&nbsp;releases and SW&nbsp;provisioning status<br>
 
Several operational issues<br>
 
|-
|-
| 22/08/2011  
| 22/08/2011  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=556  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=556  
| Grid Operations Meeting  
| Grid Operations Meeting  
|  
| 18 participantes EMI&nbsp;updates and future releases status, UMD&nbsp;releases and SW&nbsp;provisioning status<br>  
18 participantes
 
EMI&nbsp;updates and future releases status<br>
 
UMD&nbsp;releases and SW&nbsp;provisioning status<br>
 
|-
|-
| 12/09/2011  
| 12/09/2011  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=583  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=583  
| Grid Operations Meeting  
| Grid Operations Meeting  
| <br>
| 21 participantes EMI&nbsp;updates and future releases statu, UMD&nbsp;releases and SW&nbsp;provisioning statu. Operational issues and information
|-
|-
| 20/09/2011  
| 20/09/2011  
Line 52: Line 41:
| https://www.egi.eu/indico/conferenceDisplay.py?confId=612  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=612  
| Grid Operations Meeting  
| Grid Operations Meeting  
| <br>
| 20 participantes EMI&nbsp;updates and future releases status. UMD&nbsp;releases and SW&nbsp;provisioning status. Operational issues and information about interoperability<br>  
|-
|-
| 10/10/2011  
| 10/10/2011  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=650  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=650  
| Grid Operations Meeting  
| Grid Operations Meeting  
| <br>
| &nbsp; 18 participantes EMI&nbsp;updates and future releases status. UMD&nbsp;releases and SW&nbsp;provisioning status<br>  
|-
|-
| 24/10/2011  
| 24/10/2011  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=671  
| https://www.egi.eu/indico/conferenceDisplay.py?confId=671  
| Grid Operations Meeting  
| Grid Operations Meeting  
| <br>
| 12 participantes. EMI&nbsp;updates and future releases status. UMD&nbsp;releases and SW&nbsp;provisioning status. Information about possible collaboration with OSG&nbsp;to test new MW&nbsp;versions.Operational issues
|}
|}


Line 69: Line 58:
Successful release of UMD 1.1, 1.2 and 1.3  
Successful release of UMD 1.1, 1.2 and 1.3  


The number of EAs has increased, several sites from UK&nbsp;have commited for several components.<br>
UMD 1.2 was the first introduction of selected Globus components in a UMD release.


Most of the technical issues found in the SW&nbsp;provisioning process leading to the first UMD&nbsp;1.0 release have been solved, and the process is now much smoother.<br>
The number of EAs has increased, several sites from UK&nbsp;have commited for several components.<br>  


The wiki page:&nbsp;https://wiki.egi.eu/wiki/Staged-rollout-procedures has been updated and now contains the status of SW&nbsp;products both in EMI&nbsp;as well as in EGI&nbsp;SW&nbsp;provisioning. This gives a genral overview to sites and EAs as to the possible contents of upcoming releases.<br>
Most of the technical issues found in the SW&nbsp;provisioning process leading to the first UMD&nbsp;1.0 release have been solved, and the process is now much smoother.<br>  


A&nbsp;list of condidate products for the next release is given in the Grid Operations meetings<br>
The wiki page:&nbsp;[[Staged-rollout-procedures]] has been updated and now contains the status of SW&nbsp;products both in EMI&nbsp;as well as in EGI&nbsp;SW&nbsp;provisioning. This gives a genral overview to sites and EAs as to the possible contents of upcoming releases.<br>  


Milestone MS414 has been finalized and approved: https://documents.egi.eu/secure/ShowDocument?docid=650<br>
A&nbsp;list of condidate products for the next release is given in the Grid Operations meetings<br>
 
Milestone MS414 has been finalized and approved: https://documents.egi.eu/secure/ShowDocument?docid=650<br>


= 3. Issues and Mitigation  =
= 3. Issues and Mitigation  =
Line 89: Line 80:
| <br>
| <br>
|-
|-
| Some products are on hold in the SW&nbsp;provisioning, though there are EA.<br>
| Some products are on hold in the SW&nbsp;provisioning, though there are EA.<br>  
| These products (like FTS, LFC&nbsp;Oracle, VOMS&nbsp;Oracle), will undergo the SW&nbsp;provisioning when the interested sites do the staged rollout. <br>
| These products (like FTS, LFC&nbsp;Oracle, VOMS&nbsp;Oracle), will undergo the SW&nbsp;provisioning when the interested sites do the staged rollout. <br>
|}
|}


= 4. Plans for the next period =
= 4. Plans for the next period =
Discussion undergoing to have a web form for the staged rollout reports, that has the capability of performing updates, and auto generation in pdf.
 
Discussion undergoing to have a joint effort between EGI TSA1.3 EAs and OSG for the testing of new versions, specially products of interest to WLCG.
Discussion undergoing to have a web form for the staged rollout reports, that has the capability of performing updates, and auto generation in pdf. Discussion undergoing to have a joint effort between EGI TSA1.3 EAs and OSG for the testing of new versions, specially products of interest to WLCG.

Latest revision as of 18:51, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
01/08/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=555 Grid Operations Meeting 10 participants. EMI updates and future releases status, UMD releases and SW provisioning status. Several operational issues
22/08/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=556 Grid Operations Meeting 18 participantes EMI updates and future releases status, UMD releases and SW provisioning status
12/09/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=583 Grid Operations Meeting 21 participantes EMI updates and future releases statu, UMD releases and SW provisioning statu. Operational issues and information
20/09/2011 https://www.egi.eu/indico/contributionDisplay.py?contribId=31&confId=452 Unicore Integration Meeting More than 10 participants discussing the current state of Unicore integration and plans for the future.
20/09/2011 https://www.egi.eu/indico/contributionDisplay.py?contribId=30&confId=452 Globus Integration Meeting More than 10 participants discussing the current state of Globus integration and plans for the future.
26/09/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=612 Grid Operations Meeting 20 participantes EMI updates and future releases status. UMD releases and SW provisioning status. Operational issues and information about interoperability
10/10/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=650 Grid Operations Meeting   18 participantes EMI updates and future releases status. UMD releases and SW provisioning status
24/10/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=671 Grid Operations Meeting 12 participantes. EMI updates and future releases status. UMD releases and SW provisioning status. Information about possible collaboration with OSG to test new MW versions.Operational issues

2. Main Achievements

Successful release of UMD 1.1, 1.2 and 1.3

UMD 1.2 was the first introduction of selected Globus components in a UMD release.

The number of EAs has increased, several sites from UK have commited for several components.

Most of the technical issues found in the SW provisioning process leading to the first UMD 1.0 release have been solved, and the process is now much smoother.

The wiki page: Staged-rollout-procedures has been updated and now contains the status of SW products both in EMI as well as in EGI SW provisioning. This gives a genral overview to sites and EAs as to the possible contents of upcoming releases.

A list of condidate products for the next release is given in the Grid Operations meetings

Milestone MS414 has been finalized and approved: https://documents.egi.eu/secure/ShowDocument?docid=650

3. Issues and Mitigation

Issue Description Mitigation Description
Low number of EAs participating in the staged rollout tests
Some products are on hold in the SW provisioning, though there are EA.
These products (like FTS, LFC Oracle, VOMS Oracle), will undergo the SW provisioning when the interested sites do the staged rollout.

4. Plans for the next period

Discussion undergoing to have a web form for the staged rollout reports, that has the capability of performing updates, and auto generation in pdf. Discussion undergoing to have a joint effort between EGI TSA1.3 EAs and OSG for the testing of new versions, specially products of interest to WLCG.