Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.3-QR16"

From EGIWiki
Jump to navigation Jump to search
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
= 1. Task Meetings = <!--
= 1. Task Meetings = <!--
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes.  
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes.  
Line 74: Line 77:
-->
-->


During this quarter there were a total of two releases for UMD-3 components ([http://repository.egi.eu/2014/02/20/release-umd-3-5-0/] 3.5.0) and ([http://repository.egi.eu/2014/04/07/release-umd-3-6-0/] 3.6.0) and one last release for UMD-2 ([http://repository.egi.eu/2014/02/11/release-umd-2-8-0/] 2.8.0). In total 24 products and sub-components were deployed and tested. Also relevant is that even with ending of project on view the number of staged rollout reports was in-line with the last quarters with a Total Number of 36 on which 16 different components were tested spread over 12 sites.  
During this quarter there were a total of two releases for UMD-3 components ([http://repository.egi.eu/2014/02/20/release-umd-3-5-0/] 3.5.0) and ([http://repository.egi.eu/2014/04/07/release-umd-3-6-0/] 3.6.0) and one last release for UMD-2 ([http://repository.egi.eu/2014/02/11/release-umd-2-8-0/] 2.8.0). In total 24 products and sub-components were deployed and tested among then three new products: gridsafe, cream-slurm and finally the new lcg-utils package denominated gfal2. Also of notice is that even with ending of project on view the number of staged rollout reports was in-line with the last quarters with a Total Number of 36 on which 16 different components were tested spread over 12 sites.  
 
Of relevance during this quarter was the issues found during the UMD 3 release process experienced with the latest Globus update (5.2.5), conflicting with the test installation of the products from the Release Candidate (RC). The release has been delayed some weeks in order to find a solution to the problem. The solution to the problem was to test the components individually before the RC so we could find the problematic rpm's. 


Also important to mention the participation in the Middleware Readiness Working Group. The main goal on participating  in this meeting its to Keep the dialog open between EGI and WLCG communities, maybe bridging the processes used in the two communities, i.e. by making available the testing versions for sites which are both WLCG and participate in the EGI Staged Rollout. With experiments' agreement to participated in such tests, we can help to make the UMD production versions available sooner. The meeting accoured during December and the main topics discussed were:
To finalize in the middle of this quarter UMD-2 entered into decommission process and a campaign was prepared. As usual SA 1.3 was engaged and one of the tasks was to ask sites still acting as early adopters for UMD-2 components if they were willing to continue the staged rollout activity now under UMD-3. In total  80 sites were contact, which 3 of then dropped there activities and 20 didn't replied. The full list can be consulted [https://wiki.egi.eu/wiki/Agenda-07-04-2014#UMD_3_Campaign here].


= 3. Issues and Mitigation = <!-- fill the table below
= 3. Issues and Mitigation = <!-- fill the table below
Line 95: Line 96:
= 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) -->  
= 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) -->  


[[Category:SA1_Task_QR_Reports]]


End of project
End of project

Latest revision as of 18:50, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
Date (03/02/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2054 EGI Operations meeting Regular operations meeting
(03/02/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2055 UMD Release Team Regular meeting
(10/02/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2068 EGI Operations meeting Regular operations meeting
(17/02/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2076 UMD Release Team Regular meeting
(10/03/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2106 EGI Operations meeting Regular operations meeting
(17/03/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2078 UMD Release Team Regular meeting
(18/03/2014) https://indico.cern.ch/event/306380/ Middleware Readiness Working Group meeting WLCG meeting
(31/03/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2119 UMD Release Team Regular meeting
(07/04/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2151 EGI Operations meeting Regular operations meeting
(14/04/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2178 UMD Release Team Regular meeting
(28/04/2014) https://indico.egi.eu/indico/conferenceDisplay.py?confId=2192 UMD Release Team Regular meeting

2. Main Achievements

During this quarter there were a total of two releases for UMD-3 components ([1] 3.5.0) and ([2] 3.6.0) and one last release for UMD-2 ([3] 2.8.0). In total 24 products and sub-components were deployed and tested among then three new products: gridsafe, cream-slurm and finally the new lcg-utils package denominated gfal2. Also of notice is that even with ending of project on view the number of staged rollout reports was in-line with the last quarters with a Total Number of 36 on which 16 different components were tested spread over 12 sites.

To finalize in the middle of this quarter UMD-2 entered into decommission process and a campaign was prepared. As usual SA 1.3 was engaged and one of the tasks was to ask sites still acting as early adopters for UMD-2 components if they were willing to continue the staged rollout activity now under UMD-3. In total 80 sites were contact, which 3 of then dropped there activities and 20 didn't replied. The full list can be consulted here.

3. Issues and Mitigation

Issue Description Mitigation Description
OpenSSL "Heartbleed" vulnerability Follow this critical issue with Product teams and see if the updates does not broke the production infrastructure.

4. Plans for the next period

End of project