Difference between revisions of "EGI-InSPIRE:Poland-QR10"
Jump to navigation
Jump to search
(19 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| cellspacing="0" cellpadding="2" border="1" | {| cellspacing="0" cellpadding="2" border="1" | ||
|- | |- | ||
Line 8: | Line 10: | ||
! scope="col" | Author | ! scope="col" | Author | ||
|- | |- | ||
| 10 | | 10<br> | ||
| NGI_PL<br> | | NGI_PL<br> | ||
| CYFRONET<br> | | CYFRONET<br> | ||
| Tadeusz Szymocha<br> | | Tadeusz Szymocha<br> | ||
|} | |} | ||
Line 27: | Line 29: | ||
Note: Complete the tables below by adding as many rows as needed. --> | Note: Complete the tables below by adding as many rows as needed. --> | ||
=== 1.1. CONFERENCES/WORKSHOPS ORGANISED === | === 1.1. CONFERENCES/WORKSHOPS ORGANISED === | ||
{| cellspacing="0" border="1" | {| cellspacing="0" border="1" | ||
|- | |- | ||
! scope="col" | Date | ! scope="col" | Date | ||
! Location | ! Location | ||
! Title | ! Title | ||
! Participants | ! Participants | ||
! Outcome (Short report & Indico URL) | ! Outcome (Short report & Indico URL) | ||
|- | |- | ||
| <br> | | <br> | ||
| <br> | | <br> | ||
| <br> | | <br> | ||
| <br> | | <br> | ||
| <br> | | <br> | ||
|} | |} | ||
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED === | === 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED === | ||
{| cellspacing="0" border="1" | {| cellspacing="0" border="1" | ||
|- | |- | ||
! scope="col" | Date | ! scope="col" | Date | ||
! Location | ! Location | ||
! Title | ! Title | ||
! Participants | ! Participants | ||
! Outcome (Short report & Indico URL) | ! Outcome (Short report & Indico URL) | ||
|- | |- | ||
| 17-21.09.2012<br> | | 27-31.08.2012 | ||
| Prague<br> | | Karlsruhe | ||
| EGI Technical Forum<br> | | GridKa School 2012 | ||
| <br> | | 2 | ||
| http://indico.scc.kit.edu/indico/conferenceDisplay.py?ovw=True&confId=6 | |||
|- | |||
| 17-21.09.2012<br> | |||
| Prague<br> | |||
| EGI Technical Forum<br> | |||
| 10<br> | |||
| http://tf2012.egi.eu/<br> | | http://tf2012.egi.eu/<br> | ||
|- | |||
| 27-28.09.2012 | |||
| Ljublana | |||
| Terena TF-SCIRT Meeting | |||
| 1 | |||
| - | |||
|} | |} | ||
Line 71: | Line 85: | ||
{| cellspacing="0" cellpadding="2" border="1" | {| cellspacing="0" cellpadding="2" border="1" | ||
|- | |- | ||
! scope="col" | Publication title | ! scope="col" | Publication title | ||
! Journal / Proceedings title | ! Journal / Proceedings title | ||
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to'' | ! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to'' | ||
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ||
|} | |} | ||
Line 79: | Line 93: | ||
== 2. ACTIVITY REPORT == <!--''Note: just report activities relevant to this Quarter.''--> | == 2. ACTIVITY REPORT == <!--''Note: just report activities relevant to this Quarter.''--> | ||
=== 2.1. Progress Summary === | === 2.1. Progress Summary === | ||
#Nagios | |||
##Update monitoring system to version SAM17.1 in September | |||
#Unicore | |||
##Preparation of Unicore Nagios probes for update SAM17.1 | |||
##introduction of new functionality for emi.unicore.GlobalStorage probe (testing various access protocols) | |||
#Availability/Reliability metrics | |||
##Availability August/September/October 94%/92%/ 89% | |||
##Reliability August/September/October 94%/93%/ 94% | |||
##Top BDII: all instances above target | |||
#NGI_PL security team | |||
##Regular operational actions within EGI CSIRT IRTF | |||
##Taking part in weekly and monthly meetings of EGI CSIRT | |||
##2 representatives participated in EGI TF | |||
##1 representative participated in Terena TF-CSIRT meeting | |||
##1 site (ICM) participated in Security Site Challenge 6 organized by EGI CSIRT | |||
#NGI_PL ROD team | |||
##The team has been adapted to personnell changes. No service disturbance has been observed in ROD performance. | |||
#Changes on sites | |||
##new services | |||
###WCSS64 | |||
####sBDII (tatooine.wcss.pl). | |||
##Upgrades | |||
###CAMK: | |||
####Upgrade OS on all hosts to Scientific Linux 6.3 | |||
####Upgrade middleware on all hosts to UMD-2 | |||
###TASK | |||
####Upgrade of se.grid.task.gda.pl to SL6 and to UMD2.0 | |||
####Upgrade of ce.grid.task.gda.pl (sBDII) to SL6 and to UMD2.0 | |||
###WCSS64 | |||
####Migration of CREAM to UMD 2.0. | |||
###CYFRONET-LCG2 | |||
####Migration to EMI due to the end of gLite support | |||
###ICM | |||
####SLURM batch system with CREAM service has been deployed which required modification of GIP and plugins. | |||
#task forces | |||
##Federated Cloud Task Force | |||
#trainings | |||
##Due to personnel changes new COD members were trained in their duties internally at Cyfronet. | |||
=== 2.3. Issues and mitigation === | === 2.2. Main Achievements === | ||
All sites runing obsolete software were informed about the necessity to upgrade or decomission obsolete services. This process is well on track. Sites are deploying policy which requires user jobs to be equipped with proper compute grant ID (does not concern gLite software stack). | |||
=== 2.3. Issues and mitigation === | |||
{| cellspacing="0" cellpadding="2" border="1" | {| cellspacing="0" cellpadding="2" border="1" | ||
Line 95: | Line 150: | ||
|- | |- | ||
| Issue Description || Issue mitigation | | Issue Description || Issue mitigation | ||
--> | --> | ||
Latest revision as of 15:12, 9 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
10 |
NGI_PL |
CYFRONET |
Tadeusz Szymocha |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
27-31.08.2012 | Karlsruhe | GridKa School 2012 | 2 | http://indico.scc.kit.edu/indico/conferenceDisplay.py?ovw=True&confId=6 |
17-21.09.2012 |
Prague |
EGI Technical Forum |
10 |
http://tf2012.egi.eu/ |
27-28.09.2012 | Ljublana | Terena TF-SCIRT Meeting | 1 | - |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Nagios
- Update monitoring system to version SAM17.1 in September
- Unicore
- Preparation of Unicore Nagios probes for update SAM17.1
- introduction of new functionality for emi.unicore.GlobalStorage probe (testing various access protocols)
- Availability/Reliability metrics
- Availability August/September/October 94%/92%/ 89%
- Reliability August/September/October 94%/93%/ 94%
- Top BDII: all instances above target
- NGI_PL security team
- Regular operational actions within EGI CSIRT IRTF
- Taking part in weekly and monthly meetings of EGI CSIRT
- 2 representatives participated in EGI TF
- 1 representative participated in Terena TF-CSIRT meeting
- 1 site (ICM) participated in Security Site Challenge 6 organized by EGI CSIRT
- NGI_PL ROD team
- The team has been adapted to personnell changes. No service disturbance has been observed in ROD performance.
- Changes on sites
- new services
- WCSS64
- sBDII (tatooine.wcss.pl).
- WCSS64
- Upgrades
- CAMK:
- Upgrade OS on all hosts to Scientific Linux 6.3
- Upgrade middleware on all hosts to UMD-2
- TASK
- Upgrade of se.grid.task.gda.pl to SL6 and to UMD2.0
- Upgrade of ce.grid.task.gda.pl (sBDII) to SL6 and to UMD2.0
- WCSS64
- Migration of CREAM to UMD 2.0.
- CYFRONET-LCG2
- Migration to EMI due to the end of gLite support
- ICM
- SLURM batch system with CREAM service has been deployed which required modification of GIP and plugins.
- CAMK:
- new services
- task forces
- Federated Cloud Task Force
- trainings
- Due to personnel changes new COD members were trained in their duties internally at Cyfronet.
2.2. Main Achievements
All sites runing obsolete software were informed about the necessity to upgrade or decomission obsolete services. This process is well on track. Sites are deploying policy which requires user jobs to be equipped with proper compute grant ID (does not concern gLite software stack).
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|