Difference between revisions of "EGI-InSPIRE:Jra1 2013-04-02"
Jump to navigation
Jump to search
m (moved Inspire jr1 2013-04-02 to Inspire jra1 2013-04-02) |
|||
Line 20: | Line 20: | ||
==== 3.2.4 Ops Portal ==== | ==== 3.2.4 Ops Portal ==== | ||
* Finalization of the prototype of A/R module for the VO : simplification of the interfaces and bug fixes | |||
* NGI A/R module : aggregation of data from the GOC DB (NGI GROUP SERVICES) | |||
* NGI A/R module : mapping and filtering with SAM PI flavours | |||
* Documentation : Operationals Tools Sustainability | |||
==== 3.2.5 Accounting Portal ==== | ==== 3.2.5 Accounting Portal ==== |
Revision as of 17:21, 2 April 2013
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
2. Critical Issues
3. Major work done during the past week by task
3.1 TJRA1.1
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
3.2.2 GOCDB
3.2.3 GGUS
3.2.4 Ops Portal
- Finalization of the prototype of A/R module for the VO : simplification of the interfaces and bug fixes
- NGI A/R module : aggregation of data from the GOC DB (NGI GROUP SERVICES)
- NGI A/R module : mapping and filtering with SAM PI flavours
- Documentation : Operationals Tools Sustainability