Difference between revisions of "EGI-InSPIRE:Italy-US-QR11"
m (moved Italy-US-QR11 to EGI-InSPIRE:Italy-US-QR11) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
<!-- VERY IMPORTANT | <!-- VERY IMPORTANT | ||
This report covers support activities to existing user communities, and belongs to EGI-InSPIRE SA1 (Task SA1.7 - Support Teams). The outreach to new communities activities that NGIs perform under NA2 are gathered through the Virtual Teams. However, there may be outreach activities that do outside of VTs. You can report about these in your 2.2.3 paragraph as well. | This report covers support activities to existing user communities, and belongs to EGI-InSPIRE SA1 (Task SA1.7 - Support Teams). The outreach to new communities activities that NGIs perform under NA2 are gathered through the Virtual Teams. However, there may be outreach activities that do outside of VTs. You can report about these in your 2.2.3 paragraph as well. | ||
Line 97: | Line 97: | ||
===2.2. Plans=== | ===2.2. Plans=== | ||
During PQ12 we plan to continue the activities started in the previous quarters. Some of them will be presented at the ISGC13 conference in Taipei an to the EGI Community Forum. | |||
Moreover we would like to strengthen our collaboration with the Italian Elixir and EMSO communities since the activities started with them in the previous quarters are currently not progressing as expected. | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== |
Latest revision as of 11:56, 23 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. User Support achievements
During PQ11 NGI_IT user support activities for new communities focused on the following main areas:
- testing in production with real use cases the IGI Portal high level web interface in particular for what concerns the data management section
- the continuation of the activity started in the previous quarters to improve the HPC support within the IGI infrastructure. This activity is done in collaboration with various Italian Grid sites and user communities. The outcome of the activity will be presented at the PDP2013 conference at the end of February (http://www.pdp2013.org/index.html)
- as planned in the previous quarter the support to a new Earth Science user community (the Institute for Atmospheric Science and Climate of the National Research Council - Bologna department) continued. It was focused on the porting to the Grid environment of a self developed climatological model called GLOBO. Two small productions has been carried out, and a bigger one (150000 CPU hours) as started. We are investigating the possibility to create a high level web interface in the IGI portal for this application
- the support to various COMPCHEM communities and applications, in particular:
- to improve the porting of CRYSTAL(http://www.crystal.unito.it/) started in the previous PQs
- the support to run productions of long dynamical parallel simulations of huge molecules needed by the CNR-ISOF institute (Bologna division)
- the submission of the proposal for the creation of a Virtual Team to support the creation of the Computation Chemistry and Material Science VRC. The VT has been accepted and started.
- the support to a a new Life Science user community, the BioComputing group of the Bologna University to create their Grid based computing model to run protein alignment applications. We are verifying the feasibility to run a production which requires about 750000 CPU hours using Italian national VOs and the BIOMED VO.
- the porting to the Grid of an application for the GAIA telescope mission in collaboration with the Italian National Institute for Astrophysics
- the participation to various EGI VTs
- the submission of a proposal for an EGI mini-project about interoperability between HPC and HTC
- a tutorial held in December to disseminate the high level interface created for the ANSYS suite (for INFN communities)
2.2. Plans
During PQ12 we plan to continue the activities started in the previous quarters. Some of them will be presented at the ISGC13 conference in Taipei an to the EGI Community Forum.
Moreover we would like to strengthen our collaboration with the Italian Elixir and EMSO communities since the activities started with them in the previous quarters are currently not progressing as expected.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|