Difference between revisions of "EGI-InSPIRE:Ireland-QR5"
Jump to navigation
Jump to search
m (moved Ireland-QR5 to EGI-InSPIRE:Ireland-QR5) |
|||
(14 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 78: | Line 81: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* NGI_IE became Operational | |||
** Some delays because of problems with the Operational Tools and the proposed UK/I model. | |||
* Progressed Quattor QWG upgrade and related middleware upgrade | * Progressed Quattor QWG upgrade and related middleware upgrade | ||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings | * Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings | ||
* glite-MPI Early Adapter | * UMD glite-MPI Early Adapter | ||
** Included installing EMI EA WMS and LB (some GridSite GACL) problems seen with WMProxy | |||
* Integration of a 32 GPU (16 Node x 2 GPU) cluster | |||
** Hybrid SL6 + gLite 3.2 Tarball installation + Quattor configuration | |||
** Some issues remain with Torque/Maui support for GPUs | |||
* Integration of 16 Sony Playstation nodes | |||
** A initial full 6 months of dedicated usage is expected | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 92: | Line 102: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
| Operations Tools caused some problems for NGI structure || Solved by Monitoring Team | | Operations Tools caused some problems for creation and announcement of NGI structure || Solved by Monitoring Team | ||
|- | |||
| Availabilty/Reliabilty figures missing for April, May, June || Requested recalculation | |||
|- | |||
| Known issue with ARC + MyProxy causing delay on creation/integration of a new site || | |||
|- | |- | ||
| | | Some Grid jobs using all resources on worker nodes (users jobs not checking resource usage, uses all memory and fills disk). Negative effect on all other users jobs || Banned both users and raised GGUS ticket | ||
<!-- | <!-- |
Latest revision as of 18:45, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR5 | NGI_IE | TCD | John Walsh, David O'Callaghan |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2011-05-11–2011-05-13 | Nikhef, Amsterdam, NL | EGI User Virtualization Workshop | 72, 1 from TCD | https://www.egi.eu/indico/conferenceDisplay.py?confId=415 |
2011-06-09–2011-06-10 | CERN, Geneva, CH | Federated Identity System for Scientific Collaborations | 85, 1 from TCD | https://indico.cern.ch/conferenceDisplay.py?ovw=True&confId=129364 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- NGI_IE became Operational
- Some delays because of problems with the Operational Tools and the proposed UK/I model.
- Progressed Quattor QWG upgrade and related middleware upgrade
2.2. Main Achievements
- Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings
- UMD glite-MPI Early Adapter
- Included installing EMI EA WMS and LB (some GridSite GACL) problems seen with WMProxy
- Integration of a 32 GPU (16 Node x 2 GPU) cluster
- Hybrid SL6 + gLite 3.2 Tarball installation + Quattor configuration
- Some issues remain with Torque/Maui support for GPUs
- Integration of 16 Sony Playstation nodes
- A initial full 6 months of dedicated usage is expected
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
Operations Tools caused some problems for creation and announcement of NGI structure | Solved by Monitoring Team |
Availabilty/Reliabilty figures missing for April, May, June | Requested recalculation |
Known issue with ARC + MyProxy causing delay on creation/integration of a new site | |
Some Grid jobs using all resources on worker nodes (users jobs not checking resource usage, uses all memory and fills disk). Negative effect on all other users jobs | Banned both users and raised GGUS ticket
|