Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR15"

From EGIWiki
Jump to navigation Jump to search
 
(16 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}


{{Template:Inspire_reports_menubar}}
{{TOC_right}}
<br>  
<br>  


Line 11: Line 13:
|-
|-
| 15
| 15
|
| NGI_IBERGRID
|  
| LIP & CSIC
|  
| Pablo Orviz
|}
|}


Line 34: Line 36:
! Outcome (Short report &amp; Indico URL)
! Outcome (Short report &amp; Indico URL)
|-
|-
| &lt;Date&gt;
|
| &lt;Location&gt;
|  
| Title
|  
| Participants
|  
| Outcome
|  
|-
|-
| &lt;Date&gt;
| &lt;Location&gt;
| Title
| Participants
| Outcome
|-
| &lt;Date&gt;
| &lt;Location&gt;
| Title
| Participants
| Outcome Test <!-- formatting text -->
|}
|}


=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===
Line 74: Line 64:
| Amsterdam
| Amsterdam
| EGI towards Horizon 2020 Workshop
| EGI towards Horizon 2020 Workshop
| Isabel Campos, Enol Fernandez, Alvaro Simon
| Isabel Campos, Alvaro Simon, Goncalo Borges
| http://indico.egi.eu/indico/confRegistrantsDisplay.py/list?confId=1893
| http://indico.egi.eu/indico/confRegistrantsDisplay.py/list?confId=1893
|-
|-
Line 83: Line 73:
|<Date>||<Location>||Title||Participants||Outcome  
|<Date>||<Location>||Title||Participants||Outcome  
|-
|-
-->  
-->


===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
Line 94: Line 84:
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
|-
|-
| &lt;Publication title&gt;
| Validation of Grid Middleware for the European Grid Infrastructure
| &lt;Journal/Proceedings&gt;
| Journal of Grid Computing
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| Accepted for Publication
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
| Mario David, Goncalo Borges, Jorge Gomes, Joao Pina, Isabel Campos · Enol Fernandez-del-Castillo, Ivan Diaz, Carlos Fernandez, Esteban Freire, Alvaro Simon, Kostas Koumantaros, Michel Dreschner, Tiziana Ferrari, Peter Solagna
|-
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|}
|}


Line 113: Line 94:


===2.1. Progress Summary=== <!-- Provide your test below -->
===2.1. Progress Summary=== <!-- Provide your test below -->
    - Research on automatic failover mechanisms for regional SAM
* Research on automatic failover mechanisms for regional SAM
    - Participation in the task force on availability/reliability computation
* Participation in the task force on availability/reliability computation
    - Finalize SHA-2 compliant infrastructure campaign
* Finalize SHA-2 compliant infrastructure campaign
    - Follow up and support of the Glue-validator compliant infrastructure campaign
* Follow up and support of the Glue-validator compliant infrastructure campaign
    - Follow up with sites the errors on new checks being included together with the SAM-U22:
* Follow up with sites the errors on new checks being included together with the SAM-U22:
        - MPI       
# MPI       
        - Argus
# Argus
        - Pilot jobs
# Pilot jobs
    - Follow up CernmVM-FS Stratum 0 server url migration (for phys.vo.ibergrid.eu VO)
* Follow up CernmVM-FS Stratum 0 server url migration (for phys.vo.ibergrid.eu VO)
    - Review proposal for increasing the A/R threshold to 80%/85%
* Review proposal for increasing the A/R threshold to 80%/85%
    - Follow up and support of site ESA-ESAC decommissioning
* Follow up and support of site ESA-ESAC decommissioning
    - Follow up and support of site BIFI cloud certification
* Follow up and support of site BIFI cloud certification
    - Follow up and support of site IEETA suspension
* Follow up and support of site IEETA suspension
    - Security issues being managed:
* Security issues being managed:
        - EGI-SVG-2014-6627
# EGI-SVG-2014-6627
        - EGI-20140113-01
# EGI-20140113-01


===2.2. Main Achievements=== <!--
===2.2. Main Achievements=== <!--
Provide your text below
Provide your text below
-->  
-->
* Upgrade the Ibergrid Regional Nagios to SAM-U22 + Robot certificate shifting
* 100% availability/reliability for the topbdii.core.ibergrid.eu service
* Sustainable integrated A/R for Ibergrid sites
# November 97/98
# December 94/95


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===
Line 141: Line 127:
! scope="col" | Mitigation Description
! scope="col" | Mitigation Description
|-
|-
| Issue description
| Failover between backup SAM instance and main SAM instance is manual
| Issue mitigation
| We are investigating in some mechanism to trigger the fail-over automatically
|}
|}


Line 149: Line 135:
|-
|-
| Issue Description || Issue mitigation
| Issue Description || Issue mitigation
-->  
-->
 
[[Category:NGI_QR_Reports]]

Latest revision as of 16:13, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
15 NGI_IBERGRID LIP & CSIC Pablo Orviz


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
December 2, 2013 at 09:00 to December 3, 2013 at 16:00 Bergen Aan Zee, Netherlands EGI CSIRT Face to Face meeting Participants https://indico.egi.eu/indico/conferenceDisplay.py?confId=1924
4-6 - December 2013 Amsterdam EGI towards Horizon 2020 Workshop Isabel Campos, Alvaro Simon, Goncalo Borges http://indico.egi.eu/indico/confRegistrantsDisplay.py/list?confId=1893


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
Validation of Grid Middleware for the European Grid Infrastructure Journal of Grid Computing Accepted for Publication Mario David, Goncalo Borges, Jorge Gomes, Joao Pina, Isabel Campos · Enol Fernandez-del-Castillo, Ivan Diaz, Carlos Fernandez, Esteban Freire, Alvaro Simon, Kostas Koumantaros, Michel Dreschner, Tiziana Ferrari, Peter Solagna

2. ACTIVITY REPORT

2.1. Progress Summary

  • Research on automatic failover mechanisms for regional SAM
  • Participation in the task force on availability/reliability computation
  • Finalize SHA-2 compliant infrastructure campaign
  • Follow up and support of the Glue-validator compliant infrastructure campaign
  • Follow up with sites the errors on new checks being included together with the SAM-U22:
  1. MPI
  2. Argus
  3. Pilot jobs
  • Follow up CernmVM-FS Stratum 0 server url migration (for phys.vo.ibergrid.eu VO)
  • Review proposal for increasing the A/R threshold to 80%/85%
  • Follow up and support of site ESA-ESAC decommissioning
  • Follow up and support of site BIFI cloud certification
  • Follow up and support of site IEETA suspension
  • Security issues being managed:
  1. EGI-SVG-2014-6627
  2. EGI-20140113-01

2.2. Main Achievements

  • Upgrade the Ibergrid Regional Nagios to SAM-U22 + Robot certificate shifting
  • 100% availability/reliability for the topbdii.core.ibergrid.eu service
  • Sustainable integrated A/R for Ibergrid sites
  1. November 97/98
  2. December 94/95

2.3. Issues and mitigation

Issue Description Mitigation Description
Failover between backup SAM instance and main SAM instance is manual We are investigating in some mechanism to trigger the fail-over automatically