Difference between revisions of "EGI-InSPIRE:Greece-QR6"
m (moved Greece-QR6 to EGI-InSPIRE:Greece-QR6) |
|||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- |
Latest revision as of 15:42, 7 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
6 | NGI_GRNET | GRNET | K. Koumantaros |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
TSA1.2 A Secure Infrastructure
- Participation on EGI CSIRT IRTF weekly meetings
- Participation on EGI CSIRT monthly meetings
- Acted as EGI_CSIRT Duty Contact 1 time
- Acted as EGI_CSIRT Backup Duty Contact 1 time
- Operation of EGI level Security Nagios box
TSA1.4 Infrastructure for Grid Management
- Operation and maintenance of GRNET NGI Nagios box
- Operation and maintenance of SEE ROC Nagios box
TSA1.7 Support Teams
Regular Local User Support actions and Site maintenance
TSA1.8 Providing A Reliable Grid Infrastructure
- Operation of HellasGrid CA
- Operation of WMS/LB/VOMS/MyProxy/LFC/Hydra/PAKITI services for NGI and Central Services
- Operation of Certification Testbed BDII/WMS combo
2.2. Main Achievements
NGI GRNET has performed a survey for gathering a) user’s requirements regarding their needs from the next versions of middleware and b) user’s satisfaction regarding the operation of the grid infrastructure and the support provided. The main requirements gathered are the following:
- Improvement of the execution time of jobs -Improvement of WMS service, through better matching of jobs with computing elements or an option to exclude some requirements
- Support of previous versions of middleware (for example LCG-CE)
- Real-time inspection of job progress
- Compliance with Grid Standards, like WSRF (Web Services Resource Framework), and OGSA (Open Grid Service Architecture).
- Matlab support
- Provision of a web portal for job execution and data management
In order to address the latest bullet NGI GRNET installed at the following link http://ui01.kallisto.hellasgrid.gr:8080/ the WS-PGRADE portal (www.guse.hu) for HellasGrid users. The portal has been configured in order to support SEE virtual organization and now is at the phase of pilot operation in order to check its correct operation.
NGI_GRNET also started the implementation of a preliminary version of a regional accounting portal supporting customized queries that are needed by our NGI.
There are many things to be done/improved in the future in many areas. e.g improvements on the data retrieval from the glite-APEL nodes, supporting more queries and possible improvements in the presentation area as well.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|