Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Germany-QR15"

From EGIWiki
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}


{{Template:Inspire_reports_menubar}}
{{TOC_right}}
<br>  
<br>  


Line 39: Line 41:
| &lt;Participants&gt;  
| &lt;Participants&gt;  
| &lt;Outcome&gt;
| &lt;Outcome&gt;
|-
| &lt;Date&gt;
| &lt;Location&gt;
| &lt;Title&gt;
| &lt;Participants&gt;
| &lt;Outcome&gt;
|-
| &lt;Date&gt;
| &lt;Location&gt;
| &lt;Title&gt;
| &lt;Participants&gt;
| Test <!-- formatting_test -->
|}
|}


Line 68: Line 58:
| Participants  
| Participants  
| Outcome
| Outcome
|-
| &lt;Date&gt;
| &lt;Location&gt;
| Title
| Participants
| Outcome
|-
| &lt;Date&gt;
| &lt;Location&gt;
| Title
| Participants
| Outcome Test <!-- formatting text -->
|}
|}


Line 96: Line 74:
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''  
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''  
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|}
|}


Line 116: Line 79:


===2.1. Progress Summary=== <!-- Provide your test below -->  
===2.1. Progress Summary=== <!-- Provide your test below -->  
In the reporting period, NGI_DE maintained the smooth running of all Grid services. The regional operation meetings were organized regularly, where problems were discussed and informations as well as experiences were exchanged. ROD shift runs well. Software packages were updated.


===2.2. Main Achievements=== <!--
===2.2. Main Achievements=== <!--
Line 125: Line 89:
* Uni-Freiburg upgraded the node operating system to SL6 and added ATLAS mcore queue in the operation.  
* Uni-Freiburg upgraded the node operating system to SL6 and added ATLAS mcore queue in the operation.  
* FZJ upgraded dCache.
* FZJ upgraded dCache.
* In DESY-HH 30kHS new worker nodes power was commissioned to the cluster (as the replacement and partly as total increase of the power). This site also commisioned the argus ngi server for the NGI_DE(/CH). In addition, complete cvmfs stratum structure was built and put in production (stratum-0 for the ilc vo; stratum-1 for various vo's supported at our site).


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===
Line 141: Line 106:
|-
|-
| Issue Description || Issue mitigation
| Issue Description || Issue mitigation
-->  
-->
 
[[Category:NGI_QR_Reports]]

Latest revision as of 15:38, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR 15 NGI_DE Germany Jie Tao


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
<Date> <Location> <Title> <Participants> <Outcome>

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
<Date> <Location> Title Participants Outcome


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

In the reporting period, NGI_DE maintained the smooth running of all Grid services. The regional operation meetings were organized regularly, where problems were discussed and informations as well as experiences were exchanged. ROD shift runs well. Software packages were updated.

2.2. Main Achievements

The following are concrete achievements of the NGI-DE sites:

  • TU Dresden ZIH performed migration of dCache to new hardware (server and storage)
  • Uni-Freiburg upgraded the node operating system to SL6 and added ATLAS mcore queue in the operation.
  • FZJ upgraded dCache.
  • In DESY-HH 30kHS new worker nodes power was commissioned to the cluster (as the replacement and partly as total increase of the power). This site also commisioned the argus ngi server for the NGI_DE(/CH). In addition, complete cvmfs stratum structure was built and put in production (stratum-0 for the ilc vo; stratum-1 for various vo's supported at our site).

2.3. Issues and mitigation

Issue Description Mitigation Description
Uni-Freiburg: repeated network problems due to overload of Uni-Freiburg main router. Replacement in December solved the issue.