Difference between revisions of "EGI-InSPIRE:Finland-QR4"
Jump to navigation
Jump to search
(23 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
Line 35: | Line 39: | ||
<!-- |+Provided by each SA1 partner. Just report events relevant to SA1 activities.--> | <!-- |+Provided by each SA1 partner. Just report events relevant to SA1 activities.--> | ||
|- | |- | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |||
|11.-14.4||Vilnius||EGI User Forum( organized following two meetings)|| 5 ||see all EGI User Forum reports and material | |||
|- | |||
|11.4.||Vilnius|| Operational Documentation F2F||1 (total of 12 participants)||https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=29&confId=207 | |||
|- | |||
|11.4||Vilnius||ROD teams training session || 2 (total of 30 participants)||https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207 | |||
<!-- | <!-- | ||
(Copy the two rows above to add a new entry in the table) | (Copy the two rows above to add a new entry in the table) | ||
--> | --> | ||
|} | |} | ||
Line 57: | Line 62: | ||
<!-- formatting text --> | <!-- formatting text --> | ||
|- | |- | ||
|- | |||
|11.-14.4||Vilnius||EGI User Forum|| 5 ||see all EGI User Forum reports and material | |||
|- | |||
|11.4||Vilnius||ROD teams training session || 2 ||https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207 | |||
|- | |||
|11.4. || Vilnius||Grid Oversight, ensuring the quality of the Grid infrastructure ||2|| | |||
https://www.egi.eu/indico/contributionDisplay.py?contribId=92&sessionId=9&confId=207 | |||
|- | |||
|14.4||Vilnius||OMB face to face meeting|| 1 ||https://www.egi.eu/indico/conferenceDisplay.py?confId=267 | |||
|} | |} | ||
Line 83: | Line 97: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
<!-- Provide your test below --> | <!-- Provide your test below --> | ||
OC creation progress was delayed by technical complications (renaming the NDGF NGI "CSC" site first, so that we could create our new CSC site under the NGI_FI). However, the establishment of the NGI_FI OC should be finalized during May. | |||
Resources from CSC site will be provisioned using ARC 1.0 which has also coused some delay on service and resource integration to EGI, for example bugs in ARC 1.0 job submission to SLURM batch system did not work. | |||
Personal certificate acquisition process in Finland will change in May. Lot of enabling work has been performed during Q4 to enable move from Nordugrid CA to Terena Certificate service. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
Line 97: | Line 116: | ||
<!-- | <!-- | ||
|- | |- | ||
|<Issue description> || <Issue mitigation> | |<Issue description> || <Issue mitigation>--> | ||
-- | |- | ||
|ARC1 not working with SLURM 2.2.x (x>1) || Patch submitted and accepted to devs | |||
|- | |||
|ARC1 DoS via locking bug in downloader || Problem reported to devs, no patch yet | |||
|- | |||
|ARC1 problems with interoperability with older ARC0.8 releases || Suggestions made to update documentation | |||
|- | |- | ||
|} | |} |
Latest revision as of 17:38, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
4 | NGI_FI | Finland | Pekka Lehtovuori |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
11.-14.4 | Vilnius | EGI User Forum( organized following two meetings) | 5 | see all EGI User Forum reports and material |
11.4. | Vilnius | Operational Documentation F2F | 1 (total of 12 participants) | https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=29&confId=207 |
11.4 | Vilnius | ROD teams training session | 2 (total of 30 participants) | https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207
|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
11.-14.4 | Vilnius | EGI User Forum | 5 | see all EGI User Forum reports and material |
11.4 | Vilnius | ROD teams training session | 2 | https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207 |
11.4. | Vilnius | Grid Oversight, ensuring the quality of the Grid infrastructure | 2 |
https://www.egi.eu/indico/contributionDisplay.py?contribId=92&sessionId=9&confId=207 |
14.4 | Vilnius | OMB face to face meeting | 1 | https://www.egi.eu/indico/conferenceDisplay.py?confId=267 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
OC creation progress was delayed by technical complications (renaming the NDGF NGI "CSC" site first, so that we could create our new CSC site under the NGI_FI). However, the establishment of the NGI_FI OC should be finalized during May.
Resources from CSC site will be provisioned using ARC 1.0 which has also coused some delay on service and resource integration to EGI, for example bugs in ARC 1.0 job submission to SLURM batch system did not work.
Personal certificate acquisition process in Finland will change in May. Lot of enabling work has been performed during Q4 to enable move from Nordugrid CA to Terena Certificate service.
2.2. Main Achievements
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
ARC1 not working with SLURM 2.2.x (x>1) | Patch submitted and accepted to devs |
ARC1 DoS via locking bug in downloader | Problem reported to devs, no patch yet |
ARC1 problems with interoperability with older ARC0.8 releases | Suggestions made to update documentation |