Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Czech Rep-QR4"

From EGIWiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
 


{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
Line 43: Line 47:
|}
|}


===1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED===
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED ===


{| border="1" cellspacing="0" cellpadding="2"
{| cellspacing="0" border="1"
<!-- |+Provided by each SA1 partner. Just report events relevant to SA1 activities.-->
|-
! scope="col" | Date
! Location
! Title
! Participants
! Outcome (Short report &amp; Indico URL) <!-- formatting text -->
|-
| 8.-10.2. 2011
| Mexico City
| Grid of Americas
| 1
| Grid computing for the Pierre Auger Observatory
|-
|-
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)
| 19-25.3. 2011.
<!-- formatting text -->
| Taipei
| ISGC 2011
| 1
| talk on development and utilization of the Pakiti service in EGI, http://event.twgrid.org/isgc2011/slides/SecurityandNetworking/1/presentation-isgc2011-prochazka.pdf
|-
|-
|05-07.04 ||Karlsruhe, Germany ||EGI CSIRT Face-to-Face Meeting || 1||https://egi-csirt.scc.kit.edu/
| 6-7.04  
| Karlsruhe, Germany  
| EGI CSIRT Face-to-Face Meeting  
| 1
| Latest achievements and futures of the team were
discussed. D. Kouril presented and chaired session on security
monitoring.https://egi-csirt.scc.kit.edu/
|-
|-
|11.-15. April 2011||Vilnius||EGI User Forum||3||https://www.egi.eu/indico/conferenceTimeTable.py?confId=207#20110411
| 11.-15. April 2011
| Vilnius
| EGI User Forum
| 3
| https://www.egi.eu/indico/conferenceTimeTable.py?confId=207#20110411
|}
|}
<!--
<!--
Line 79: Line 107:
===2.1. Progress Summary===
===2.1. Progress Summary===


National instances of all services (Nagios, BDII) were regularly maintained, as well as services provided for VOCE and Auger services (WMS, LB, MyProxy, UI, DPM). Regional installation of Dashboard was used in regular monitoring.  
National instances of all services (Nagios, BDII) were regularly maintained, as well as services provided for VOCE and Auger services (WMS, LB, MyProxy, UI, DPM). Reorganization of DPM storage, enlargement of the AUGERPROD space token. Regional installation of Dashboard was used in regular monitoring.  
RT/GGUS interface works smoothly, only minor development was needed. Migration to gLite 3.2 was successfully finished. Regular activities of EGI CSIRT performed, i.e. handling operational security issues. We acted a duty-contact for one week.We carried on with coordination of security monitoring, and mainly focused on preparation of Security dashboard and development of Pakiti.
RT/GGUS interface works smoothly, only minor development was needed. Migration to gLite 3.2 was successfully finished. Regular activities of EGI CSIRT performed, i.e. handling operational security issues. We acted a duty-contact for one week.We carried on with coordination of security monitoring, and mainly focused on preparation of Security dashboard and development of Pakiti.


===2.2. Main Achievements===
===2.2. Main Achievements===
Improved availability/reliability numbers - fixed problems with national BDII and WMS, which lead to bad monitoring results (results for March are back on 99%).
Improved availability/reliability numbers - fixed problems with national BDII and WMS, which lead to bad monitoring results (results for March are back on 99%).
The new disk storage servers with total usable capacity 1 PB were committed
to production on site prague_lcg. 6 servers as dpm pool nodes for VOs ATLAS and auger, 2 as
xrootd servers for the VO ALICE.


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Latest revision as of 15:10, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
4 NGI_CZ CESNET Miroslav Ruda


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
8.-10.2. 2011 Mexico City Grid of Americas 1 Grid computing for the Pierre Auger Observatory
19-25.3. 2011. Taipei ISGC 2011 1 talk on development and utilization of the Pakiti service in EGI, http://event.twgrid.org/isgc2011/slides/SecurityandNetworking/1/presentation-isgc2011-prochazka.pdf
6-7.04 Karlsruhe, Germany EGI CSIRT Face-to-Face Meeting 1 Latest achievements and futures of the team were

discussed. D. Kouril presented and chaired session on security monitoring.https://egi-csirt.scc.kit.edu/

11.-15. April 2011 Vilnius EGI User Forum 3 https://www.egi.eu/indico/conferenceTimeTable.py?confId=207#20110411

1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

National instances of all services (Nagios, BDII) were regularly maintained, as well as services provided for VOCE and Auger services (WMS, LB, MyProxy, UI, DPM). Reorganization of DPM storage, enlargement of the AUGERPROD space token. Regional installation of Dashboard was used in regular monitoring. RT/GGUS interface works smoothly, only minor development was needed. Migration to gLite 3.2 was successfully finished. Regular activities of EGI CSIRT performed, i.e. handling operational security issues. We acted a duty-contact for one week.We carried on with coordination of security monitoring, and mainly focused on preparation of Security dashboard and development of Pakiti.

2.2. Main Achievements

Improved availability/reliability numbers - fixed problems with national BDII and WMS, which lead to bad monitoring results (results for March are back on 99%).

The new disk storage servers with total usable capacity 1 PB were committed to production on site prague_lcg. 6 servers as dpm pool nodes for VOs ATLAS and auger, 2 as xrootd servers for the VO ALICE.

2.3. Issues and mitigation

Issue Description Mitigation Description