Difference between revisions of "EGI-InSPIRE:Amb 2013-11-26"

From EGIWiki
Jump to: navigation, search
(NA2.5)
 
(8 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{TOC_right}}
+
{{EGI-Inspire_menubar}}
[[Category:EGI-InSPIRE]]
+
{{TOC_right}}  
  
 
[[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page
 
[[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page
Line 8: Line 8:
 
== NA1 ==
 
== NA1 ==
 
<!-- Catherine -->
 
<!-- Catherine -->
 +
 +
* Progress on Milestones & Deliverables
 +
Preparations for the QR14 - metrics and draft being collected
 +
 +
* Major work done during the past week by task
 +
 +
TNA1.1 Activity management
 +
* Changes to activity plan to reflect management changes, central budget updates to be finalised
 +
* Extension to be approved by PMB by vote
 +
 +
TNA1.2 Project and consortium management
 +
* Final Form C's for PY3 sent to EC, payment being reviewed
 +
* Feedback being received on 2014 invoices until 28 November
 +
* Effort allocations to be verified for PY5
 +
* Interviews completed for Business Development Expert, Technical Outreach Expert and Senior Ops Officer, appointments approved by EB
 +
 +
TNA1.4 Quality assurance
 +
* Project level metrics to be related to the human networks impact Through White Papers
 +
 +
By RMcL:
 +
* QR14 compilation in progress together with supporting slide set.
 +
** Missing slide set for SA1 and MK not due back for another week (low priority issue)
 +
** Annex A1 (section 7) - tables have very little input so far - all to confirm to RMcL that no further input reqd.
 +
** Table for all remaining milestones and deliverables compiled and dates being added.  Will be sent out to all for proposals for reviewers etc.
 +
* H2020 Workshop - coordiantion ongoing. 112 registrations. Conf dinner no longer feasible.
 +
** NILs teleconference arrangements (27 Nov).
 +
* CF14:
 +
** Site visit completed. Venue will be suitable. Outstanding issue is re conduct of Technology provider/User networking afternoon "stations" but considered feasible.
 +
** PC14 mail list compiled.
 +
** INDICO page behind schedule - by end of week is best chance.
 +
* Webinars programme:
 +
** New emerging requirement from ENVRI for EGI produced voice over presentation by 2 Dec.  Additional emerging requirement for total 3 of these.
 +
* Champions:
 +
** processing of TF13 and other travel claims.
  
 
== NA2 ==  
 
== NA2 ==  
 
<!-- Sergio -->
 
<!-- Sergio -->
 +
== NA2.2 ==
 +
<!-- Neasan -->
 +
# News Items/Articles
 +
#* Published news item on [http://www.egi.eu/news-and-media/newsfeed/news_2013_0054.html Domenico's appearance on the NASA stand at SC13]
 +
# Media mentions
 +
#* LOFAR news [http://www.spaceref.com/news/viewpr.html?pid=41996 picked up by SpaceRef]
 +
#* LOFAR news picked up by [http://zeenews.india.com/news/space/super-telescope-lofar-finds-two-new-pulsars_891209.html Zee News]
 +
#* Mentioned in [http://www.nettg.pl/news/115808/agh-dzien-otwarty-z-superkomputerem press release on CYFRONET open day] (in Polish)
 +
# Events
 +
#* Attended SC13 in Denver
 +
<!-- # Human Networks -->
 +
# Publications
 +
#* Second batch of edits to Scientific Use Cases document done
 +
# Webinars
 +
#* Webinar on [http://youtu.be/9whspm2JNW8 EGI's HTC Data Analysis Solution] edited and uploaded to YouTube
 +
# Other Projects
 +
#* Preparing to record voiceover for ENVRI presentation
 +
<!-- # Deliverables/Milestones -->
 +
# Staffing
 +
#* Outreach Officer and Graphic Designer started 26th of November
 +
<!-- # Other -->
  
 
== NA2.5 ==  
 
== NA2.5 ==  
  
*NILs survey summary (1st question) made public on EGI wiki
+
* Interpret VO, user, job metrics for QR14
 +
* Preparation and attend Resource Centre Forum
 +
* Robot user accounting - submit ticket to JRA1
 +
* Define user-engagement metrics for PY4 & 5
 +
* EISCAT_3D: Capture Proof of Concept architecture on slides, circulate to collaborators
 +
* Data discussion (preparation for H2020 workshop)
 +
* Draft 1st draft of data services position paper for H2020 workshop
 +
* QR14 NA2.5 summary text + summary slides
 +
* Prepare for NIL-Champion teleconference
 +
*Process responses of the NIL Outreach survey. Information about Distributed Competency Centre was made publicly visible at
 
**(REF: https://wiki.egi.eu/wiki/Distributed_Competency_Centre)
 
**(REF: https://wiki.egi.eu/wiki/Distributed_Competency_Centre)
  
 
'''ER-flow'''
 
'''ER-flow'''
*Investigated and added 3 new FP7-HEALTH projects to target by ER-flow  
+
*Investigated 15 FP7 projects from cordis eu website and 3 most related were added as a new FP7-HEALTH projects to target by ER-flow (total amount found that could be related projects is 48)
 
**(REF: http://www.erflow.eu/wiki/-/wiki/Private/Outreach+projects)
 
**(REF: http://www.erflow.eu/wiki/-/wiki/Private/Outreach+projects)
 
*Dissemination events for ER-flow (review on time basis, no new relevant events were found)
 
*Dissemination events for ER-flow (review on time basis, no new relevant events were found)
 +
 +
'''BioVeL'''
 +
* EUBON use case demo by Norman
  
 
== SA1 ==  
 
== SA1 ==  
Line 33: Line 100:
 
== JRA1 ==  
 
== JRA1 ==  
 
<!-- Diego -->
 
<!-- Diego -->
 +
Report: [[Inspire_jra1_2013-11-26]]
  
 
= Participants =
 
= Participants =
 
= Discussion =
 
= Discussion =

Latest revision as of 23:04, 24 December 2014

EGI Inspire Main page



Back to the AMB wiki home page

Activity Reports

NA1

  • Progress on Milestones & Deliverables

Preparations for the QR14 - metrics and draft being collected

  • Major work done during the past week by task

TNA1.1 Activity management

  • Changes to activity plan to reflect management changes, central budget updates to be finalised
  • Extension to be approved by PMB by vote

TNA1.2 Project and consortium management

  • Final Form C's for PY3 sent to EC, payment being reviewed
  • Feedback being received on 2014 invoices until 28 November
  • Effort allocations to be verified for PY5
  • Interviews completed for Business Development Expert, Technical Outreach Expert and Senior Ops Officer, appointments approved by EB

TNA1.4 Quality assurance

  • Project level metrics to be related to the human networks impact Through White Papers

By RMcL:

  • QR14 compilation in progress together with supporting slide set.
    • Missing slide set for SA1 and MK not due back for another week (low priority issue)
    • Annex A1 (section 7) - tables have very little input so far - all to confirm to RMcL that no further input reqd.
    • Table for all remaining milestones and deliverables compiled and dates being added. Will be sent out to all for proposals for reviewers etc.
  • H2020 Workshop - coordiantion ongoing. 112 registrations. Conf dinner no longer feasible.
    • NILs teleconference arrangements (27 Nov).
  • CF14:
    • Site visit completed. Venue will be suitable. Outstanding issue is re conduct of Technology provider/User networking afternoon "stations" but considered feasible.
    • PC14 mail list compiled.
    • INDICO page behind schedule - by end of week is best chance.
  • Webinars programme:
    • New emerging requirement from ENVRI for EGI produced voice over presentation by 2 Dec. Additional emerging requirement for total 3 of these.
  • Champions:
    • processing of TF13 and other travel claims.

NA2

NA2.2

  1. News Items/Articles
  2. Media mentions
  3. Events
    • Attended SC13 in Denver
  4. Publications
    • Second batch of edits to Scientific Use Cases document done
  5. Webinars
  6. Other Projects
    • Preparing to record voiceover for ENVRI presentation
  7. Staffing
    • Outreach Officer and Graphic Designer started 26th of November

NA2.5

  • Interpret VO, user, job metrics for QR14
  • Preparation and attend Resource Centre Forum
  • Robot user accounting - submit ticket to JRA1
  • Define user-engagement metrics for PY4 & 5
  • EISCAT_3D: Capture Proof of Concept architecture on slides, circulate to collaborators
  • Data discussion (preparation for H2020 workshop)
  • Draft 1st draft of data services position paper for H2020 workshop
  • QR14 NA2.5 summary text + summary slides
  • Prepare for NIL-Champion teleconference
  • Process responses of the NIL Outreach survey. Information about Distributed Competency Centre was made publicly visible at

ER-flow

  • Investigated 15 FP7 projects from cordis eu website and 3 most related were added as a new FP7-HEALTH projects to target by ER-flow (total amount found that could be related projects is 48)
  • Dissemination events for ER-flow (review on time basis, no new relevant events were found)

BioVeL

  • EUBON use case demo by Norman

SA1

SA2

SA4

JRA1

Report: Inspire_jra1_2013-11-26

Participants

Discussion