Difference between revisions of "EGI-InSPIRE:Amb 2013-11-05"
Jump to navigation
Jump to search
(→JRA1) |
(→NA2.2) |
||
Line 35: | Line 35: | ||
# Other | # Other | ||
#* Created first draft of white paper on the "Community networks and support” solution | #* Created first draft of white paper on the "Community networks and support” solution | ||
# Champions | |||
#* Investigated and chased various Travel Request issues | |||
#* Proposed funding Champ travel for H2020 workshop | |||
# Webinars | |||
#* Arranged and conducted webinar on High Throughput Data for ENVRI | |||
#* Updating Procedure sheet for webinars. | |||
#* Edit and Upload of recorded webinar to DocDB and Indico. | |||
# Community Forum CF14 | |||
#* Setting up of PC. Contacting no show invited members individually - Doodle poll for 1st meeting on 15 Nov | |||
#* Setting up agenda for site visit | |||
#* preparing and participating in LOC meeting | |||
#* Follow up on C4Me issues | |||
#* Developing/refining/sharing room allocation tables | |||
#* Keynote speakers | |||
# H2020 workshop | |||
#* progressing invitation to participate and various other issues | |||
<!-- # Other Projects --> | <!-- # Other Projects --> | ||
Revision as of 22:27, 5 November 2013
Back to the AMB wiki home page
Activity Reports
NA1
NA2
NA2.2
- News Items/Articles
- News item on EGI presence at ICT2013 published
- News item on Life Science resource pool with OSG published
- Case Studies
- Published new Earth Sciences' case study
- Media mentions
- FedSM article in eIRG October newsletter (page 13)
- CSC Press Release (Finnish version) about CF14
- CSC press release picked up by Presse Box
- CSC press release picked up by HPCWire
- Referenced in item about some work spun out of CESNET
- Events
- Attending ICT2013 in Vilnius
- Human Networks
- Meeting with CG and RMcL about handover of various activities
- Deliverables/Milestones
- Provided input to QR14 and attendant slide
- Staffing
- Outreach Officer and Graphic designers role filled. Successful candidates start later this month
- Other
- Created first draft of white paper on the "Community networks and support” solution
- Champions
- Investigated and chased various Travel Request issues
- Proposed funding Champ travel for H2020 workshop
- Webinars
- Arranged and conducted webinar on High Throughput Data for ENVRI
- Updating Procedure sheet for webinars.
- Edit and Upload of recorded webinar to DocDB and Indico.
- Community Forum CF14
- Setting up of PC. Contacting no show invited members individually - Doodle poll for 1st meeting on 15 Nov
- Setting up agenda for site visit
- preparing and participating in LOC meeting
- Follow up on C4Me issues
- Developing/refining/sharing room allocation tables
- Keynote speakers
- H2020 workshop
- progressing invitation to participate and various other issues
Technical Outreach to New Communities
UCST
EGI-InSPIRE 2.5
- AppDB
- Start assessment of OpenAIRE API to connect AppDB with OpenAIRE (scientific publications)
- Engagement with: gCube framework team, and Bin2Xcor2sac team
- Science Gateway Primer: meeting with Silvia Olabarriaga group; discuss the anatomy of SG's and sync activities.
- Webex bookings, indico setup
- support for Ingemar (setting up JDK/Firefox support was provided)
- Investigation of requirements from George Mikuchadze
- Finding suitable VO (most suitable is DRIHM.EU, can we contact Christian Straube - VO manager ?)
- Requirements:
- 1. Local area weather forecast models such as WRF-ARW/NMM (8-16 CPUs)
- 2. Quantum chemical calculation of macromolecules such as DNA (4 or 8 pair nucleotides) using DFT methods (16-64 CPUs)
- 3. Interaction of plasma with high intensive laser beams using openmp (maximum number of CPUs per WN)
- 4. The needed storage space is approx. 5 GB."
- PPT TNA2.1/TNA1.7 unspent effort calculation
- Survey for NILs summary
- GlobusOnline.eu and EGI SSO
- GGUS user support (Mario Rucio from CERN) for using myproxy.egi.eu
BioVeL
- Autumn newsletter proof reading contribution (BioVeL / OpenBio / EGI collaboration)
- ENM Play Day
- Manage 2nd Play Day (15th Nov. 2013 @ 15 CET)
- Manage 1st Play Day post-mortem topics: ENM WF dependencies; WF tests.
- R @ EGI: disseminate findings;engage BioVeL with UNICORE team
- EUBON use case meeting
ER-flow
- Finding data providers for the 4 ER-flow communities
- Collections of the research repositories by subject:
- - http://www.re3data.org/browse/by-subject/
- - http://databib.org/index_subjects.php
- - http://libguides.lib.uci.edu/content.php?pid=226364&sid=1874263
- - www.datacite.org/repolist
- Collections of the research repositories by subject:
- additional data about VREs
AppDB (dd/mm/yyyy)
CRM (dd/mm/yyyy)
TMP (dd/mm/yyyy)
SA1
SA2
SA4 (collecting in progress)
Summary
TSA4.1 - Management
- Collecting weekly reporting
TSA4.2 - MOOC
TSA4.3 - Liferay
TSA4.4 - OCCI for CMF
rOCCI framework
- extended test coverage to improve QA on rOCCI-core (continuous, right now focusing on Occi::Collection and Occi::Model coverage)
- a bunch of fixes for bugs discovered while implementing the server
rOCCI-server
- working on a reference backend, towards the first alpha version
- added a request parser
- added Occi::Model integration (i.e. the server now correctly responds to GET /-/)
- added support for resource_tpl and os_tpl for the dummy backend
- continuously adding docs and unit tests (specs) for implemented features
ToDo for next week
- continue working on rOCCI-server backends
- in parallel, continue extending test coverage on rOCCI framework, primarily rOCCI-core
Problems
- None (yet :-))
Delays
- Still approx. one month (== Florian's contribution), no further delay
TSA4.5 - CDMI in CMF
Progress:
Plans for the next period:
Problems we encounter, but can solve:
Problems and issues we need external help with:
TSA4.6 - OCCI CompClouds
Progress:
- Upgrading OCCI connector to SlipStream v2. Needed to support Ruby runtime, since using rOCCI
- New connector will be enabled in the next upgrade of SlipStream v2 instance for Helix Nebula
Problems we encounter, but can solve:
None
Problems and issues we need external help with:
None
TSA4.7 - AppDeployment
Progress:
Plans for next week:
TSA4.8 - CloudCapabilities
Progress:
Plans for next week
Problems we encountered, but can solve in the mini-project:
Problems and issues we need external help with:
TSA4.9 - VAPOR
TSA4.10 - CompReports
Progress:
Plans for next sprint
Problems we encountered, but can solve:
Problems and issues we need external help with
TSA4.12 - AllocateFedRes
JRA1
Report: Inspire_jra1_2013-11-05