Difference between revisions of "EGI-InSPIRE:Amb 2013-11-05"
Jump to navigation
Jump to search
(→SA1) |
(→SA2) |
||
Line 112: | Line 112: | ||
== SA2 == | == SA2 == | ||
<!-- Peter --> | <!-- Peter --> | ||
=== SA2.1 === | |||
* URT meeting chaired and agenda preparation | |||
* Discussions with WLCG about common middleware testing (still nothing defined) | |||
* Defined Cloud activities for PY5 | |||
* Follow up with release-related issues | |||
=== SA2.2 === | |||
* Created new repo for configuration templates | |||
* Working on specific QCG tests. | |||
=== SA2.3 === | |||
Verification status: | |||
* WN 3.0.1 UMD3 (SL5/SL6) #6290 # 6289: Verified | |||
* UI 3.0.3 UMD3 (SL5/SL6) #6291 #6292: Verified | |||
* blah 1.20.3 UMD3 (SL5/SL6) #6187 #6188: Verified | |||
* CREAM 1.16.2 UMD3 (SL5/SL6) #6177 #6186: Verified | |||
* canl 2.1.4 UMD3 (SL5/SL6) #6173 #6174: Verified | |||
* SiteBDII UMD2 (SL5/SL6): Verified | |||
RC testing: | |||
* Tested UMD2.7.2/UMD2.7.1 RCs | |||
New QCv6: | |||
* Modified EGI verifiers guideline link to point to QCv6 : https://wiki.egi.eu/wiki/EGI_Verifier_Guideline_QC6 | |||
* Included configuration templates into github egi-qc project: https://github.com/egi-qc/configuration-templates | |||
== SA4 (collecting in progress) == | == SA4 (collecting in progress) == |
Revision as of 19:03, 6 November 2013
Back to the AMB wiki home page
Activity Reports
NA1
- Milestones and Deliverables
- Progressing MS801 for delivery to PMB this week and final despatch next week
- gathering QR14 inputs
- preparing table of outstanding work till current end of InSPIRE.
NA2
NA2.2
- News Items/Articles
- News item on EGI presence at ICT2013 published
- News item on Life Science resource pool with OSG published
- Case Studies
- Published new Earth Sciences' case study
- Media mentions
- FedSM article in eIRG October newsletter (page 13)
- CSC Press Release (Finnish version) about CF14
- CSC press release picked up by Presse Box
- CSC press release picked up by HPCWire
- Referenced in item about some work spun out of CESNET
- Events
- Attending ICT2013 in Vilnius
- Human Networks
- Meeting with CG and RMcL about handover of various activities
- Deliverables/Milestones
- Provided input to QR14 and attendant slide
- Staffing
- Outreach Officer and Graphic designers role filled. Successful candidates start later this month
- Other
- Created first draft of white paper on the "Community networks and support” solution
- Champions
- Investigated and chased various Travel Request issues
- Proposed funding Champ travel for H2020 workshop
- Webinars
- Arranged and conducted webinar on High Throughput Data for ENVRI
- Updating Procedure sheet for webinars.
- Edit and Upload of recorded webinar to DocDB and Indico.
- Community Forum CF14
- Setting up of PC. Contacting no show invited members individually - Doodle poll for 1st meeting on 15 Nov
- Setting up agenda for site visit
- preparing and participating in LOC meeting
- Follow up on C4Me issues
- Developing/refining/sharing room allocation tables
- Keynote speakers
- H2020 workshop
- progressing invitation to participate and various other issues
Technical Outreach to New Communities
UCST
EGI-InSPIRE 2.5
- AppDB
- Start assessment of OpenAIRE API to connect AppDB with OpenAIRE (scientific publications)
- Engagement with: gCube framework team, and Bin2Xcor2sac team
- Science Gateway Primer: meeting with Silvia Olabarriaga group; discuss the anatomy of SG's and sync activities.
- Webex bookings, indico setup
- support for Ingemar (setting up JDK/Firefox support was provided)
- Investigation of requirements from George Mikuchadze
- Finding suitable VO (most suitable is DRIHM.EU, can we contact Christian Straube - VO manager ?)
- Requirements:
- 1. Local area weather forecast models such as WRF-ARW/NMM (8-16 CPUs)
- 2. Quantum chemical calculation of macromolecules such as DNA (4 or 8 pair nucleotides) using DFT methods (16-64 CPUs)
- 3. Interaction of plasma with high intensive laser beams using openmp (maximum number of CPUs per WN)
- 4. The needed storage space is approx. 5 GB."
- PPT TNA2.1/TNA1.7 unspent effort calculation
- Survey for NILs summary
- GlobusOnline.eu and EGI SSO
- GGUS user support (Mario Rucio from CERN) for using myproxy.egi.eu
BioVeL
- Autumn newsletter proof reading contribution (BioVeL / OpenBio / EGI collaboration)
- ENM Play Day
- Manage 2nd Play Day (15th Nov. 2013 @ 15 CET)
- Manage 1st Play Day post-mortem topics: ENM WF dependencies; WF tests.
- R @ EGI: disseminate findings;engage BioVeL with UNICORE team
- EUBON use case meeting
ER-flow
- Finding data providers for the 4 ER-flow communities
- Collections of the research repositories by subject:
- - http://www.re3data.org/browse/by-subject/
- - http://databib.org/index_subjects.php
- - http://libguides.lib.uci.edu/content.php?pid=226364&sid=1874263
- - www.datacite.org/repolist
- Collections of the research repositories by subject:
- additional data about VREs
AppDB (dd/mm/yyyy)
CRM (dd/mm/yyyy)
TMP (dd/mm/yyyy)
SA1
SA2
SA2.1
- URT meeting chaired and agenda preparation
- Discussions with WLCG about common middleware testing (still nothing defined)
- Defined Cloud activities for PY5
- Follow up with release-related issues
SA2.2
- Created new repo for configuration templates
- Working on specific QCG tests.
SA2.3
Verification status:
- WN 3.0.1 UMD3 (SL5/SL6) #6290 # 6289: Verified
- UI 3.0.3 UMD3 (SL5/SL6) #6291 #6292: Verified
- blah 1.20.3 UMD3 (SL5/SL6) #6187 #6188: Verified
- CREAM 1.16.2 UMD3 (SL5/SL6) #6177 #6186: Verified
- canl 2.1.4 UMD3 (SL5/SL6) #6173 #6174: Verified
- SiteBDII UMD2 (SL5/SL6): Verified
RC testing:
- Tested UMD2.7.2/UMD2.7.1 RCs
New QCv6:
- Modified EGI verifiers guideline link to point to QCv6 : https://wiki.egi.eu/wiki/EGI_Verifier_Guideline_QC6
- Included configuration templates into github egi-qc project: https://github.com/egi-qc/configuration-templates
SA4 (collecting in progress)
Summary
TSA4.1 - Management
- Collecting weekly reporting
TSA4.2 - MOOC
TSA4.3 - Liferay
TSA4.4 - OCCI for CMF
rOCCI framework
- extended test coverage to improve QA on rOCCI-core (continuous, right now focusing on Occi::Collection and Occi::Model coverage)
- a bunch of fixes for bugs discovered while implementing the server
rOCCI-server
- working on a reference backend, towards the first alpha version
- added a request parser
- added Occi::Model integration (i.e. the server now correctly responds to GET /-/)
- added support for resource_tpl and os_tpl for the dummy backend
- continuously adding docs and unit tests (specs) for implemented features
ToDo for next week
- continue working on rOCCI-server backends
- in parallel, continue extending test coverage on rOCCI framework, primarily rOCCI-core
Problems
- None (yet :-))
Delays
- Still approx. one month (== Florian's contribution), no further delay
TSA4.5 - CDMI in CMF
Progress:
Plans for the next period:
Problems we encounter, but can solve:
Problems and issues we need external help with:
TSA4.6 - OCCI CompClouds
Progress:
- Upgrading OCCI connector to SlipStream v2. Needed to support Ruby runtime, since using rOCCI
- New connector will be enabled in the next upgrade of SlipStream v2 instance for Helix Nebula
Problems we encounter, but can solve:
None
Problems and issues we need external help with:
None
TSA4.7 - AppDeployment
Progress:
Plans for next week:
TSA4.8 - CloudCapabilities
Progress:
Plans for next week
Problems we encountered, but can solve in the mini-project:
Problems and issues we need external help with:
TSA4.9 - VAPOR
TSA4.10 - CompReports
Progress:
Plans for next sprint
Problems we encountered, but can solve:
Problems and issues we need external help with
TSA4.12 - AllocateFedRes
JRA1
Report: Inspire_jra1_2013-11-05