Difference between revisions of "EGI-InSPIRE:Amb 2013-10-22"
(→NA1) |
|||
(7 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{TOC_right}} | {{EGI-Inspire_menubar}} | ||
{{TOC_right}} | |||
[[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page | [[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page | ||
Line 52: | Line 52: | ||
# Other | # Other | ||
#* [http://www.youtube.com/watch?v=3jvWTSAwNJk 5th], [http://youtu.be/xu1mQwgJu3E 6th] and [http://youtu.be/JmyeWUWBPJQ 7th] Webinars uploaded | #* [http://www.youtube.com/watch?v=3jvWTSAwNJk 5th], [http://youtu.be/xu1mQwgJu3E 6th] and [http://youtu.be/JmyeWUWBPJQ 7th] Webinars uploaded | ||
== NA2.3 == | |||
* Major work done during the past week by task | |||
*: MoU review for Helix Nebula | |||
*: Drafted change management process for scientific disciplines classification and internally reviewed | |||
*: Shared template for solution white paper | |||
*: Contribution to AAI proposal | |||
*: Attended NILs/Champions meeting and provided | |||
*: Drafted service management plan for EGI.eu (part of FitSM implementation) | |||
*: Prepared and internally reviewed presentation for FedSM review (29/30 Oct) | |||
* Major Events Attended | |||
*: None | |||
* Major Events Planned | |||
*: (Sy) FedSM 1st Project Review, 29-30 Oct 2013, Bruxelles | |||
*: (Sergio) e-IRG Workshop, 4-5 Nov 2013, Vilnius | |||
*: (Sergio) ICT2013, 6-8 Nov 2013, Vilnius | |||
*: (Sergio, Sy, Carmela?), EGI workshop, 4-6 Dec 2013, Amsterdam | |||
*: (Carmela?) CoPoRi Workshop, 4 Dec 2013, Brussels | |||
*: (Carmela?) Helix Nebula Suppliers face-to-face meeting, 4 Dec 2013, Brussels | |||
== NA2.5 == | == NA2.5 == | ||
* Review new VT proposal and kick-off VT: Promoting Desktop Grid solutions - https://wiki.egi.eu/wiki/VT_Promoting_Desktop_Grids | * Review new VT proposal and kick-off VT: Promoting Desktop Grid solutions - https://wiki.egi.eu/wiki/VT_Promoting_Desktop_Grids | ||
* Teleconference with NILs & Champions about EGI-InSPIRE PY4-5, H2020, CF2012; Discuss survey to be setup this week for NILs and Champs with Tiziana | * Teleconference with NILs & Champions about EGI-InSPIRE PY4-5, H2020, CF2012; Discuss survey to be setup this week for NILs and Champs with Tiziana | ||
* Propose collaboration opportunitites to PRACE ( | * Propose collaboration opportunitites to PRACE (EGU-2014 hydro-meteorology session; science gateways) - meeting to be arranged with Jules Wolfrat | ||
* Meeting about CF2014 with Richard and Tiziana - event scope, structure, content | * Meeting about CF2014 with Richard and Tiziana - event scope, structure, content | ||
* Discuss human network management with press team and Richard (handover from Richard to Sara) | * Discuss human network management with press team and Richard (handover from Richard to Sara) | ||
Line 65: | Line 87: | ||
* Attend review rehearsal of the BioVeL project (webex session) | * Attend review rehearsal of the BioVeL project (webex session) | ||
* Search for VRE projects (potential EGI customers) on the EC Cordis website - results relevant for ER-flow and EGI-InSPIRE NA2.5 | * Search for VRE projects (potential EGI customers) on the EC Cordis website - results relevant for ER-flow and EGI-InSPIRE NA2.5 | ||
* Article about BioVeL FedCloud usage into Inspired | |||
== SA1 == | == SA1 == | ||
Line 75: | Line 98: | ||
== SA4 == | == SA4 == | ||
< | |||
===== Summary ===== | |||
* MOOC progresses with assembling the course material, but has some issues with temporary grid certificates. | |||
* Liferay is working towards a replacement module for the EGI blog | |||
* rOCCI is extending the test coverage on the framework, and a number of skeleton APIs reflecting the adjusted objectives (as also reported in MS801) | |||
* Contextualisation/AppdDeployment is testing the new OpenStack Horizon release for compatibility. | |||
* The CloudCaps project works on new documentation and publications, and works with WeNMR on updated images. | |||
* The CompReports project is currently validating results for September 2013, self-check mechanisms and custom filters. | |||
===== TSA4.1 - Management ===== | |||
* compiling weekly reports | |||
* finishing adjusting objectives for TSA4.4 (volunteer developers had left) | |||
===== TSA4.2 - MOOC ===== | |||
* recorded & edited two use cases | |||
* reworked slides on grid certificates | |||
* added content to storage on grid | |||
* created WS-PGrade exercises | |||
* created new version of VM | |||
* We're experiencing some issues with temporary grid certificates which don't allow us to save data on dcache. Our sysadmins and the dcache developers are looking into this. | |||
===== TSA4.3 - Liferay ===== | |||
* INFN - work done | |||
* SZTAKI - no report, but agreed to attend a videoconf next week | |||
* CESNET - still working on hooks for EGI blog replacement | |||
=====TSA4.4 - OCCI for CMF===== | |||
rOCCI framework | |||
* extended test coverage to improve QA on rOCCI-core | |||
* a bunch of bug fixes improving OCCI rendering, attribute validation and error handling in rOCCI-core | |||
rOCCI-server | |||
* implemented a skeleton of the internal backend API (Core <-> BackendManager) | |||
* implemented a skeleton of the OCCI-parsing module | |||
* started implementing a reference backend | |||
ToDo for next week | |||
* continue working on rOCCI-server integration with rOCCI-core and back-ends | |||
* in parallel, continue extending test coverage on rOCCI framework, primarily rOCCI-core | |||
Problems | |||
* None (yet :-)) | |||
Delays | |||
* Still approx. one month (== Florian's contribution), no further delay | |||
* Postponed fixes for non-critical rOCCI-* bugs reported during Cloud Plugfest, to minimize the delay | |||
* Implemented changes proposed in MS801, to minimize the delay | |||
=====TSA4.5 - CDMI in CMF===== | |||
Progress: | |||
* due to work on EUDAT project no progress was made | |||
Plans for the next period: | |||
* from next week the effort is back on EGI project, continuing with the prev. weeks plans. | |||
Problems we encounter, but can solve: | |||
* "second half" of the work load has required 100% commitment for the last month, project demo rush. | |||
Problems and issues we need external help with: | |||
* None. | |||
=====TSA4.6 - OCCI CompClouds===== | |||
no report given | |||
=====TSA4.7 - AppDeployment===== | |||
Progress: | |||
* Testing the OCCI extension with the latest OpenStack codebase. | |||
* Creation of base images for new use cases | |||
* Continue with the frontend development. | |||
Plans for next week: | |||
* Development of frontend | |||
* Add applications for new use cases | |||
=====TSA4.8 - CloudCapabilities===== | |||
Progress: | |||
* Discussions with WeNMR community about new images | |||
* Planning publication about our activities | |||
* Documentation changes | |||
Plans for next week | |||
* Contact Martin Wynne regarding BNCweb | |||
* PeachNote firewall clearances | |||
* AutoFS for BioVel images | |||
Problems we encountered, but can solve in the mini-project: | |||
* | |||
Problems and issues we need external help with: | |||
* | |||
=====TSA4.9 - VAPOR===== | |||
bi-weekly reporting | |||
=====TSA4.10 - CompReports===== | |||
Progress | |||
* [Ops] Updated the documentation about the deployment of the infrastructure | |||
* [Ops] Added 1 more hadoop node | |||
* [Ops] Finished the validation of results for September | |||
* [Ops] Added monitoring of raw data via nrpe checks on consumer instance | |||
* [Sync] Investigation of issue with missing data | |||
* [Sync] Implemented of a self-check mechanism for consumer | |||
* [Sync] Resolved issues with the HEPSPEC sync | |||
* [Sync] Testing new version the stomp.py library | |||
* [WebUI] Filter results for custom periods | |||
* [WebUI] Filter results for predefined periods | |||
Plans for next sprint | |||
* [Ops] Installation guide for Lavoisier | |||
* [Ops] Installation guide for Hadoop | |||
* [Ops] Packaging for the WebAPI | |||
* [Ops] Repackage the A/R compute package | |||
* [Ops] Automation of the packaging | |||
* [Sync] Reference implementation of the hepspec sync component | |||
* [Sync] Add license text to all code artifacts (Sync Components) | |||
* [Sync] Update the stomp.py library on the production instance | |||
* [CompEng] Support the use of Availability Profiles in the computations | |||
* [CompEng] Support the use of custom factors in the Availability Profiles | |||
* [WebUI] Web page to compare the results between CERN and us at any time | |||
* [WebUI] Improve the selection of granularity | |||
Problems we encountered, but can solve: | |||
* None | |||
Problems and issues we need external help with | |||
* None | |||
=====TSA4.12 - AllocateFedRes===== | |||
bi-weekly reporting | |||
== JRA1 == | == JRA1 == | ||
Line 83: | Line 236: | ||
= Participants = | = Participants = | ||
* S. Andreozzi | |||
* M. Drescher | |||
* C. Gater | |||
* T. Ferrari | |||
* M. Krakowian | |||
* N. O'Neill | |||
* D. Scardaci | |||
* G. Sipos | |||
* R. McLennan | |||
Absent: none | |||
= Discussion = | = Discussion = | ||
* Qarterly Report: contributions by 8th November to Richard; everybody is OK | |||
* NA2.2: Inspired newsletter: Tiziana said that it should include an article on the EGI strategy; an article that relates the EGI strategy with the EIROForum documents can be published later when updates are available | |||
* NA2.3: developed draft for the service management plan, working on finalising MoU between EGI-InSPIRE and Helix Nebula projects | |||
* NA2.5: Gergely reported that a new VT kicked-off and listed the main expected impact; there is envisioned work on interaction with PRACE on use cases for hyrdro-metereological model | |||
* SA1: monitoring SHA-2 migration, no issues so far; planned ENVRI meeting | |||
* SA4: handover of projects from Tiziana to Diego is smooth; some volunteers participating in mini-projects now left, difficult to understand how to manage; lesson learned: unfunded contribution can disappear and need to understand how to manage, need to be careful about committing activities with volunteers | |||
* JRA1: trying to create an overall picture of what all tools can do by the end of the project, to be published in JRA1 wiki; this will contain all activities planned in PY4, all requirements open; | |||
* Tiziana said that in the new bid, it was added the SLA part and this is an opportunity to start the SLA framework; payment from May on a quarterly basis; Diego heard concerns about the co-funding model, probably this can be resolved at the Council meeting; | |||
* Tiziana suggested to introduce automatic switch for GOCDB due to repetitive unavailability of service at RAL | |||
* Michel asked Diego about process for introducing new probes in SAM (bound to new SAM release) as this of interest from the FedCloud viewpoint; Tiziana suggested for them to take offline and discuss directly | |||
* White paper for EGI solutions: Tiziana proposed to have full documents by 13 December; responsibility for editing are: | |||
** HTC: Peter | |||
** Cloud: Michel | |||
** Networks/Community-driven Innovation: Neasan | |||
** FedOps: Malgorzata (already available with D4.9) | |||
* EGI-InSPIRE Description of Work amendment: Gergely to draft text for NA2.6/User community experts and consultans; Michel commented that Cloud mini-project around cloud capabilities is very (Tiziana to send text of current) | |||
** PY5: | |||
*** NA2.2: question about if we should have TF2014 in Oct, just after the closing of the calls, PMB to decide | |||
*** NA2.3: DRI ERIC: there is no dedicated call, eventually this can happen in call 3 about integration; maybe a Council activity? | |||
*** NA2.4: Human Networks: mainly a support activity for supporting travels | |||
** SA5: | |||
** SA6: | |||
* to understand where to report EGI.eu management of activities; | |||
* All: sending paragraph to Tiziana about text for DoW change; Diego to talk to John |
Latest revision as of 23:05, 24 December 2014
EGI Inspire Main page |
Back to the AMB wiki home page
Activity Reports
NA1
- Progress on Milestones & Deliverables
Preparations for the QR14 - template circulated, metrics being collected
- Major work done during the past week by task
TNA1.1 Activity management
- Changes to activity plan to reflect management changes, central budget updates
- Change in NA2 and SA1 work package leaders proposed
- PO notified of change to Project Director, LEAR being updated
TNA1.2 Project and consortium management
- Payment schedule for PQ11 and PY3 closing costs prepared
- Budget for 2014 revised to be voted on at the Council meeting on 24 October
- Effort allocations to be verified
- Proposals for appointments made to the EB for Graphic Designer and Outreach Intern
- Applications open for Business Development Expert, Technical Outreach Expert and Senior Ops Officer
TNA1.4 Quality assurance
- QR14 materials and metrics being gathered for 8 November
- Project level metrics to be related to the human networks impact
NA2
NA2.2
- Media mentions
- Article in iSGTW on FitSM
- GÉANT article on Nobel Prize for Physics
- Financial Times article on physics and music
- Human Networks
- Met with CG, GS, RMcL and SC to discuss handover
- Deliverables/Milestones
- MS243, reviewed, edited. With the PMB
- Staffing
- Interviewed 2 candidates for Outreach Officer role, one F2F, other via skype
- Interviewed 3 candidates for Graphic Designer role, all F2F
- Other
NA2.3
- Major work done during the past week by task
- MoU review for Helix Nebula
- Drafted change management process for scientific disciplines classification and internally reviewed
- Shared template for solution white paper
- Contribution to AAI proposal
- Attended NILs/Champions meeting and provided
- Drafted service management plan for EGI.eu (part of FitSM implementation)
- Prepared and internally reviewed presentation for FedSM review (29/30 Oct)
- Major Events Attended
- None
- Major Events Planned
- (Sy) FedSM 1st Project Review, 29-30 Oct 2013, Bruxelles
- (Sergio) e-IRG Workshop, 4-5 Nov 2013, Vilnius
- (Sergio) ICT2013, 6-8 Nov 2013, Vilnius
- (Sergio, Sy, Carmela?), EGI workshop, 4-6 Dec 2013, Amsterdam
- (Carmela?) CoPoRi Workshop, 4 Dec 2013, Brussels
- (Carmela?) Helix Nebula Suppliers face-to-face meeting, 4 Dec 2013, Brussels
NA2.5
- Review new VT proposal and kick-off VT: Promoting Desktop Grid solutions - https://wiki.egi.eu/wiki/VT_Promoting_Desktop_Grids
- Teleconference with NILs & Champions about EGI-InSPIRE PY4-5, H2020, CF2012; Discuss survey to be setup this week for NILs and Champs with Tiziana
- Propose collaboration opportunitites to PRACE (EGU-2014 hydro-meteorology session; science gateways) - meeting to be arranged with Jules Wolfrat
- Meeting about CF2014 with Richard and Tiziana - event scope, structure, content
- Discuss human network management with press team and Richard (handover from Richard to Sara)
- Teleconference with EISCAT_3D study case - next step is to define a 2TB data pilot + planning to H2020 proposal
- ER-flow review (1 day for Gergely) - the project received a GOOD mark
- Send out request for QR14 input to TNA2.5 teams
- Record EGI Introduction lecture for Grid Computing MOOC (mini-project in SA4)
- Attend review rehearsal of the BioVeL project (webex session)
- Search for VRE projects (potential EGI customers) on the EC Cordis website - results relevant for ER-flow and EGI-InSPIRE NA2.5
- Article about BioVeL FedCloud usage into Inspired
SA1
Report: Inspire_sa1_2013-10-22
SA2
SA4
Summary
- MOOC progresses with assembling the course material, but has some issues with temporary grid certificates.
- Liferay is working towards a replacement module for the EGI blog
- rOCCI is extending the test coverage on the framework, and a number of skeleton APIs reflecting the adjusted objectives (as also reported in MS801)
- Contextualisation/AppdDeployment is testing the new OpenStack Horizon release for compatibility.
- The CloudCaps project works on new documentation and publications, and works with WeNMR on updated images.
- The CompReports project is currently validating results for September 2013, self-check mechanisms and custom filters.
TSA4.1 - Management
- compiling weekly reports
- finishing adjusting objectives for TSA4.4 (volunteer developers had left)
TSA4.2 - MOOC
- recorded & edited two use cases
- reworked slides on grid certificates
- added content to storage on grid
- created WS-PGrade exercises
- created new version of VM
- We're experiencing some issues with temporary grid certificates which don't allow us to save data on dcache. Our sysadmins and the dcache developers are looking into this.
TSA4.3 - Liferay
- INFN - work done
- SZTAKI - no report, but agreed to attend a videoconf next week
- CESNET - still working on hooks for EGI blog replacement
TSA4.4 - OCCI for CMF
rOCCI framework
- extended test coverage to improve QA on rOCCI-core
- a bunch of bug fixes improving OCCI rendering, attribute validation and error handling in rOCCI-core
rOCCI-server
- implemented a skeleton of the internal backend API (Core <-> BackendManager)
- implemented a skeleton of the OCCI-parsing module
- started implementing a reference backend
ToDo for next week
- continue working on rOCCI-server integration with rOCCI-core and back-ends
- in parallel, continue extending test coverage on rOCCI framework, primarily rOCCI-core
Problems
- None (yet :-))
Delays
- Still approx. one month (== Florian's contribution), no further delay
- Postponed fixes for non-critical rOCCI-* bugs reported during Cloud Plugfest, to minimize the delay
- Implemented changes proposed in MS801, to minimize the delay
TSA4.5 - CDMI in CMF
Progress:
- due to work on EUDAT project no progress was made
Plans for the next period:
- from next week the effort is back on EGI project, continuing with the prev. weeks plans.
Problems we encounter, but can solve:
- "second half" of the work load has required 100% commitment for the last month, project demo rush.
Problems and issues we need external help with:
- None.
TSA4.6 - OCCI CompClouds
no report given
TSA4.7 - AppDeployment
Progress:
- Testing the OCCI extension with the latest OpenStack codebase.
- Creation of base images for new use cases
- Continue with the frontend development.
Plans for next week:
- Development of frontend
- Add applications for new use cases
TSA4.8 - CloudCapabilities
Progress:
- Discussions with WeNMR community about new images
- Planning publication about our activities
- Documentation changes
Plans for next week
- Contact Martin Wynne regarding BNCweb
- PeachNote firewall clearances
- AutoFS for BioVel images
Problems we encountered, but can solve in the mini-project:
Problems and issues we need external help with:
TSA4.9 - VAPOR
bi-weekly reporting
TSA4.10 - CompReports
Progress
- [Ops] Updated the documentation about the deployment of the infrastructure
- [Ops] Added 1 more hadoop node
- [Ops] Finished the validation of results for September
- [Ops] Added monitoring of raw data via nrpe checks on consumer instance
- [Sync] Investigation of issue with missing data
- [Sync] Implemented of a self-check mechanism for consumer
- [Sync] Resolved issues with the HEPSPEC sync
- [Sync] Testing new version the stomp.py library
- [WebUI] Filter results for custom periods
- [WebUI] Filter results for predefined periods
Plans for next sprint
- [Ops] Installation guide for Lavoisier
- [Ops] Installation guide for Hadoop
- [Ops] Packaging for the WebAPI
- [Ops] Repackage the A/R compute package
- [Ops] Automation of the packaging
- [Sync] Reference implementation of the hepspec sync component
- [Sync] Add license text to all code artifacts (Sync Components)
- [Sync] Update the stomp.py library on the production instance
- [CompEng] Support the use of Availability Profiles in the computations
- [CompEng] Support the use of custom factors in the Availability Profiles
- [WebUI] Web page to compare the results between CERN and us at any time
- [WebUI] Improve the selection of granularity
Problems we encountered, but can solve:
- None
Problems and issues we need external help with
- None
TSA4.12 - AllocateFedRes
bi-weekly reporting
JRA1
Report: Inspire_jra1_2013-10-22
Participants
- S. Andreozzi
- M. Drescher
- C. Gater
- T. Ferrari
- M. Krakowian
- N. O'Neill
- D. Scardaci
- G. Sipos
- R. McLennan
Absent: none
Discussion
- Qarterly Report: contributions by 8th November to Richard; everybody is OK
- NA2.2: Inspired newsletter: Tiziana said that it should include an article on the EGI strategy; an article that relates the EGI strategy with the EIROForum documents can be published later when updates are available
- NA2.3: developed draft for the service management plan, working on finalising MoU between EGI-InSPIRE and Helix Nebula projects
- NA2.5: Gergely reported that a new VT kicked-off and listed the main expected impact; there is envisioned work on interaction with PRACE on use cases for hyrdro-metereological model
- SA1: monitoring SHA-2 migration, no issues so far; planned ENVRI meeting
- SA4: handover of projects from Tiziana to Diego is smooth; some volunteers participating in mini-projects now left, difficult to understand how to manage; lesson learned: unfunded contribution can disappear and need to understand how to manage, need to be careful about committing activities with volunteers
- JRA1: trying to create an overall picture of what all tools can do by the end of the project, to be published in JRA1 wiki; this will contain all activities planned in PY4, all requirements open;
- Tiziana said that in the new bid, it was added the SLA part and this is an opportunity to start the SLA framework; payment from May on a quarterly basis; Diego heard concerns about the co-funding model, probably this can be resolved at the Council meeting;
- Tiziana suggested to introduce automatic switch for GOCDB due to repetitive unavailability of service at RAL
- Michel asked Diego about process for introducing new probes in SAM (bound to new SAM release) as this of interest from the FedCloud viewpoint; Tiziana suggested for them to take offline and discuss directly
- White paper for EGI solutions: Tiziana proposed to have full documents by 13 December; responsibility for editing are:
- HTC: Peter
- Cloud: Michel
- Networks/Community-driven Innovation: Neasan
- FedOps: Malgorzata (already available with D4.9)
- EGI-InSPIRE Description of Work amendment: Gergely to draft text for NA2.6/User community experts and consultans; Michel commented that Cloud mini-project around cloud capabilities is very (Tiziana to send text of current)
- PY5:
- NA2.2: question about if we should have TF2014 in Oct, just after the closing of the calls, PMB to decide
- NA2.3: DRI ERIC: there is no dedicated call, eventually this can happen in call 3 about integration; maybe a Council activity?
- NA2.4: Human Networks: mainly a support activity for supporting travels
- SA5:
- SA6:
- PY5:
- to understand where to report EGI.eu management of activities;
- All: sending paragraph to Tiziana about text for DoW change; Diego to talk to John