Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-24-09-2012"

From EGIWiki
Jump to navigation Jump to search
Line 63: Line 63:
* Two sites without CSIRT email contact (notified via GGUS ticket)
* Two sites without CSIRT email contact (notified via GGUS ticket)
* Some sites without CSIRT telephone contact (office telephone)
* Some sites without CSIRT telephone contact (office telephone)
**  
** CSIRT officers may need to contact site security contacts by phone to have a prompt feedback on critical issues regarding the site (during office hours). The office telephone contact has not been enforced as mandatory - so far - but sites are warmly recommended to fill this field in GOCDB.


Missing CSIRT telephone number in GOCDB:
Missing CSIRT telephone number in GOCDB:
AsiaPacific T2-TH-CUNSTDA
* AsiaPacific T2-TH-CUNSTDA, NZ-UOA, HK-HKU-CC-01
AsiaPacific NZ-UOA
* NGI_BG BG06-GPHI
AsiaPacific HK-HKU-CC-01
* NGI_CH UNIGE-DPNC
NGI_BG BG06-GPHI
* NGI_DE wuppertalprod
NGI_CH UNIGE-DPNC
* NGI_FRANCE AUVERGRID, IN2P3-LPSC, IN2P3-IPNL
NGI_DE wuppertalprod
* NGI_IBERGRID CIEMAT-TIC, CIEMAT-LCG2, IFCA-LCG2
NGI_FRANCE AUVERGRID
* NGI_IL NGI_IL, IL_IUCC_IG, NGI_IL_MED1
NGI_FRANCE IN2P3-LPSC
* NGI_IT INFN-ROMA2, GARR-01-DIR, MK-03-FINKI
NGI_FRANCE IN2P3-IPNL
* NGI_UK UKI-LT2-UCL-HEP
NGI_IBERGRID CIEMAT-TIC
* ROC_IGALC GRID-CEDIA
NGI_IBERGRID CIEMAT-LCG2
NGI_IBERGRID IFCA-LCG2
NGI_IL NGI_IL
NGI_IL IL_IUCC_IG
NGI_IL NGI_IL_MED1
NGI_IT INFN-ROMA2
NGI_IT GARR-01-DIR
NGI_MARGI MK-03-FINKI
NGI_UK UKI-LT2-UCL-HEP
ROC_IGALC GRID-CEDIA


===3. AOB ===
===3. AOB ===

Revision as of 12:22, 24 September 2012

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1. Update on the status of EMI updates

1.2. Staged Rollout

The IGTF trusted CA's have passed the verification process and are to be staged rollout today.

For UMD1 update, we have the following in staged rollout

  • IGE SAGA 1.6.1: EA has accepted the test.
  • IGE GridSafe: waiting integration into APEL accounting.
  • IGE GridSAM: No EA, continues on hold in staged rollout.

For UMD2 update now planed to be released on the 8 of October:

  • In UMDStore area (SW provisioning complete):
    • CREAM SGE 2.0.0 module
    • LB 3.2.6: though a new update (3.2.7) is in the verification process, that may deprecate the 3.2.6
  • In staged rollout:
    • MPI 1.3.0: staged undergoing by EA team
    • UNICORE UVOS 1.5.1
    • BDII core 1.4.0: it was also released for emi1, if this passes the staged rollout the emi1 component will also be released in the next UMD1 update
    • IGE components:
      • Globus Default security 5.2.1
      • Globus MyPROXY 5.6.3
      • Security integration 2.2.0
      • Gridway 5.10.2
  • The following products are still to be verified, but aimed at the next update:
    • LB 3.2.7: notification sent to the verifiers to start it asap
    • MyPROXY 1.0.1: verification finished, and staged rollout will follow today or tomorrow.
    • All others will be prioritized in SA2, most corresponded to the lower priority products communicated by the SA1.

2. Operational Issues

2.1 Decommissioning of unsupported middleware

  • All gLite 3.1 components must be upgraded to an UMD release or decommissioned by the end of September. Sites still deploying gLite 3.1 components are eligible for suspension from the first of October.
  • All gLite 3.2 unsupported components must be upgraded to an UMD release or decommissioned but the end of September. EGI management will receive a report containing the sites with unsupported middleware components still deployed, further actions will be defined, including possible suspension at the end of October.
  • EGI COD and EGI CSIRT will follow up with sites starting from October the first.
2.1.2 Currently supported components

The following components are not part of the decommissioning campaign, as they are still under security support, until November 30 2012:

  • DPM
  • LFC
  • gLite-WN
  • gLite-UI
  • gLExec

2.2 Security contact

Most of the sites in the EGI infrastructure have the security contacts correctly filled in the GOCDB.

  • Two sites without CSIRT email contact (notified via GGUS ticket)
  • Some sites without CSIRT telephone contact (office telephone)
    • CSIRT officers may need to contact site security contacts by phone to have a prompt feedback on critical issues regarding the site (during office hours). The office telephone contact has not been enforced as mandatory - so far - but sites are warmly recommended to fill this field in GOCDB.

Missing CSIRT telephone number in GOCDB:

  • AsiaPacific T2-TH-CUNSTDA, NZ-UOA, HK-HKU-CC-01
  • NGI_BG BG06-GPHI
  • NGI_CH UNIGE-DPNC
  • NGI_DE wuppertalprod
  • NGI_FRANCE AUVERGRID, IN2P3-LPSC, IN2P3-IPNL
  • NGI_IBERGRID CIEMAT-TIC, CIEMAT-LCG2, IFCA-LCG2
  • NGI_IL NGI_IL, IL_IUCC_IG, NGI_IL_MED1
  • NGI_IT INFN-ROMA2, GARR-01-DIR, MK-03-FINKI
  • NGI_UK UKI-LT2-UCL-HEP
  • ROC_IGALC GRID-CEDIA

3. AOB

3.1 Next meeting