Difference between revisions of "Agenda-24-09-2012"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
==== 1.2. Staged Rollout ==== | ==== 1.2. Staged Rollout ==== | ||
The IGTF trusted CA's have passed the verification process and are to be staged rollout today. | The IGTF trusted CA's have passed the verification process and are to be staged rollout today. | ||
For UMD1 update, we have the following in staged rollout | For UMD1 update, we have the following in staged rollout | ||
*IGE SAGA 1.6.1: EA has accepted the test. | |||
*IGE GridSafe: waiting integration into APEL accounting. | *IGE SAGA 1.6.1: EA has accepted the test. | ||
*IGE GridSafe: waiting integration into APEL accounting. | |||
*IGE GridSAM: No EA, continues on hold in staged rollout. | *IGE GridSAM: No EA, continues on hold in staged rollout. | ||
For UMD2 update now planed to be released on the 8 of October: | For UMD2 update now planed to be released on the 8 of October: | ||
*In UMDStore area (SW provisioning complete): | |||
**CREAM SGE module | |||
===2. Operational Issues === | ===2. Operational Issues === |
Revision as of 11:26, 24 September 2012
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1. Update on the status of EMI updates
1.2. Staged Rollout
The IGTF trusted CA's have passed the verification process and are to be staged rollout today.
For UMD1 update, we have the following in staged rollout
- IGE SAGA 1.6.1: EA has accepted the test.
- IGE GridSafe: waiting integration into APEL accounting.
- IGE GridSAM: No EA, continues on hold in staged rollout.
For UMD2 update now planed to be released on the 8 of October:
- In UMDStore area (SW provisioning complete):
- CREAM SGE module