Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-19-11-2013

From EGIWiki
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

1.2 Staged rollout updates

  • Ready to be released
    • unicore-hila v. 2.4.0
    • cream-torque v. 2.1.1
    • px v. 1.3.34
    • arc-ce v. 3.0.3
    • gridway v. 5.14.1
    • dpm v. 1.8.7-3
    • bdii-core v. 1.5.4
    • bdii-top v. 1.1.3
    • canl v. 2.1.4
    • cream-ce v. 1.16.2
    • blah v. 1.20.3

2 Operational issues

2.1 Updates from DMSU

Nothing to report

2.2 Issues with the gLExec probe on tarball WNs

The new gLExec probe provided by EMI is Perl-based and it requires Perl library Time::HiRes. In case the library is missing on WN, test emi.cream.glexec.WN-gLExec will report:

CRITICAL: (null)

WNs with the metapackage emi-glexec_wn contain the required library and work fine. WNs deployed by using tarball WNs are missing the library and glexec binary.

2.3 Proposed changes in the APEL monitoring probes

3. AOB

3.2 Next meeting

4. Minutes