Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-19-11-2013"

From EGIWiki
Jump to navigation Jump to search
Line 21: Line 21:
==== 2.1 Updates from DMSU ====
==== 2.1 Updates from DMSU ====
Nothing to report
Nothing to report
==== 2.2 Proposed changes in the APEL monitoring probes ====
==== 2.2 Issues with the gLExec probe on tarball WNs ====
==== 2.3 Proposed changes in the APEL monitoring probes ====


=== 3. AOB  ===
=== 3. AOB  ===

Revision as of 12:47, 19 November 2013

Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

1.2 Staged rollout updates

2 Operational issues

2.1 Updates from DMSU

Nothing to report

2.2 Issues with the gLExec probe on tarball WNs

2.3 Proposed changes in the APEL monitoring probes

3. AOB

3.2 Next meeting

4. Minutes