Detailed agenda Grid Operations Meeting 14 February 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
- Upcoming soon (possibly this week):
In Certification FTS/A/M 2.2.5
- In staged rollout:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- Ready for release - staged rollout OK:
lcg-CE 3.1.46 glite-CLUSTER 3.1.4
We will have to evaluate if the LFC and DPM be released into production anyway, since it's the last release of those components in glite 3.1, and the current production release "suffers" from the same problem of memory leak.
- glite 3.2:
- Upcoming soon (possibly this week):
Ready for Certification LB 2.1.20 Ready for Certification UI 3.2.9 In Certification WN 3.2.10 In Certification FTS/A/M 2.2.5
- In staged rollout:
glite-CLUSTER 3.2.2 (No Early Adopter)
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline was 10 February
- The staged rollout wiki Staged-Rollout has been updated, and Staged-rollout-procedures contains information about the procedures/steps that EAs have to follow.
- New: management interface of Early Adopters and components: https://www.egi.eu/earlyAdopters/ being updated (the wiki table of EAs and components will be deprecated in the near future).
2 - Operational issues (all)
- Batch system support/integration into the MW and in EMI in particular, all on Best Effort:
- Torque: Nikhef
- SGE: Cesga, LIP, (Imperial ?) - waiting for more information from EMI (Cream in particular) specially for the GLUE2
- Condor: PIC?
- LSF: CERN?, Padova?
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Next meeting: Monday 28 February 2011, 14h00 Amsterdam time