Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-10-06-2013

From EGIWiki
Revision as of 11:16, 10 June 2013 by Enolfc (talk | contribs)
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


1. Middleware releases and staged rollout

1.1 Staged Rollout

Status of the products verification/staged rollout

UMD-3.1 preparation

For UMD-3 a comprehensive view can be found in this RT dashboard. Please note that the page could take time to load.

cream

  • cream-slurm: currently being verified by Ibergrid members @ PIC. So far job submission tests have succeeded with minor issues, accounting now being tested.
  • cream-ge: new EMI-3 release from 03/06 fixes some issues found in the verification of the previous release. Will begin complete verification soon.

StoRM

StoRM 1.11.1 was verified without any issues. Currently in staged-rollout. Some sites already have this version on production without issues.

Other products

Products in verification:

  • bdii-core
  • argus
  • emi-UI
  • glite-Cluster
  • gridftp and globus-default-security
  • gsisshterm (gsisshterm is not SHA2 compliant)

Products in SR:

  • unicore-*
  • cream-lsf
  • DPM
  • glite-MPI

Products ready to be released:

  • Security update of EMI wms (3.5.1)
  • px 1.3.32
  • lb 4.0.92

UMD-2

UMD-2.5.0 release

UMD-2.5.0 was released with 10 products. See UMD 2.5.0 wiki for details.

  • GSI-SSHTerm 1.3.4 (this product does not have SHA-2 support!)
  • Globus GridFTP 5.2.3
  • Globus GRAM5 5.2.3
  • CREAM Torque module 2.0.2
  • TORQUE server config 1.0.1
  • BLAH 1.18.3
  • LB 3.2.10
  • globus-32-bit 5.2.4
  • WMS 3.4.1
  • globus 5.2.4


UMD-2.6.0 preparation

For UMD-2 a comprehensive view can be found in this RT dashboard. Please note that the page could take time to load. The most relevant product in the coming UMD-2 update is the emi-wn:

emi-wn
  • emi-wn will be available for SL6 (fix GGUS #94628 and GGUS #94343)
  • Tested in verification during previous week with latest glexec and gfal/lcg-utils versions
  • Currently in SR, deployed in production during the weekend.


2 Operational issues

2.1 Updates from DMSU

No particular issue to report

3. AOB

3.2 Next meeting

Proposed date for the next meeting is June 24th 2013, 14:00 CEST

4. Minutes