Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-06-05-2013"

From EGIWiki
Jump to navigation Jump to search
Line 13: Line 13:
==== 1.1 Staged Rollout  ====
==== 1.1 Staged Rollout  ====


== Status of the products verification/staged rollout ==
For UMD-3 a comprehensive view can be found in [https://rt.egi.eu/rt/Dashboards/4248/Software%20Provisioning%20UMD-3 this RT dashboard]. Please note that the page could take time to load.
=== UMD-3: Products in staged rollout ===
=== UMD-3: Products ready for the next UMD release ===
=== UMD-2: General status of new updates ===
* LB will be released asap to solve a problem with an log4c update released in EPEL.
* The next release cycle of UMD-2 will start after the UMD-3 first release on May 14th.


=== 2. Operational Issues  ===
=== 2. Operational Issues  ===

Revision as of 11:46, 6 May 2013

Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


1. Middleware releases and staged rollout

1.1 Staged Rollout

Status of the products verification/staged rollout

For UMD-3 a comprehensive view can be found in this RT dashboard. Please note that the page could take time to load.


UMD-3: Products in staged rollout

UMD-3: Products ready for the next UMD release

UMD-2: General status of new updates

  • LB will be released asap to solve a problem with an log4c update released in EPEL.
  • The next release cycle of UMD-2 will start after the UMD-3 first release on May 14th.

2. Operational Issues

2.2 Updates from DMSU

no particular issue to report


3. AOB

3.2 Next meeting

Proposed date for the next meeting is May 27th 2013, 14:00 CEST

4. Minutes