NGI DE CH Operations Center:Operations Meeting:30092011
Jump to navigation
Jump to search
Introduction
- Minutes of last meeting
- Access to this wiki page:
https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center_Talk:NGI_DE_CH_Operations_Center
Announcements
- Meetings/conferences
- Availability/reliability statistics
https://documents.egi.eu/public/ShowDocument?docid=783 NGI-DE: 96%/96% UNI-SIEGEN-HEP 71 %/71 % NGI_CH: 96 %/98 %
- Monitoring
ARC deploing started
- Staged rollout/updates
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
- KIT (GridKa, FZK-LCG2)
nothing special to report
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- delivered 256TB additional space - fixed Information System issue dued by SRM configuration - fixed Information System issue dued by Site BDII hanging issues (openldap 2.4) - fixed on CREAM: - apel parser was not publishing to apel service for a long time, increase of memory to the apel parser - blah logger issue on parsing accounting info, adding <ExtraFile> rule on the config to support our SGE accounting path - blah logger releasing too long queued jobs, increased purge interval - root partition got full, a tunign of purge policy - fixed APEL: publisher issue 'causing every night to re-publish all stored data even if configured on "missing" - plan to upgrade CreamCe to the latest release (better integration to GGE)
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
37 12.09 18.09 Team4, JUELICH 38 19.09 25.09 Team5, BADW-LRZ 39 26.09 02.10 Team6, CSCS/NGI_CH 40 03.10 09.10 Team1. DESY 41 10.10 16.10 Team6, CSCS/NGI_CH switched wk 27/29 42 17.10 23.10 Team3, KIT
- Other
Florian leaving end of September. operations for BADW-LRZ?
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.