Difference between revisions of "EGI-InSPIRE:SA1.3-QR3"
Line 57: | Line 57: | ||
Note. This is a detailed account of progress over the previous quarter of activities within the task. | Note. This is a detailed account of progress over the previous quarter of activities within the task. | ||
--> | --> | ||
During the reporting period the so called “New SW Release Workflow” (NSRW) has been implemented in the RT queue “sw-rel”, and the notification tests have been performed. | |||
Early Adopter teams: For gLite 3.2 series most of the components are covered with at 1 or more teams, the sole exception presently are the MyProxy, dCache and VOMS_Oracle. Recent addition of EA to test LFC_Oracle from a WLCG T1. In a collective response from ARC sites, several EA teams have volunteered for ARC components. (Mitigation of issue 3 of QR2) | |||
The report template is now used for all staged rollout tests, and uploaded into the document server: | |||
Search “staged rollout” in https://documents.egi.eu/secure/SearchForm , an example: https://documents.egi.eu/secure/ShowDocument?docid=320 | |||
The total number of Early Adopter teams is now 40, it includes one more team from a WLCG T1, and a Canadian team, besides all newcomers for ARC. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 21:16, 31 January 2011
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
08 Nov 2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=208 | Grid Operations Meeting | 32 attendants. New dteam voms server. Staged rollout info. SW release workflow. Problematic ggus tickets |
22 Nov 2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=220 | Grid Operations Meeting | 26 attendants. Staged rollout info. ARC plan for staged rollout. Problematic ggus tickets. ARC probes in Nagios. New CA probes. Ops tools info. |
06 Dec 2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=230 | Grid Operations Meeting | 30 attendants. Staged rollout info. All components should go into staged rollout in order to be released. Ops tools info. COD issues. |
07 Dec 2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=229 | dedicated meeting on "new GOCDB Features needed to integrate all new service-types" | 12 attendants (see minutes). Re-definition and feasibility study of UNICORE specific requirements that were lost in the transition between the main GOCDB developers. Afterwards the requirements were correctly put through OTAG. |
20 Dec 2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=243 | Grid Operations Meeting | 21 attendants. Staged rollout info. NGI EA statistics of staged rollout. New dteam voms server. Ops tools info. |
17 Jan 2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=274 | Grid Operations Meeting | 26 attendants. Staged rollout info. Operational issues to be collected on wiki. Ops tools info. COD issues. |
20 Jan 2011 | no url | Dedicated SA1 interoperability roadmap meeting 14:30 -15:30 | Attendants: Michaela Lechner, Mario David, Emir Imamagic, John Gordon, Overview of interoperability status for Monitoring and Accounting and analysis of realistic future developments and possible showstopers. |
31 Jan 2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=304 | Grid Operations Meeting | 24 attendants. Staged rollout info. Information about EMI 1.0 release. Operational issues now collected on wiki. Ops tools info. COD issues. |
2. Main Achievements
During the reporting period the so called “New SW Release Workflow” (NSRW) has been implemented in the RT queue “sw-rel”, and the notification tests have been performed.
Early Adopter teams: For gLite 3.2 series most of the components are covered with at 1 or more teams, the sole exception presently are the MyProxy, dCache and VOMS_Oracle. Recent addition of EA to test LFC_Oracle from a WLCG T1. In a collective response from ARC sites, several EA teams have volunteered for ARC components. (Mitigation of issue 3 of QR2)
The report template is now used for all staged rollout tests, and uploaded into the document server: Search “staged rollout” in https://documents.egi.eu/secure/SearchForm , an example: https://documents.egi.eu/secure/ShowDocument?docid=320
The total number of Early Adopter teams is now 40, it includes one more team from a WLCG T1, and a Canadian team, besides all newcomers for ARC.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Issue description | Issue mitigation |