Difference between revisions of "EGI-InSPIRE:SA1.8-QR4"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [https://rt.egi.eu/rt/Ticket/Display.html?id=1526]. | An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [https://rt.egi.eu/rt/Ticket/Display.html?id=1526]. | ||
Impact of increasing the suspension threshold from 50% Availability for 3 consecutive months to 70% has been evaluated and presented in the OMB at the User forum in Vilnius [https://www.egi.eu/indico/materialDisplay.py?contribId=9&materialId=slides&confId=267]. The impact has been found to be minimal. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 10:05, 27 April 2011
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|
2. Main Achievements
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[1] was crated to JRA1.
An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [2].
Impact of increasing the suspension threshold from 50% Availability for 3 consecutive months to 70% has been evaluated and presented in the OMB at the User forum in Vilnius [3]. The impact has been found to be minimal.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|
4. Plans for the next period
Continue work on the EGI-NGI and Core Services OLA.
Start enforcing of increased Availability/Reliability thresholds from May 2011 (PY2) onwards.
5. Number of sites suspended
Month | Suspended sites |
---|---|
January 2011 | 2 |
February 2011 | 0 |
March 2011 | 0 |