Difference between revisions of "EGI-InSPIRE:SA1.6-QR14"
Jump to navigation
Jump to search
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
= 1. Task Meetings = <!-- | = 1. Task Meetings = <!-- | ||
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | ||
Line 37: | Line 40: | ||
Note. This is a detailed account of progress over the previous quarter of activities within the task. | Note. This is a detailed account of progress over the previous quarter of activities within the task. | ||
PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT) | PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT) | ||
--> | --> | ||
== GGUS structure == | |||
=== Support units === | |||
Decommissioned support units<br> | |||
* "Condor Utils" | |||
* "ETICS" | |||
* "Torque Utils" | |||
New support units<br> | |||
* "UMD Product Submission" | |||
* "IDGF" | |||
* "CVMFS" | |||
== GGUS web portal == | |||
* New "Did you knows?" about the following topics: | |||
- Duplicate ticket. | |||
* Display the quality of service of the support units on an info page at the portal | |||
* Removed Type of Problem "Batch" | |||
* Added the attribute "Ticket priority" to the XML output of the search results | |||
== GGUS system == | |||
* Adapted the synchronization with GOCDB according to the changed PI | |||
== Interfaces with other ticketing systems == | |||
* Further improvements to the GGUS-SNOW interface | |||
== Alarm tests after GGUS releases == | |||
* Executed the alarm and interface tests after each GGUS release. | |||
= 3. Issues and Mitigation = <!-- fill the table below | = 3. Issues and Mitigation = <!-- fill the table below | ||
Line 47: | Line 78: | ||
! scope="col" | Mitigation Description | ! scope="col" | Mitigation Description | ||
|- | |- | ||
| | |Collaboration of GGUS and PRACE | ||
| | |This action is postponed as it has only low priority for PRACE at the moment. | ||
|- | |||
|Collaboration of GGUS and MAPPER | |||
|The xGUS instance is ready for going life. Waiting for the go from the MAPPER people. | |||
|- | |- | ||
| | |Collaboration of GGUS and DANTE | ||
| | |No collaboration of GGUS and DANTE for now | ||
|} | |} | ||
= 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) --> | = 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) --> | ||
* Integration of Operations Portal in GGUS. This action is postponed as requested by Operations Portal admins.<br> | |||
* Fully integrate the CMS VO in GGUS and retire the interface to Savannah. | |||
* Migrate GGUS shopping list from Savannah to JIRA. | |||
* Implement alarm process through GGUS in case of failures of operational tools. | |||
* Implement work flow for tickets needing information about UMD releases when issue was solved by PTs. | |||
* Integration of support unit for EDUPERT | |||
== GGUS system == | |||
* Migrate GGUS to the xGUS framework | |||
* Shibboleth authentication | |||
* Finalize fail safe architecture | |||
== GGUS web portal == | |||
* Implement a bulk submit feature. | |||
== Interfaces with other systems == | |||
* Implement interface to XSEDE RT system | |||
* Implement interface to PRACE RT system. |
Latest revision as of 19:07, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | "shopping list" meeting | traceable at: https://savannah.cern.ch/projects/esc/ and https://rt.egi.eu/rt/Dashboards/2636/GGUS-Requirements |
monthly (web conf): Representatives from Technology Providers, NGIs, GGUS team, WLCG | https://indico.egi.eu/indico/categoryDisplay.py?categId=78 | GGUS Advisory Board (GGUS-AB) meeting | Further development of GGUS system |
need driven | no INDICO URL | one on one meetings with NGI interface developers | testing the interfaces, resolving interface issues |
need driven | no INDICO URL | meetings with EGI-SA2 | definition of the technology support workflows and their implementation |
2. Main Achievements
GGUS structure
Support units
Decommissioned support units
- "Condor Utils"
- "ETICS"
- "Torque Utils"
New support units
- "UMD Product Submission"
- "IDGF"
- "CVMFS"
GGUS web portal
- New "Did you knows?" about the following topics:
- Duplicate ticket.
- Display the quality of service of the support units on an info page at the portal
- Removed Type of Problem "Batch"
- Added the attribute "Ticket priority" to the XML output of the search results
GGUS system
- Adapted the synchronization with GOCDB according to the changed PI
Interfaces with other ticketing systems
- Further improvements to the GGUS-SNOW interface
Alarm tests after GGUS releases
- Executed the alarm and interface tests after each GGUS release.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Collaboration of GGUS and PRACE | This action is postponed as it has only low priority for PRACE at the moment. |
Collaboration of GGUS and MAPPER | The xGUS instance is ready for going life. Waiting for the go from the MAPPER people. |
Collaboration of GGUS and DANTE | No collaboration of GGUS and DANTE for now |
4. Plans for the next period
- Integration of Operations Portal in GGUS. This action is postponed as requested by Operations Portal admins.
- Fully integrate the CMS VO in GGUS and retire the interface to Savannah.
- Migrate GGUS shopping list from Savannah to JIRA.
- Implement alarm process through GGUS in case of failures of operational tools.
- Implement work flow for tickets needing information about UMD releases when issue was solved by PTs.
- Integration of support unit for EDUPERT
GGUS system
- Migrate GGUS to the xGUS framework
- Shibboleth authentication
- Finalize fail safe architecture
GGUS web portal
- Implement a bulk submit feature.
Interfaces with other systems
- Implement interface to XSEDE RT system
- Implement interface to PRACE RT system.