Difference between revisions of "EGI-InSPIRE:Poland-QR6"
Jump to navigation
Jump to search
m (moved Poland-QR6 to EGI-InSPIRE:Poland-QR6) |
|||
(27 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| cellspacing="0" cellpadding="2" border="1" | {| cellspacing="0" cellpadding="2" border="1" | ||
Line 37: | Line 40: | ||
! Outcome (Short report & Indico URL) | ! Outcome (Short report & Indico URL) | ||
|- | |- | ||
| | | 12-13 October 2011 | ||
| | | Poland, Poznan | ||
| | | e-IRG workshop | ||
| | | 136 | ||
| | | http://www.e-irg.eu/e-irg-events/e-irg-workshop-poznan-12-13-october.html<br><br>The e-Infrastructure Reflection Group organises workshops twice a year in <br>collaboration with the country holding the EU presidency. Workshops are <br>open to all, and function as incubators for feeding new information and <br>trends into the e-IRG plenum work. Internal meetings for the e-IRG <br>delegates are also scheduled four times a year.<br>The workshop includes some tomics related to EGI activities:<br>- Data Infrastructures and Data Management<br>- How to integrate the data infrastructure with the existing grid and <br>HPC infrastructures<br>- Users and infrastructure providers – demands vs. offers | ||
|} | |} | ||
Line 57: | Line 60: | ||
| Lyon<br> | | Lyon<br> | ||
| Technical Forum EGI 2011<br> | | Technical Forum EGI 2011<br> | ||
| | | 11<br> | ||
| https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919<br> | | https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919<br> | ||
|- | |- | ||
Line 68: | Line 71: | ||
| 19-21/10/2011<br> | | 19-21/10/2011<br> | ||
| Lyon<br> | | Lyon<br> | ||
| | | Second French Grid Operations Workshop | ||
| 1<br> | | 1<br> | ||
| | | http://indico.in2p3.fr/conferenceDisplay.py?confId=5551 <br> Exchanged experiences on Operations Model, Service Catalogue, Resource Allocation within NGIs. Founded mainly by France Grilles. | ||
|- | |||
| 19-23 September 2011 | |||
| Lyon<br> | |||
| Technical Forum EGI 2011<br> | |||
| 2<br> | |||
| https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919<br> | |||
|- | |||
| 24-28 November 2011 | |||
| Poland,Poznan<br> | |||
| Future Interenet Assembly<br> | |||
| 2<br> | |||
| http://www.future-internet.eu/home/future-internet-assembly/poznan-october-2011.html | |||
The European Future Internet Assembly also known as FIA, is a collaboration between projects that have recognised the need to strengthen European activities on the Future Internet to maintain European competitiveness in the global marketplace. | |||
|} | |} | ||
<br> <!-- | |||
Please, fill the fields replacing <...> sections with your data. You can add a line copyng the two lines: | |||
|} | |||
<!-- | Only Cyfronet, WCSS so far<br> <!-- | ||
Please, fill the fields replacing <...> sections with your data. You can add a line copyng the two lines: | Please, fill the fields replacing <...> sections with your data. You can add a line copyng the two lines: | ||
|<Date>||<Location>||Title||Participants||Outcome | |<Date>||<Location>||Title||Participants||Outcome | ||
Line 96: | Line 115: | ||
#'''Nagios''' | #'''Nagios''' | ||
## | ##Production instance: Polish NGI integrated own tests into offcial EGI SAM/nagios production instance: scientific applications, additional UNICORE and QCG middleware tests | ||
# | ##Testing instance: UPDATE-14 (with UNICORE tests) was installed and tested. Our testing instance also started to test uncertified sites.<br> | ||
#'''Unicore''' | #'''Unicore''' | ||
##Preparation of UNICORE tests for SAM update 14, testing and debuging | |||
##<span lang="en" class="short_text" id="result_box"><span class="hps">Initiation of work on</span></span> UNICORE accounting intergation with APEL | |||
#'''Availability/Reliability metrics''' | #'''Availability/Reliability metrics''' | ||
##NGI _PL availability for August 80% | ##NGI _PL availability for August 80% and in September 89; low A/R due to new services and hardware integration. | ||
#'''NGI_PL security team ''' | #'''NGI_PL security team ''' | ||
##regular operational actions within EGI CSIRT IRTF | ##regular operational actions within EGI CSIRT IRTF | ||
##taking part in weekly and monthly meetings of EGI CSIRT | ##taking part in weekly and monthly meetings of EGI CSIRT | ||
##participation in EGI CSIRT F2F meeting in Lyon (2 attendants) | ##participation in EGI CSIRT F2F meeting in Lyon (2 attendants) | ||
##submission of 2 vulnerabilities to EGI SVG | ##submission of 2 vulnerabilities to EGI SVG'''<br>''' | ||
#'''NGI_PL | #'''ROD NGI_PL''' | ||
##NGI_PL registered QCG and CUSTOM_SERVICE services in GOCDB. NGI_PL is testing alarm generation in Operations Portal for these services. | |||
#'''Changes on sites ''' | #'''Changes on sites ''' | ||
##WCSS64 | ##WCSS64 | ||
###new services UNICORE, QCG | ###new services UNICORE, QCG<br> | ||
## | ##CAMK | ||
## | ###Migration to ScientificLinux 5.6 and gLite 3.2 | ||
## | ###SE is working right now as SRM and SRMv2 | ||
##new hardware | ###new services: CREAMCE, APEL | ||
## | ###new hardware 120TB disc space RAID6 and 144 cores Xeon X5650 | ||
#''' | ##TASK | ||
#''' | ###new services: QosCosGrid and UMD Cream | ||
###new hardware: 191 nodes and vSMP machine. | |||
##WARSAW_EGEE | |||
###new services: ce.polgrid.pl<span class="clickylink" />, se5.polgrid.pl <span class="clickylink" /> | |||
###<span class="clickylink">new hardware:</span> 120 x (2CPU (Intel Xeon X5660) + 24GB RAM ), and 32x ( 2CPU(AMD Opteron 2435) + 32GB RAM), SunFire 4540 48TB raw | |||
##New site certified: WUT<br> | |||
#'''Task forces in which NGI_PL participate''' | |||
##OLA TF | |||
##Regionalisation TF | |||
##UNICORE Integration TF | |||
##Federated Clouds TF<br> | |||
#'''Technical Forum - Lyon ''' | |||
##NGI_PL <span lang="en" class="short_text" id="result_box"><span class="hps">took</span> <span class="hps">an active part</span> <span class="hps">in TF sessions</span></span> | |||
###UNICORE Task Force : https://www.egi.eu/indico/getFile.py/access?contribId=31&resId=1&materialId=slides&confId=452 | |||
###RC FORUM https://www.egi.eu/indico/contributionDisplay.py?sessionId=52&contribId=387&confId=452 <br> | |||
###Tool Marketplace: https://www.egi.eu/indico/contributionDisplay.py?sessionId=79&contribId=401&confId=452 | |||
=== 2.2. Main Achievements === | === 2.2. Main Achievements === | ||
NGI_PL is highly involved in several task forces. We support and introduce a <span lang="en" class="short_text" id="result_box"><span class="hps">wide range of middlewares (glite, UNICORE, QCG) to </span></span><span lang="en" class="short_text" id="result_box"><span class="hps">adapt to the</span> <span class="hps">demands and</span> <span class="hps">needs of users.</span></span> | |||
=== 2.3. Issues and mitigation === | === 2.3. Issues and mitigation === |
Latest revision as of 17:52, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
6 | NGI_PL | CYFRONET | Małgorzata Krakowian |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
12-13 October 2011 | Poland, Poznan | e-IRG workshop | 136 | http://www.e-irg.eu/e-irg-events/e-irg-workshop-poznan-12-13-october.html The e-Infrastructure Reflection Group organises workshops twice a year in collaboration with the country holding the EU presidency. Workshops are open to all, and function as incubators for feeding new information and trends into the e-IRG plenum work. Internal meetings for the e-IRG delegates are also scheduled four times a year. The workshop includes some tomics related to EGI activities: - Data Infrastructures and Data Management - How to integrate the data infrastructure with the existing grid and HPC infrastructures - Users and infrastructure providers – demands vs. offers |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
18-23/09/2011 | Lyon |
Technical Forum EGI 2011 |
11 |
https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919 |
25-28/08/2011 |
Amsterdam |
EGI council | 1 |
|
19-21/10/2011 |
Lyon |
Second French Grid Operations Workshop | 1 |
http://indico.in2p3.fr/conferenceDisplay.py?confId=5551 Exchanged experiences on Operations Model, Service Catalogue, Resource Allocation within NGIs. Founded mainly by France Grilles. |
19-23 September 2011 | Lyon |
Technical Forum EGI 2011 |
2 |
https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919 |
24-28 November 2011 | Poland,Poznan |
Future Interenet Assembly |
2 |
http://www.future-internet.eu/home/future-internet-assembly/poznan-october-2011.html
The European Future Internet Assembly also known as FIA, is a collaboration between projects that have recognised the need to strengthen European activities on the Future Internet to maintain European competitiveness in the global marketplace. |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Nagios
- Production instance: Polish NGI integrated own tests into offcial EGI SAM/nagios production instance: scientific applications, additional UNICORE and QCG middleware tests
- Testing instance: UPDATE-14 (with UNICORE tests) was installed and tested. Our testing instance also started to test uncertified sites.
- Unicore
- Preparation of UNICORE tests for SAM update 14, testing and debuging
- Initiation of work on UNICORE accounting intergation with APEL
- Availability/Reliability metrics
- NGI _PL availability for August 80% and in September 89; low A/R due to new services and hardware integration.
- NGI_PL security team
- regular operational actions within EGI CSIRT IRTF
- taking part in weekly and monthly meetings of EGI CSIRT
- participation in EGI CSIRT F2F meeting in Lyon (2 attendants)
- submission of 2 vulnerabilities to EGI SVG
- ROD NGI_PL
- NGI_PL registered QCG and CUSTOM_SERVICE services in GOCDB. NGI_PL is testing alarm generation in Operations Portal for these services.
- Changes on sites
- WCSS64
- new services UNICORE, QCG
- new services UNICORE, QCG
- CAMK
- Migration to ScientificLinux 5.6 and gLite 3.2
- SE is working right now as SRM and SRMv2
- new services: CREAMCE, APEL
- new hardware 120TB disc space RAID6 and 144 cores Xeon X5650
- TASK
- new services: QosCosGrid and UMD Cream
- new hardware: 191 nodes and vSMP machine.
- WARSAW_EGEE
- new services: ce.polgrid.pl<span class="clickylink" />, se5.polgrid.pl <span class="clickylink" />
- new hardware: 120 x (2CPU (Intel Xeon X5660) + 24GB RAM ), and 32x ( 2CPU(AMD Opteron 2435) + 32GB RAM), SunFire 4540 48TB raw
- New site certified: WUT
- WCSS64
- Task forces in which NGI_PL participate
- OLA TF
- Regionalisation TF
- UNICORE Integration TF
- Federated Clouds TF
- Technical Forum - Lyon
- NGI_PL took an active part in TF sessions
- UNICORE Task Force : https://www.egi.eu/indico/getFile.py/access?contribId=31&resId=1&materialId=slides&confId=452
- RC FORUM https://www.egi.eu/indico/contributionDisplay.py?sessionId=52&contribId=387&confId=452
- Tool Marketplace: https://www.egi.eu/indico/contributionDisplay.py?sessionId=79&contribId=401&confId=452
- NGI_PL took an active part in TF sessions
2.2. Main Achievements
NGI_PL is highly involved in several task forces. We support and introduce a wide range of middlewares (glite, UNICORE, QCG) to adapt to the demands and needs of users.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|