Difference between revisions of "EGI-InSPIRE:Serbia-QR5"
Jump to navigation
Jump to search
m (moved Serbia-QR5 to EGI-InSPIRE:Serbia-QR5) |
|||
(10 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 89: | Line 92: | ||
|Nonlinear Bose-Einstein-condensate Dynamics Induced by a Harmonic Modulation of the S-wave Scattering Length | |Nonlinear Bose-Einstein-condensate Dynamics Induced by a Harmonic Modulation of the S-wave Scattering Length | ||
||Phys. Rev. A | ||Phys. Rev. A | ||
||84 (2011) | ||84 (2011) 013618; DOI: dx.doi.org/10.1103/PhysRevA.84.013618 | ||
||1. I. Vidanovic<br />2. A. Balaz<br />3. H. Al-Jibbouri<br />Et al. | ||1. I. Vidanovic<br />2. A. Balaz<br />3. H. Al-Jibbouri<br />Et al. | ||
|- | |- | ||
Line 98: | Line 101: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* Upgrade of central NGI_AEGIS User Interface machine (ui.ipb.ac.rs) to Intel Xeon machine with 8 cores and 16 GB of RAM | |||
* Operation of WMS/LB/VOMS/PX/LFC/Pakiti services for NGI_AEGIS, ATLAS and CMS VOs | |||
* Security issues broadcasted by EGI-CSIRT team are dealt in timely manner | |||
* Deployment of AutoDock Vina software at two AEGIS Grid sites (AEGIS01-IPB-SCL and AEGIS07-IPB-ATLAS) | |||
* Operational support to NGI_BA and NGI_GE | |||
* Regular middleware updates on all NGI_AEGIS sites | |||
* Contributions to EGI milestones, quarterly and annual reports ("D3.2 Annual Report on the status of EGI's User Services and Community Coordination", MS410 "EGI Helpdesk and the NGI Support Units", "D1.4 Annual Project Reports"). | |||
* ILOG CPLEX optimizer code is ported to AEGIS infrastructure | |||
* Regular attendance to all Operations Management Board and Operations meetings | |||
* Quick response on all staged rollout CREAMCE, WMS, and LB service tickets | |||
* Regular maintenance of NGI_AEGIS Helpdesk | |||
* Contribution of all NGI AEGIS sites to EGI survey: Batch system deployment | |||
* Contribution to EGI survey: top-BDII deployment scenarios | |||
* Regular updates of NGI AEGIS Nagios box (responsible for NGI_AEGIS and NGI_GE) | |||
* Contribution to EMI Middleware requirements (GGUS #71173) | |||
* AEGIS03-ELEF-LEDA resource center is fully upgraded to gLite-3.2 | |||
* Contributions to EGI-InSPIRE review assignments. IPB volunteered to review MS610 (Services for High Energy Physics) and D6.4 (Capabilities Offered by the HUCs to other Communities) documents | |||
* Update of CA RPMs: EGI Trust Anchor release 1.40-1 | |||
* New RC OLA is presented to NGI_AEGIS resource centers. Preparation of new modified OLA compliant with present RC OLA is in progress | |||
* Update of NGI_AEGIS operation tools deployment plan ([[Operations_tools_deployment_plans]]) | |||
* Operation of AEGIS CA | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Major upgrade of central NGI_AEGIS User Interface machine (ui.ipb.ac.rs) | |||
* Installation of two new stage rollout components (WMS and LB) | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== |
Latest revision as of 17:53, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR5 | NGI_AEGIS | Institute of Physics Belgrade | Dusan Vudragovic |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
17/05/2011 | Sofia, Bulgaria | IPB at SEERA-EI meeting in Sofia | 100 | The Executive Agency “Electronic Communications Networks and Information Systems” of the Bulgarian government, as a part of SEERA –EI project activities, has organized a meeting on “HPC related policy and programs” for South Eastern Europe policy makers. This event is seen as a crucial step for planning the SEE common vision and strategy for eInfrastructures coordinated development and use.
SCL's Antun Balaz present Serbian experiences, plans and expectations towards SEE high performance computing infrastructures development during the round table on "HPC initiatives in other SEE countries: Romania, Serbia, FYROM, Greece". More information and presentation is available at: http://www.scl.rs/news/743 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
Quantum Critical Transport Near the Mott Transition | Phys. Rev. Lett. | 107 (2011) 026401; DOI: dx.doi.org/10.1103/PhysRevLett.107.026401 | 1. H. Terletska 2. J. Vucicevic 3. D. Tanaskovic Et al. |
The Role of Disorder on the Electronic Structure of Conjugated Polymers. the Case of Poly-2,5-bis(phenylethynyl)-1,3,4-thiadiazole | Phys. Chem. Chem. Phys. | DOI: dx.doi.org/10.1039/c1cp20329k | 1. J. M. Granadino-Roldan 2. N. Vukmirovic 3. M. Fernandez-Gomez Et al. |
Nonlinear Bose-Einstein-condensate Dynamics Induced by a Harmonic Modulation of the S-wave Scattering Length | Phys. Rev. A | 84 (2011) 013618; DOI: dx.doi.org/10.1103/PhysRevA.84.013618 | 1. I. Vidanovic 2. A. Balaz 3. H. Al-Jibbouri Et al. |
2. ACTIVITY REPORT
2.1. Progress Summary
- Upgrade of central NGI_AEGIS User Interface machine (ui.ipb.ac.rs) to Intel Xeon machine with 8 cores and 16 GB of RAM
- Operation of WMS/LB/VOMS/PX/LFC/Pakiti services for NGI_AEGIS, ATLAS and CMS VOs
- Security issues broadcasted by EGI-CSIRT team are dealt in timely manner
- Deployment of AutoDock Vina software at two AEGIS Grid sites (AEGIS01-IPB-SCL and AEGIS07-IPB-ATLAS)
- Operational support to NGI_BA and NGI_GE
- Regular middleware updates on all NGI_AEGIS sites
- Contributions to EGI milestones, quarterly and annual reports ("D3.2 Annual Report on the status of EGI's User Services and Community Coordination", MS410 "EGI Helpdesk and the NGI Support Units", "D1.4 Annual Project Reports").
- ILOG CPLEX optimizer code is ported to AEGIS infrastructure
- Regular attendance to all Operations Management Board and Operations meetings
- Quick response on all staged rollout CREAMCE, WMS, and LB service tickets
- Regular maintenance of NGI_AEGIS Helpdesk
- Contribution of all NGI AEGIS sites to EGI survey: Batch system deployment
- Contribution to EGI survey: top-BDII deployment scenarios
- Regular updates of NGI AEGIS Nagios box (responsible for NGI_AEGIS and NGI_GE)
- Contribution to EMI Middleware requirements (GGUS #71173)
- AEGIS03-ELEF-LEDA resource center is fully upgraded to gLite-3.2
- Contributions to EGI-InSPIRE review assignments. IPB volunteered to review MS610 (Services for High Energy Physics) and D6.4 (Capabilities Offered by the HUCs to other Communities) documents
- Update of CA RPMs: EGI Trust Anchor release 1.40-1
- New RC OLA is presented to NGI_AEGIS resource centers. Preparation of new modified OLA compliant with present RC OLA is in progress
- Update of NGI_AEGIS operation tools deployment plan (Operations_tools_deployment_plans)
- Operation of AEGIS CA
2.2. Main Achievements
- Major upgrade of central NGI_AEGIS User Interface machine (ui.ipb.ac.rs)
- Installation of two new stage rollout components (WMS and LB)
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|