Difference between revisions of "EGI-InSPIRE:SA1.4-QR5"
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
= 1. Task Meetings = | = 1. Task Meetings = | ||
Line 34: | Line 37: | ||
= 2. Main Achievements = | = 2. Main Achievements = | ||
Two new versions of Operations portal were deployed in this quarter: 2.6.1 on May 26th and 2.6.2 on June 28th. Detailed list of new features can be found in JRA1 section. At the end of the quarter there were four NGI instances: NGI_BY, NGI_CZ, NGI_GRNET and NGI_IBERGRID. Broadcasts and VO ID cards are part of Operations portal. Decommission of the old CIC portal (cic.egi.eu) was postponed and is planned for September 2011. | |||
Two new versions of SAM were deployed in this quarter: SAM-Update11 on June 22th and SAM-Update12 on July 22th. Additional minor release Update-11.2 was deployed on July 4th due to the IGTF CA release. | Two new versions of SAM were deployed in this quarter: SAM-Update11 on June 22th and SAM-Update12 on July 22th. Additional minor release Update-11.2 was deployed on July 4th due to the IGTF CA release. | ||
Line 49: | Line 52: | ||
One manual relevant for operational tools was presented at the Operations Management Board on July 26th 2011: | One manual relevant for operational tools was presented at the Operations Management Board on July 26th 2011: | ||
* Tool Intervention Management ( | * Tool Intervention Management ([[MAN04_Tool_Intervention_Management]]) | ||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Latest revision as of 18:59, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
There are no specific SA1.4 meetings. It was agreed to discuss all deployment issues with operational tool representatives at the JRA1 meetings. Below is the list of JRA1 meetings and subjects relevant for SA1.4 which were discussed.
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
19/05/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=487 | InSPIRE-JRA1 phone conf | Operations Portal regionalization plans. |
26/05/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=493 | Virtual Sites phone | Handling virtual sites (NGIs) and central operational tools in SAM monitoring and ACE availability calculations. |
31/05/2011 | http://indico.cern.ch/sessionDisplay.py?sessionId=25&confId=124206#20110531 | Nagios Probes Task Force Meeting (2nd EMI All Hands Meeting) | Presentation and planning of probe handover to EMI product teams. |
09/06/2010 | https://www.egi.eu/indico/conferenceDisplay.py?confId=426 | InSPIRE-JRA1 phone conf | Updates on requirements for all tools. |
2. Main Achievements
Two new versions of Operations portal were deployed in this quarter: 2.6.1 on May 26th and 2.6.2 on June 28th. Detailed list of new features can be found in JRA1 section. At the end of the quarter there were four NGI instances: NGI_BY, NGI_CZ, NGI_GRNET and NGI_IBERGRID. Broadcasts and VO ID cards are part of Operations portal. Decommission of the old CIC portal (cic.egi.eu) was postponed and is planned for September 2011.
Two new versions of SAM were deployed in this quarter: SAM-Update11 on June 22th and SAM-Update12 on July 22th. Additional minor release Update-11.2 was deployed on July 4th due to the IGTF CA release. SAM/Nagios deployment of NGI instances continued. Ireland NGI (NGI_IE) decided to share SAM instance with UK so it is still covered with UKI ROC instance. The following NGI instances were deployed:
- Finland: validated on June 8th 2011
At the end of the quarter following SAM/Nagios instances were in production:
- 25 NGI instances covering 35 EGI partners
- 3 ROC instances covering 4 EGI partners
- 1 project instances covering 1 EGI partners
- 3 external ROC instances covering the following regions: Canada, IGALC and LA.
Detailed list of SAM/Nagios instances can be found on the following page: SAM Instances.
Decommission of gridops.org domain was performed on July 4th 2011 without any issues.
One manual relevant for operational tools was presented at the Operations Management Board on July 26th 2011:
- Tool Intervention Management (MAN04_Tool_Intervention_Management)
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
High availability of central operational tools is needed. | GOCDB: dynamic loadbalancing DNS setup is provided for the address goc.egi.eu. Secondary instance in Fraunhofer institute is still being deployed. SAM: SAM-Update13 release of SAM will contain option to install secondary instance, this will be deployed based on depending on NGI size and resources. Due to other priorities this feature has been delayed from Update-11 to Update-13. Operations, accounting portal and metrics portal: services are deployed on virtualization platforms, backups performed regularily, recovery in case of failure can be performed quickly. |
4. Plans for the next period
Decommission of the old CIC portal (cic.egi.eu) is planned for the next quarter (September).
Track deployment and validation of remaining regional and NGI Nagioses. Deployment plans of the remaining NGIs are the following:
- UK plans to perform NGI creation in the next quarter.
Track development of probes for monitoring operational tools and integration into ops-monitor Nagios instance.
Track and perform planned tests of failover configurations of centralized tools.