Difference between revisions of "Agenda-31-01-2011"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
===1 - Information, MW releases and Staged rollout (Mario)=== | ===1 - Information, MW releases and Staged rollout (Mario)=== | ||
====1.1 - In staged rollout==== | |||
* glite 3.1: | * glite 3.1: | ||
Line 11: | Line 13: | ||
LFC Oracle 1 EA performing the test | LFC Oracle 1 EA performing the test | ||
LFC mysql 1 EA performing the test | LFC mysql 1 EA performing the test | ||
L&B 1 EA performing the test | |||
===2 - Operational issues (all)=== | ===2 - Operational issues (all)=== |
Revision as of 00:45, 30 January 2011
Detailed agenda Grid Operations Meeting 31 January 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- glite 3.2:
VOMS 1 EA performing the test LFC Oracle 1 EA performing the test LFC mysql 1 EA performing the test L&B 1 EA performing the test
2 - Operational issues (all)
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Back GridOpsMeeting