Difference between revisions of "Competence centre EPOS"
Line 1: | Line 1: | ||
<br>[[Image:EPOS logo.png|right|200px|EPOS logo.png]]<br><br> | |||
<br> | <br> | ||
Line 373: | Line 369: | ||
</style> | </style> | ||
<![endif]--> <!--StartFragment--> <div align="center"> | <![endif]--> <!--StartFragment--> <div align="center"> | ||
{| width="100%" cellspacing="1" cellpadding="3" border="1" style="background-position: initial; background-repeat: initial; | {| width="100%" cellspacing="1" cellpadding="3" border="1" class="MsoNormalTable" style="background-position: initial; background-repeat: initial;" | ||
|- | |- | ||
! Partner/institution | ! Partner/institution | ||
Line 400: | Line 396: | ||
| Software development, Prototyping and hosting of services (Cloud), AA Architecture, VERCE iRODS | | Software development, Prototyping and hosting of services (Cloud), AA Architecture, VERCE iRODS | ||
| Horst Schwichtenberg: horst.schwichtenberg@scai.fraunhofer.de | | Horst Schwichtenberg: horst.schwichtenberg@scai.fraunhofer.de | ||
| | | <br> | ||
| 4.5 | | 4.5 | ||
|- | |- | ||
Line 416: | Line 412: | ||
| Operation and hosting of necesary services | | Operation and hosting of necesary services | ||
| Kostas Koumantaros: kkoum@grnet.gr | | Kostas Koumantaros: kkoum@grnet.gr | ||
| | | <br> | ||
| 4.5 | | 4.5 | ||
|- | |- | ||
Line 434: | Line 430: | ||
Geneviève Moguilny: moguilny@ipgp.fr | Geneviève Moguilny: moguilny@ipgp.fr | ||
| | | <br> | ||
| 9 | | 9 | ||
|} | |} | ||
Line 477: | Line 473: | ||
|} | |} | ||
<br> |
Revision as of 09:54, 23 June 2015
General Info
CC Coordinator: Daniele Bailo, Mariusz Sterzel
CC members' list: cc-epos AT mailman.egi.eu
The task will operate a CC to drive the future design of the use of grid and cloud for the integrated solid Earth Sciences research as part of the European Plate Observing System (EPOS). The CC will
- identify and validate authentication and authorisation services,
- will test cloud resources and usage models,
- provide knowledge transfer services between e-Infrastructure and EPOS communities.
Meetings minutes
Participants and tasks
In the framework of this EPOS CC, the following partners are included. Each partner will contribute with the work/effort listed in the "task" column.
Partner/institution | Contribution | Contact Person | Deliverables | Resources (PMs) |
---|---|---|---|---|
INGV | Set up and design of the "AAI usecase", involve EPOS community, coordinate the work | Daniele Bailo: daniele.bailo@ingv.it | D6.23, Report on evaluation of EPOS EGI pilot studies;
Report, M30 |
4 |
CYFRONET | Provide access and communication (AAAI) for the Anthropogenic Hazard EPOS Community | Mariusz Sterzel: m.sterzel@cyfronet.pl | D 6.19 EPOS: EGI pilot integrating computational resources and services;
DEM, M24 |
4.5 |
SCAI Fraunhofer | Software development, Prototyping and hosting of services (Cloud), AA Architecture, VERCE iRODS | Horst Schwichtenberg: horst.schwichtenberg@scai.fraunhofer.de | 4.5 | |
KNMI | Support for computational workflow adaptation and provenance managament. Science gateway integration (VERCE - FW Simulation Use Case).
KNMI and INGV, host two of the EIDA seismological data nodes, which are replicated to EUDAT resources. |
Alessandro Spinuso: alessandro.spinuso@knmi.nl | D 6.13: EPOS EGI pilot incorporating data retrieval, transfer and linkage;
DEM M18 |
4 |
GRNET | Operation and hosting of necesary services | Kostas Koumantaros: kkoum@grnet.gr | 4.5 | |
CNRS |
Hosting site (to be confirmed) participation to the computational use case Documentation for the Computational use case |
Geneviève Romier: genevieve.romier@idgrilles.fr;
Geneviève Moguilny: moguilny@ipgp.fr |
9 |
Deliverables
M6.4 | EPOS requirements analysis and outline of pilot use cases are agreed | WP 6 | R | PU | M12 | |
D 6.13 | EPOS EGI pilot incorporating data retrieval, transfer and linkage | WP 6 | SURFsara/ KNMI | DEM | PU | M18 |
D 6.19 | EPOS EGI pilot integrating computational resources and services | WP 6 | CYFRONET | DEM | PU | M24 |
D 6.23 | Report on evaluation of EPOS EGI pilot studies | WP 6 | INFV/INGV | R | PU | M30 |