==1. MEETINGS AND DISSEMINATION == | ==1. MEETINGS AND DISSEMINATION == | ||
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | <!--=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | ||
*please do not provide a list of participants, only give the number of people that attended | *please do not provide a list of participants, only give the number of people that attended | ||
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“ | *for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“ | ||
Line 27: | Line 30: | ||
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | **If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. --> | ||
===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ||
Line 84: | Line 87: | ||
|- | |- | ||
|''e-Referral and e-Science prototype infrastructure for hadron therapy'' || Grid and e-Science: ATLAS data analysis and Medical Physics || 18. 19 – 11 -2010 ||1.Faustin Roman<br>2.Gabriel Amoros | |''e-Referral and e-Science prototype infrastructure for hadron therapy'' || Grid and e-Science: ATLAS data analysis and Medical Physics || 18. 19 – 11 -2010 ||1.Faustin Roman<br>2.Gabriel Amoros | ||
|} | |} | ||
<br /> | |||
== 2. ACTIVITY REPORT == | == 2. ACTIVITY REPORT == | ||
Line 139: | Line 139: | ||
|- | |- | ||
|Additional problems were originated by the fact that r-Nagios was not using failover services|| This point was addressed reconfiguring the r-Nagios server with failover configurations for the multiple services the r-Nagios uses (WMS, TopBDII, VOMS, ...). An issue which is still not solved is the fact that r-Nagios still uses a unique myproxy server to store the nagios user credentials. If the server is down, it will prevent the user from renewing credential. r-Nagios developers have been contacted to check in this issue. | |Additional problems were originated by the fact that r-Nagios was not using failover services|| This point was addressed reconfiguring the r-Nagios server with failover configurations for the multiple services the r-Nagios uses (WMS, TopBDII, VOMS, ...). An issue which is still not solved is the fact that r-Nagios still uses a unique myproxy server to store the nagios user credentials. If the server is down, it will prevent the user from renewing credential. r-Nagios developers have been contacted to check in this issue. | ||
|- | |- | ||
|} | |} |
Latest revision as of 18:46, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR3 | Ibergrid | LIP & CSIC | Esteban Freire García (CESGA) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2/12/2010 | Universitat Autònoma de Barcelona (UAB) - Bellaterra, Barcelona. | 4ª Reunión Plenaria de la Red Española de e-Ciencia | Most of the people at PIC, since it was located nearby | http://www.e-ciencia.es/FichaEvento.jsp?externos=null&IDEvento=23
This was the first plenary meeting of the National e-science network in Spain (part of NGI-IBERGRID) after the start of EGI. It was celebrated in the UAB and co-organised by IFAE/PIC and UPV. Several topics regarding the Spanish NGI were discussed, from operational issues to VO management and organisation. A talk was given by one member of our group (G. Merino) to report on the experience of the LHC Grid: http://www.e-ciencia.es/indico/contributionDisplay.py?contribId=9&sessionId=3&confId=14 |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
16-17 November 2010 | Geneva | Distributed Database Operations Workshop 2010 | 2 | Regular workshop to discuss status and progress of the Database Services. These are very much linked to Core Grid services like FTS and LFC as of today. |
5-10 December 2010 | Geneva | CMS Week | 1 | Reporting about the Tier1 status, plus the CMS system overall. Two big actions for the mid-term are discussed for the latter: migration from ProdAgent to WMSAgent and from DB2 to DB3.
Discussion about the work on FTS log parser. Plan is to make a web interface and automate it. Prepare a contribution to the EGI UF. http://indico.cern.ch/conferenceDisplay.py?confId=112310 |
15/12/10 | Córdoba (Spain) | PkIRISGrid RAs managers meeting in Cordoba | 1 | http://pki.irisgrid.es/coord/jt2010/ |
24-26 January 2011 | Bari | CMS Storage and Data Access Evolution Workshop | 1 | Special workshop to discuss about the mid and long term plans of data management systems for CMS on the LHC Grid.
http://indico.cern.ch/conferenceOtherViews.py?confId=114281&view=standard |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
e-Referral and e-Science prototype infrastructure for hadron therapy | Grid and e-Science: ATLAS data analysis and Medical Physics | 18. 19 – 11 -2010 | 1.Faustin Roman 2.Gabriel Amoros |
2. ACTIVITY REPORT
2.1. Progress Summary
1. The EGEE ROC SWE was decommission (GGUS ticket #64997)
2. All sites in NGI_IBERGRID have migrated from R-GMA MonBox to glite-APEL (GGUS ticket #62497)
3. The dteam VO was enforced in all sites
4. The CERN dteam VOMS was substituted by the Hellasgrid dteam VOMS in all sites (GGUS tickets #65315 and #66014)
5. Coordinated upgrade of all the WMS in the region, supporting IBERGRID VOS, before upgrading the IBERGRID VOMS server to gLite 3.2 (due to savannah bug #72185)
6. Working on a redundancy schema for core services running backend databases (LFC and VOMS)
7. Participating in the roll-out activities of the gLite 3.2 CreamCE, gLite 3.2 TopBDII, gLite 3.2 VOMS (LIP) and gLite 3.1 WMS (IFIC)
8. Upgrade of the regional Nagios to the last production release
9. Operation and upgrades of the regional operational dashboard.
10. Contribution to the deliverable “D4.1 - EGI Operations Architecture”
11. Contribution on a best effort basis to the Certification Manual documentation
2.2. Main Achievements
1. gLite-APEL migration completed
2. EGEE ROC SWE decommission completed
3. Support of dteam VO in all NGI_IBERGRID sites completed
4. The user support strategy of migration users from the application VOs to the macro IBERGRID VOs is finished
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
During December, the r-Nagios service in NGI_IBERGRID was unstable generating a large fraction of unknown information on December Availability / Reliability report. Several tickets were open due to these problems (for example, GGUS #65776) | All the issues were solved when the latest r-NAGIOS production release was installed in January increasing the overall reliability of the service. |
Additional problems were originated by the fact that r-Nagios was not using failover services | This point was addressed reconfiguring the r-Nagios server with failover configurations for the multiple services the r-Nagios uses (WMS, TopBDII, VOMS, ...). An issue which is still not solved is the fact that r-Nagios still uses a unique myproxy server to store the nagios user credentials. If the server is down, it will prevent the user from renewing credential. r-Nagios developers have been contacted to check in this issue. |