Difference between revisions of "EGI-InSPIRE:Jra1 2014-03-11"
Jump to navigation
Jump to search
imported>Krakow |
|
(No difference)
|
Revision as of 12:55, 6 January 2015
EGI Inspire Main page |
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
- MS711
- Current Status: External review completed - at AMB
- Draft Complete: 31st of January
- Document URL: https://documents.egi.eu/document/2069
- Moderator: Malgorzata Krakowian
- Reviewer: Christos Kanellopoulos
- D7.4
- Current Status: Draft not yet completed
- Draft Complete: 3rd of March
- Document URL: https://documents.egi.eu/document/2121
- Moderator: Peter Solagna
- Reviewers: Marcin Radecky and Goncalo Borges
- QR15
- JRA1 contribution sent to AMB
2. Critical Issues
- Nothing new to report
3. Major work done during the past week by task
3.1 TJRA1.1
- Tools roadmap review
- D7.4: draft
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
- No report received
3.2.2 GOCDB
- OS upgrade to RHEL6. RAL site suffered a number of DNS/network issues that caused dropped connections. Time was spent on subsequent investigation and system monitoring / sys-admin.
- Investigation and bug fixes:
- A 'hostname' PI parameter fix for the ‘get_services’ PI method. This fixes the jump in CPU load found after deploying v5.2.
- Change the ops monitor check to check the portal landing page.
- Updated selected PI queries to use ‘fetch-joins’ in order to make queries more efficient.
- Removed a require_once glob in PI index.php (instead PI queries only require the relevant IPIQuery file). This improves performance.
3.2.3 GGUS
- Implementation and testing of CMS integration into GGUS
- Preparing next GGUS release
- Ticket monitoring
- Phoneconf to discuss GGUS development issues
3.2.4 Ops Portal
- Evaluation of the feedback about the candidate release
- Preparation of the release
3.2.5 Accounting Repository
- No report received
3.2.6 Accounting Portal
- Security work
- Work on pay-per-use, per-user cost calculation
- Changes on custom VO handling
- Continuing refactor of the code
- Updated RT tickets on dashboard
3.2.7 Metrics Portal
- Maintenance
- Bug fixing
- Server updating
3.3 TJRA1.4 (Accounting for new resource types)
3.3.1 Accounting Repository
- No report received
3.3.2 Accounting Portal
- Work on Storage view
- Work on MPI view
4. Next Meetings
- Migration of SAM Central Services - 6th meeting: 18 March 2014
- Next JRA1 Meeting: 26 March 2014