Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Ibergrid-QR13

From EGIWiki
Jump to navigation Jump to search
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR13 NGI_IBERGRID LIP & CSIC Goncalo Borges


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
08/05/2013 CERN, Geneva CMS Disk/Tape separation Workshop A. Pérez-Calero dCache sites – PIC case (https://indico.cern.ch/conferenceDisplay.py?confId=249032)
13/05/2013 Barcelona, Spain LHCP Conference A. Pérez-Calero, J. Flix The LHC Tier1 at PIC: experience from first LHC run (http://lhcp2013.ifae.es/)
26/06/2013 Lisbon, Portugal FET- Flagship HBP: Workshop on Human Brain Project: A roadmap for Portugal J. Pina http://www.gppq.fct.pt/_7pq/eventos.php?id=987


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  • Participation in the task force on availability/reliability computation
  • Participation in the biweekly operation meetings
  • Provide feedback on the survey focused on NGI services provisioning and usage
  • Follow up and support of the SHA-2 compliant infrastructure campaign.
  • Follow up and support of GOCDB MPI registration campaign
  • Review of the "Compromised Certificates and Emergency suspension" Procedure
  • Follow up with unresponsive VO managers regarding incomplete information (in the operations portal) for VOs in VOMS inside the iberian infrastructure
  • Finalize decommission of two sites: SGAI-CSIC and IAA-CSIC
  • Evaluation of operation core activities biding process
  • Follow up with regional sites regarding
  1. EGI ADVISORY [EGI-ADV-20130514]
  2. EGI SVG ADVISORY [EGI-SVG-2013-5268]
  3. EGI SVG ADVISORY [EGI-SVG-2013-5331]

2.2. Main Achievements

  • Implementation of backup SAM nagios @ LIP
  • Push for the extension of CVMFS client configuration to support phys.vo.ibergrid.eu. CVMFS for phys.vo.ibergrid.eu is already available at almost all WLCG sites
  • Provisioning of resources for the Distributed Research Infrastructure for Hydro-Meteorology Study (DRIHM) project at some of the Iberian sites
  • 100% availability/reliability for the topbdii.core.ibergrid.eu service during QR13
  • Sustainable integrated A/R for ibergrid sites during QR13
  1. May (98%/98% A/R)
  2. June (98%/98% A/R)
  3. July (96%/97% A/R)

2.3. Issues and mitigation

Issue Description Mitigation Description
SAM tests seems to be failing for a couple of hours during the first hours of the 1st of each month Investigation of the issue was inconclusive. For the transition July --> August we have switch to the backup nagios at LIP to understand if the failure is related to the site (main instance is deployed at CESGA) or to the service itself.
Failover between backup SAM instance and main SAM instance is manual We are investigating in some mechanism to trigger the failover automatically