Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

WI03 RC and RP OLA violation report followup

From EGIWiki
Revision as of 09:43, 23 July 2010 by Radecki (talk | contribs)
Jump to navigation Jump to search

Under Construction

Tasks done in parallel 1a. Generate tickets 1b. Provide list of sites for suspension Look at two previous months in AR report and the current month. If all are below 50% then sites qualifies for suspension.

Po upłynięciu terminu zebrania explanations od NGI w master ticket należy wstawić podsumowanie sajtów/NGI które nie odpowiedzialy lub dostarczyły niesatysfakcjonującej odpowiedzi.