Under Construction | ''Under Construction'' | ||
This page describes steps which should be taken by COD shifter to follow availability/reliability issues. | This page describes steps which should be taken by COD shifter to follow availability/reliability issues. | ||
Line 10: | Line 11: | ||
* for CASE1: when explanation was provided and is found satisfactory, set child ticket to 'verified' status | * for CASE1: when explanation was provided and is found satisfactory, set child ticket to 'verified' status | ||
4. When the deadline (7 working days) expired: | 4. When the deadline (7 working days) expired: | ||
* suspend sites qualified for suspension | * suspend in GOC DB sites qualified for suspension | ||
* prepare summary of explanations: | * prepare summary report of explanations (it should be placed in parent ticket): | ||
** sites which are not responsive | ** sites which are not responsive | ||
** sites which provided not satisfactory explanation | ** sites which provided not satisfactory explanation | ||
** ROCs/NGIs which are not responsive | ** ROCs/NGIs which are not responsive |
Revision as of 11:49, 23 July 2010
Under Construction
This page describes steps which should be taken by COD shifter to follow availability/reliability issues.
When GGUS ticket about availability/reliability metrics is assigned to COD: 1. add ticket url to Availability and reliability internal procedure for COD tickets page 2. review Ava/Rel report and prepare following lists:
- CASE 1: sites for suspension (Look at two previous months in AR report and the current one. If all are below 50% then sites qualifies for suspension.)
- CASE 2: sites to be asked for explanation (below 75% for reliability and 70% for availability)
3. Generate child tickets for both lists
- for CASE1: when explanation was provided and is found satisfactory, set child ticket to 'verified' status
4. When the deadline (7 working days) expired:
- suspend in GOC DB sites qualified for suspension
- prepare summary report of explanations (it should be placed in parent ticket):
- sites which are not responsive
- sites which provided not satisfactory explanation
- ROCs/NGIs which are not responsive