VT Inter-Usage Report, part II

From EGIWiki
Revision as of 12:26, 1 March 2012 by Sarac (talk | contribs) (Created page with '{{VirtualTeamProject | VTP_Leader = TBD | VTP_ML = | VTP_Status = Proposed | VTP_StartDate = as soon as possible | VTP_EndDate = end March | VTP_Meetings = | VTP_Motivation…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

General Project Information

  • Leader: TBD
  • Mailing List:
  • Status: Proposed
  • Start Date: as soon as possible
  • End Date: end March
  • Meetings:

Motivation

Follow up of the VT Inter NGI Usage Report and another step towards the goal of producing an EGI Usage Report.

Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place.

If not, estimating the complexity/effort needed to extend the functionality of the tools to produce those.

Output

In depth knowledge of the tools involved in producing the needed statistics.

Tasks

Members

  • EGI.eu:
    • Sara
  • NGIs - confirmed:
    • Germany: Torsten Antoni

Resources

Progress