Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

VT Inter-Usage Report, part II

From EGIWiki
Revision as of 20:10, 21 March 2012 by Gordon (talk | contribs)
Jump to navigation Jump to search

General Project Information

  • Leader: TBD
  • Mailing List:
  • Status: Proposed
  • Start Date: as soon as possible
  • End Date: end March
  • Meetings:

Motivation

Follow up of the VT Inter NGI Usage Report and another step towards the goal of producing an EGI Usage Report.

Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place.

If not, estimating the complexity/effort needed to extend the functionality of the tools to produce those.

Output

In depth knowledge of the tools involved in producing the needed statistics. (isn't this a prerequisite, rather than an output? JCG)

Tasks

Members

  • EGI.eu:
    • Sara
  • NGIs - confirmed:
    • Germany: Torsten Antoni
    • UK: John Gordon

Resources

Progress