Difference between revisions of "VT Inter-Usage Report, part II"
Jump to navigation
Jump to search
m (moved VT Feasibility Usage Report to VT Inter-Usage Report) |
|||
Line 1: | Line 1: | ||
{{VirtualTeamProject | | {{VirtualTeamProject | | ||
VTP_Leader = | VTP_Leader = Kostas Koumantaros | | ||
VTP_ML = | | VTP_ML = vt-egi-usage-report@mailman.egi.eu | | ||
VTP_Status = Proposed | | VTP_Status = Proposed | | ||
VTP_StartDate = as soon as possible | | VTP_StartDate = as soon as possible | | ||
VTP_EndDate = end | VTP_EndDate = end May / start June (subject to implementation restrictions) | | ||
VTP_Meetings = | VTP_Meetings = | ||
| | | | ||
VTP_Motivation = | VTP_Motivation = | ||
Following the [[VT Inter NGI Usage Report]], this VT aims to: | |||
* Produce the first EGI Usage Report. | |||
* Document caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult. This is probably as important as the report itself, given that | |||
Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place. | Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place. |
Revision as of 09:35, 23 April 2012
General Project Information
- Leader: Kostas Koumantaros
- Mailing List: vt-egi-usage-report@mailman.egi.eu
- Status: Proposed
- Start Date: as soon as possible
- End Date: end May / start June (subject to implementation restrictions)
- Meetings:
Motivation
Following the VT Inter NGI Usage Report, this VT aims to:
- Produce the first EGI Usage Report.
- Document caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult. This is probably as important as the report itself, given that
Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place.
If not, estimating the complexity/effort needed to extend the functionality of the tools to produce those.
Output
In depth knowledge of the tools involved in producing the needed statistics. (isn't this a prerequisite, rather than an output? JCG)
Tasks
Members
- EGI.eu:
- Sara
- NGIs - confirmed:
- Germany: Torsten Antoni
- UK: John Gordon