Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "VT Inter-Usage Report, part II"

From EGIWiki
Jump to navigation Jump to search
(Created page with '{{VirtualTeamProject | VTP_Leader = TBD | VTP_ML = | VTP_Status = Proposed | VTP_StartDate = as soon as possible | VTP_EndDate = end March | VTP_Meetings = | VTP_Motivation…')
 
 
(27 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{EGI_Activity_groups_menubar}}
{{Menubar_VT}}
{{TOC_right}} 
[[Category:Virtual_Teams]]
This virtual team follows up on the work developed as part of the [[VT Inter-Usage Report, part I]].
{{VirtualTeamProject |  
{{VirtualTeamProject |  
VTP_Leader = TBD |
VTP_Leader = Kostas Koumantaros & Sara Coelho |
VTP_ML =  |
VTP_ML = vt-egi-usage-report@mailman.egi.eu |
VTP_Status = Proposed |
VTP_Status = Proposed |
VTP_StartDate = as soon as possible |
VTP_StartDate = 30 May 2012 |
VTP_EndDate = end March |  
VTP_EndDate = CLOSED  |  
VTP_Meetings =  
VTP_Meetings =  
  |
  |


VTP_Motivation =   
VTP_Motivation =   
Follow up of the [[VT Inter NGI Usage Report]] and another step towards the goal of producing an EGI Usage Report.
Following the [[VT Inter-Usage Report, part I]], this VT aims to:
 
* Produce the first EGI Usage Report.
Evaluating if the statistics/graphics needed for the EGI Usage report can be produced with the tools that are in place.
* Document caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult.  


If not, estimating the complexity/effort needed to extend the functionality of the tools to produce those.
|  
|  


VTP_Output =
VTP_Output =
In depth knowledge of the tools involved in producing the needed statistics.
 
* EGI Usage Report with a Table of Contents outlined in [[VT Inter-Usage Report, part I]], including a list of caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult.
 
*'''[https://documents.egi.eu/document/1670 The first NGI Inter-Usage Report was published in March 2013]'''
*'''[http://go.egi.eu/VT-interusage-slides Summary slides]'''


|
|
VTP_Tasks =   
VTP_Tasks =   
*'''Task 1:''' Send list of requirements to Accounting Portal (1st week of April)
*'''Task 2:''' Add the required views to the Accounting portal (as soon as possible)
*'''Task 3:''' Collect the data & first interpretation (depends on Task 2)
*'''Task 4:''' Prepare the report according to the TOC (depends on Task 3)


|
|
VTP_Team =
VTP_Team =
* EGI.eu:
* NGIs
** Sara
* NGIs - confirmed:
** Germany: Torsten Antoni
** Germany: Torsten Antoni
** Croatia: Emir Imamagic
** Spain: Álvaro Simon & Iván Díaz
** Greece: Kostas Koumantaros
** UK: John Gordon (gordon)
** PL: Mariusz Sterzel
** Serbia: Antun Balaz (antun) and Vladimir Slavnic (vladimir)
* EGI.eu
** Sara Coelho & Tiziana Ferrari
|
|
VTP_Progress =
VTP_Progress =
*'''Task 1:''' Send list of requirements to Accounting Portal ---- COMPLETED (RT ticket n.3596: https://rt.egi.eu/rt/Ticket/Display.html?id=3596)
*'''Task 2:''' Add the required views to the Accounting portal ---- IN PROGRESS
*'''[https://documents.egi.eu/document/1670 The first NGI Inter-Usage Report was published in March 2013]'''


|
|
VTP_Resources =  
VTP_Resources =  
* [https://documents.egi.eu/document/1151  Requirements Document ] (also with comments from John and Ivan)
* [https://documents.egi.eu/document/1670 The first NGI Inter-Usage Report]
   
   
}}
}}

Latest revision as of 16:03, 19 June 2015

EGI Activity groups Special Interest groups Policy groups Virtual teams Distributed Competence Centres


EGI Virtual teams: Main Active Projects Closed Projects Guidelines

This virtual team follows up on the work developed as part of the VT Inter-Usage Report, part I.

General Project Information

  • Leader: Kostas Koumantaros & Sara Coelho
  • Mailing List: vt-egi-usage-report@mailman.egi.eu
  • Status: Proposed
  • Start Date: 30 May 2012
  • End Date: CLOSED
  • Meetings:

Motivation

Following the VT Inter-Usage Report, part I, this VT aims to:

  • Produce the first EGI Usage Report.
  • Document caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult.

Output

  • EGI Usage Report with a Table of Contents outlined in VT Inter-Usage Report, part I, including a list of caveats / accounting restrictions / and other assorted problems that make an accurate inter-usage analysis difficult.

Tasks

  • Task 1: Send list of requirements to Accounting Portal (1st week of April)
  • Task 2: Add the required views to the Accounting portal (as soon as possible)
  • Task 3: Collect the data & first interpretation (depends on Task 2)
  • Task 4: Prepare the report according to the TOC (depends on Task 3)

Members

  • NGIs
    • Germany: Torsten Antoni
    • Croatia: Emir Imamagic
    • Spain: Álvaro Simon & Iván Díaz
    • Greece: Kostas Koumantaros
    • UK: John Gordon (gordon)
    • PL: Mariusz Sterzel
    • Serbia: Antun Balaz (antun) and Vladimir Slavnic (vladimir)
  • EGI.eu
    • Sara Coelho & Tiziana Ferrari

Resources

Progress