Difference between revisions of "VT EGI Pay-for-Use Meetings"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
*Date/Time: Thurs 13 Feb 2014 - 12:00 CET | *Date/Time: Thurs 13 Feb 2014 - 12:00 CET | ||
*Agenda: | *Agenda: | ||
**Review of previous meeting | **Review of previous meeting [https://documents.egi.eu/document/2088 minutes] | ||
**Update on | **Update on [https://wiki.egi.eu/wiki/EGI_Pay-for-Use_PoC_Actions open actions] | ||
**Discussion on defining the | **Discussion on defining the [https://wiki.egi.eu/wiki/EGI_Pay-for-Use_PoC_Business_Cases/Workplan business cases] to be run/analyzed | ||
***Resource Center selling capacity as a means of cost recovery | ***Resource Center selling capacity as a means of cost recovery | ||
***Storage as a service (Opportunity with through long-term data preservation pilot - Open data pilots deployment) | ***Storage as a service (Opportunity with through long-term data preservation pilot - Open data pilots deployment) | ||
****https://indico.egi.eu/indico/getFile.py/access?contribId=5&resId=0&materialId=slides&confId=1858 | ****https://indico.egi.eu/indico/getFile.py/access?contribId=5&resId=0&materialId=slides&confId=1858 | ||
****http://www.elixir-europe.org/system/files/documents/2_oa_in_h2020_slides_jose_elixir_181213.pdf | ****http://www.elixir-europe.org/system/files/documents/2_oa_in_h2020_slides_jose_elixir_181213.pdf | ||
****Others? | ****Others? | ||
**Review of | **Review of [https://wiki.egi.eu/wiki/EGI_Pay-for-Use_PoC_Responsibilities Responsibilities->Topics]and interested participants | ||
***Definition of specific activities moving forward | |||
**EGI-InSPIRE PY5 TNA5.2 Institution Contacts | **EGI-InSPIRE PY5 TNA5.2 Institution Contacts | ||
**Confirm next call: Date and Time | **Confirm next call: Date and Time | ||
**AOB | **AOB | ||
*Call-in Details: WebEx conference system details circulated via mailing list | *Call-in Details: WebEx conference system details circulated via mailing list | ||
Revision as of 11:29, 11 February 2014
Pay-For-Use menu: | Home • | Processes/Instructions • | Service/Price Overview • | Service Management • | Legal/Policy • | Actions • | Meetings • |
Minutes from each meeting are available here.
Meeting 2:
- Date/Time: Thurs 13 Feb 2014 - 12:00 CET
- Agenda:
- Review of previous meeting minutes
- Update on open actions
- Discussion on defining the business cases to be run/analyzed
- Resource Center selling capacity as a means of cost recovery
- Storage as a service (Opportunity with through long-term data preservation pilot - Open data pilots deployment)
- Review of Responsibilities->Topicsand interested participants
- Definition of specific activities moving forward
- EGI-InSPIRE PY5 TNA5.2 Institution Contacts
- Confirm next call: Date and Time
- AOB
- Call-in Details: WebEx conference system details circulated via mailing list
Meeting 1:
- Date/Time: Thurs 23 Jan 2014 - 12:00 CET
- Agenda:
- Understand the rationale and scope of activities
- Outline group communication: wikipage; mailing list; initially semi-monthly calls of approx 1hr via WebEx (better to fix same time same day)
- Refine objectives
- Discuss milestones, draft workplan and responsibilities
- Define a target for presentation at the EGI-InSPIRE EC Review
- Agree on final output
- Call-in Details: WebEx conference system details circulated via mailing list