Difference between revisions of "VT EGI Compendium Meeting 01"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
##Goals | ##Goals | ||
##Schedule | ##Schedule | ||
###full draft for external review ready by 20/01/2012 | ###full [[draft]] for external review ready by 20/01/2012 | ||
###launch survey: 31/01/2012 | ###launch survey: 31/01/2012 | ||
###data collection period: 01/02/2012-29/02/2012 | ###data collection period: 01/02/2012-29/02/2012 | ||
Line 17: | Line 17: | ||
#Background material | #Background material | ||
#Brainstorm structure of the Compendium | #Brainstorm structure of the Compendium | ||
#Options for tool to collect data | #Options for tool to collect data | ||
#Next actions | #Next actions | ||
#AOB | #AOB |
Revision as of 14:20, 12 December 2011
General Info
- Date: XX/12/2011
- Time:
- How to Join:
Agenda
- Introduction of the project
- Goals
- Schedule
- full draft for external review ready by 20/01/2012
- launch survey: 31/01/2012
- data collection period: 01/02/2012-29/02/2012
- first results presented at the EGI Community Forum
- Introduction of NGI partners (motivation to attend, background, previous experience)
- Background material
- Brainstorm structure of the Compendium
- Options for tool to collect data
- Next actions
- AOB
- Next meeting