Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "VT EGI Compendium Meeting 01"

From EGIWiki
Jump to navigation Jump to search
Line 9: Line 9:
#Introduction of the project  
#Introduction of the project  
##Goals  
##Goals  
##Schedule
##Schedule  
### full draft for external review ready by 20/01/2012
###full draft for external review ready by 20/01/2012  
### launch survey: 31/01/2012
###launch survey: 31/01/2012  
### data collection period: 01/02/2012-29/02/2012
###data collection period: 01/02/2012-29/02/2012  
### first results presented at the EGI Community Forum
###first results presented at the EGI Community Forum  
#Introduction of NGI partners (motivation to attend, background, previous experience)  
#Introduction of NGI partners (motivation to attend, background, previous experience)  
#Background material  
#Background material  
#Brainstorm structure of the Compendium  
#Brainstorm structure of the Compendium  
#Options for tool to collect data
#Next actions  
#Next actions  
#AOB  
#AOB  

Revision as of 12:25, 9 December 2011

General Info

  • Date: XX/12/2011
  • Time:
  • How to Join:

Agenda

  1. Introduction of the project
    1. Goals
    2. Schedule
      1. full draft for external review ready by 20/01/2012
      2. launch survey: 31/01/2012
      3. data collection period: 01/02/2012-29/02/2012
      4. first results presented at the EGI Community Forum
  2. Introduction of NGI partners (motivation to attend, background, previous experience)
  3. Background material
  4. Brainstorm structure of the Compendium
  5. Options for tool to collect data
  6. Next actions
  7. AOB
  8. Next meeting