Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

URT:Agenda-26-08-2013

From EGIWiki
Revision as of 15:01, 26 August 2013 by Ellert (talk | contribs) (→‎Globus)
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


UMD releases status

Status of the products verification/staged rollout

  • dCache 2.6.5: SR reports already submitted
  • UNICORE: UNICORE HILA and UVOS in the process. Contacted the EA to perform SR.
  • SLURM CREAM issue found in the info provider, investigating

Ready for the release

  • QCG products
  • EMIR 2.0.0
  • Argus 1.6.1
  • CREAM 1.15.2
  • CREAM-GE 2.0.2
  • Glexec 1.2.1
  • UNICORE.X6 6.0.1
  • IGE.gridway 5.14.0
  • IGE.globus-gridftp 5.2.4
  • GridSite 2.1.3 & GridSite 1.7.28 – TB ready by EO August

Updates from the product teams

This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.

APEL

  • Release version x.y.z Expected: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

ARC

  • Release version 3.0.3 Expected: 2013-07-31
    • Main changes: bugfix release
    • Other information: none

Argus

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

dCache

  • dCache Release Schedule
    • 2.6.5 will be released 16 July 2013 (SHA-2 support)
    • 2.2 none SHA-2 release 23 July 2013
    • 2.2 SHA-2 release
    • Main changes: (including other products affected)
      • SHA-2 support
    • Other information:

DPM/LFC

DPM/LFC is moving to a new build infrastructure and new development/testing lifecycle.

GFAL/lcg_utils

This release depends on Davix 0.2 (initial preview version of http/webdav toolkit) which is under EPEL review. It will take 2-3 weeks to be reviewed and released. Then, GFAL could be released in a few days.

Release under EPEL review. It will take 2-3 weeks to be reviewed and released.

FTS

  • Release version 3.0.0 Expected on: July 2013
    • Main changes:
    • Other information:

FTS 3 is about to be reviewed EPEL. It will then take 2-3 weeks to be reviewed and released.

BDII

  • Release version: Update 2 Expected on: end of July 2013

Development has not started yet. This is a minor release to fix a security vulnerability and implement some enhancements in both BDII configuration and glue-validator.

EMIR

  • Released EMIR Server v1.3.0 and SERP v1.2.3 on 12.07.2013
    • Main changes: (including other products affected)
    • Other information:

UNICORE

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

LB

Gridsite

Proxyrenewal

CANL

gLite- security

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

CREAM

STORM

  • Planned to be released - version 1.11.2 on: 2013-06-20
    • Main changes:
      • StoRM native libs call to change_group_ownership does not correctly forward exceptions to the parent java process
      • StoRM GPFS get_fileset_quota_info leaks file descriptors
    • Other information:

VOMS

  • Released of VOMS Admin Server v. 3.2.0 and VOMS Clients 3.0.2 on July 12th.
  • Next releases
    • Release version w.k.j Expected on: 2013-xx-yy
      • Main changes: (including other products affected)
      • Other information:


WMS

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

Globus

  • Release version 3.2.2 Expected on: 2013-08-26
    • Main changes: Bugfixes for GridWay, GSI-SSHTerm, BES-GRAM and Globus Info Provider Service
    • Other information: New jglobus release candidate package in testing repo

QCG

  • Released version 3.0.x
    • Main changes: Candidate for the first UMD release
    • Other information: RPMs SL6/6 of three main QCG components (QCG-Broker, QCG-Computing, QCG-Notifications including dependencies) and QCG-BrokerClient. The release will be published using the offical QCG repository: http://www.qoscosgrid.org/qcg-packages/sl5/x86_64/

Other topics

Support calendar of the latest versions

  • The Product ID page has been updated with the support calendar for the products released in the EMI major releases. Since some product team has released new versions of their products the support calendar may have changed. Please, check the information about your products, and update the support calendar for the newest releases not yet listed in the page.
  • Added a field "Product main web page". Please, add a link to the reference site for your products (e.g. www.dcache.org for dCache).

Pull products from EPEL or other repositories

There have been not much progress from our side (holidays did not help). I am collecting examples of new product releases in EPEL stable and EPEL-testing to use for dry runs. This is mainly an activity internal to EGI.

  • Starting with DPM
  • Other proposals are welcome
    • I need the list of all and only packages composing the release, to isolate them from the other packages in EPEL.

EGI SA2 is also working on enabling the AppDB to be used as an entry point for UMD, still in progress.

Talks for the Technical forum

Monday afternoon

  • GSISSH-Term
  • QCG
  • dCache
  • ARC

There is still room for one or two talks, please contact me if you had any inspiration :)

Other meetings: URT F2F Wednesday afternoon.

AOB

Audio conference details

Room link: http://connect.ct.infn.it/egi-inspire-sa1/

Please provide you Name and product team/affiliation as Guest Name.

In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.

You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm

Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/

Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.

Back to the URT agendas list page: URT_meetings_agendas